Bromley, London
Construction drawings in Bromley
Bromley mixes dense heritage controls with a householder record in which not every decision arrives on time, so a construction set here has to be exact about constraints and patient about timing. We draw the build-ready pack after the council has settled the design. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on construction drawings
Five steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Building regulations
Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.
Approval and hand-over
Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Construction drawings in Bromley: the Urban Design Guide and your plot
We found no Bromley rule about construction drawings, and Building Regulations do not vary by borough. The council's design reference for home alterations is the Urban Design Guide SPD, supported by the Bromley Local Plan, adopted in 2,019. Check whether a newer plan has replaced it before you rely on a design principle.
The practical consequence is that the planning officer's report, not a general rulebook, is the authority we draw to. We read it line by line, lift every measurement and condition into the specification, and flag anything the report assumed that the survey disproves.
Our planning drawings in Bromley lead into this stage, but if the permission came from elsewhere we start from the decision notice.

Local figures for Bromley
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 47 named conservation areas published by the council | — | planning.data.gov.uk |
| Article 4 directions | 108 Article 4 directions published by the council | — | planning.data.gov.uk |
| Listed building entries | 412 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Heritage at Risk entries | 25 Heritage at Risk Register entries within the LPA boundary (Historic England) | — | planning.data.gov.uk |
| Green Belt share of the council area | 51 % of council area covered by green-belt polygons | — | planning.data.gov.uk |
| Householder applications granted | 78.6 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 89.1 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder appeals allowed | 37.6 % of householder appeals allowed | decision dates 1 Jul 2021 to 30 Jun 2026 | assets.publishing.service.gov.uk |
| Local plan adopted | 2,019 | — | bromley.gov.uk |
| Approved Document K 2013, para 1.11, Diagram 1.3 | 2.0 m clear headroom over stairs | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Conservation areas, Article 4 and green belt in one borough
Bromley has 47 conservation areas, 108 Article 4 directions, 412 listed entries and 25 heritage assets at risk. Green Belt covers 51 per cent of the area, and 9 scheduled monuments sit inside the boundary.
For an owner, the point is the number of directions: with that many, the chance your street is covered is real. We check the list before quoting, and where a direction applies, the specification repeats the existing window and roof detail rather than inventing a modern one.
Houses make up 68.6 per cent of households, and 68.5 per cent are owner-occupied, so most clients are families extending in place.
Slower decisions, longer lead times
Bromley decided 1,609 householder applications in its latest published year. It granted 78.6 per cent, and only 89.1 per cent were decided in time.
The Planning Inspectorate decided 502 householder appeals and allowed 37.6 per cent. Larger home extension prior approvals were few: 3 granted, 15 refused.
What this means for you: plan your builder's start date from the decision, not the validation letter, and leave room for conditions to be discharged. Construction drawings drawn too early often need revising once conditions land.
Details an inspector will check
Three standards recur in every set we issue for Bromley. Stairs: Private stair: rise 150-220 mm, going 220-300 mm, max pitch 42°, 2R+G 550-700 mm. Headroom: 2.0 m clear headroom over stairs. Ventilation: Intermittent extract: kitchen 30 l/s with cooker hood (60 l/s otherwise), utility 30 l/s, bathroom 15 l/s, WC 6 l/s.
On a large house the services drawing matters more than people expect. We route every duct and soil pipe before the structure is fixed, so a beam does not end up where a stack must pass.
Conditions, discharge and the builder's start date
Bromley decisions often carry conditions on materials, landscaping, drainage or construction hours. A condition is not a formality: until it is discharged, the council can treat work as unauthorised. Our specification lists each one, says which drawing satisfies it and marks the ones that need a separate submission.
Material conditions are the commonest. The council may ask for samples of brick, roof tile or window frame before work starts, and a builder who has already ordered the wrong product has a problem. We name a primary product and an alternative in the specification, so a delay in one supply chain does not stop the job.
Where Green Belt or a direction applies, the approved volume is fixed. We mark the approved external dimensions on the drawing in a distinct note, so nobody on site adds a few centimetres thinking it will pass unnoticed.
Scope, cost and other services
The fee is fixed after our free check, and covers survey-based plans, sections, details, schedules and a specification. Bromley's residential levy is £120.12/m² (Residential development excluding residential development which delivers additional care and support services), so floor areas on the drawings feed directly into a cost you will face.
If structural design is needed, see structural calculations in Bromley; for the regulatory submission, building regulations drawings in Bromley. The council overview is architectural drawings in Bromley. Neighbours: Croydon and Bexley.
What you receive


Related pages
Other services in Bromley
Questions
Why do Bromley projects take longer to start?
The council decided only 89.1 per cent of householder applications in time in its latest year, so decisions, and then conditions, can arrive later than a builder expects.
Is my Bromley house covered by an Article 4 direction?
Possibly. The council publishes 108 directions. We check the map for your address before we quote and tell you what it limits.
Do Bromley construction drawings include structural design?
They show the structure, but the engineer's calculations are separate. We coordinate the two so beam positions and sizes agree.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- bromley.gov.uk, retrieved
- gov.uk, retrieved
- bromley.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- gov.uk, retrieved
- bromley.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.