Croydon, London

Construction drawings in Croydon

Croydon's homes are mostly houses, and its conservation guidance is a single document. A construction set here is about getting good value from a build that must still meet every regulation. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on construction drawings

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Brick house being extended, with a wide new opening supported over the ground floor

    Construction drawings in Croydon and the conservation guidance

    Croydon has one supplementary document for home alterations in our research: the Conservation Areas General Guidance SPD. It sits beneath the Croydon Local Plan 2018, adopted in 2,018, and it matters mainly for the 19 conservation areas. We found no Croydon rule about construction drawings. That is normal, and it leaves the planning decision as the document we draw to.

    For a house outside a conservation area, our reference is the officer's report on your planning decision, and any condition attached. For a house inside one, the general guidance tells us what the council will protect: frontage, roof covering, windows and boundary walls. Those details become line items in our specification.

    This is also a borough with an Article 4 direction on houses in multiple occupation, so a project that changes how many people live in a house should be checked first. A direction like that can turn a modest conversion into a full application, and it is far cheaper to learn that before a builder is booked than after. Planning drawings in Croydon sort the route out before the construction set starts.

    House extension under construction with scaffolding, new glazed doors and building materials

    Local figures for Croydon

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas19 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries180 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Scheduled monuments8 scheduled monuments intersecting the LPA boundary (Historic England)—planning.data.gov.uk
    Green Belt share of the council area25 % of council area covered by green-belt polygons—planning.data.gov.uk
    Households living in a house60.2 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Domestic gardens share of land (GLUD 2005)32.8 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk
    Average house price390,041 GBP2026-07publicdata.landregistry.gov.uk
    Householder applications granted86.6 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Larger home extension prior approvals refused34 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Approved Document L Vol 1 2021 incl. 2023 amendments, Table 4.2New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Croydon
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Houses, gardens and affordable plots

    60.2 per cent of Croydon households live in a house, and 54.7 per cent own their home. The average price is £390,041, so cost discipline matters: a set that prevents site variations pays for itself.

    Gardens are a feature. Domestic gardens take up 32.8 per cent of the land area. That makes rear extensions and garden buildings common, and it is why drainage layouts and tree roots appear so often on our Croydon drawings.

    The designations are modest: 19 conservation areas, 180 listed entries and 8 scheduled monuments. Green Belt covers 25 per cent of the borough.

    Getting the build-up right

    On a cost-sensitive project, the specification does the work. New elements must meet these limiting values: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. We name the product, the thickness and the junction detail, so the builder prices a known system and does not allow for an unknown one.

    Ventilation is next: Intermittent extract: kitchen 30 l/s with cooker hood (60 l/s otherwise), utility 30 l/s, bathroom 15 l/s, WC 6 l/s. And workmanship: Approved Document 7: Materials and workmanship, 2013 edition incorporating 2018 amendments.

    What Croydon's figures say

    The council decided 786 householder applications in its latest year, granting 86.6 per cent, with 94.4 per cent decided in time. Larger home extension prior approvals ran at 17 granted and 34 refused, and the council handled 494 lawful development certificate applications.

    The ratio on prior approvals suggests that larger extensions need care in how they are presented. Past figures never settle your case, but they set the tone for how we advise on route and timing.

    Gardens, drains and trees

    With domestic gardens covering 32.8 per cent of the land, a Croydon rear extension usually has a drain, a tree or a boundary wall to deal with. The first thing we ask for is a drain survey and a note of any tree within reach of the footprint, protected or not.

    Tree roots decide foundation depth, and foundation depth decides cost. The drawings show the engineer's chosen depth and the reason for it, so the builder prices the right foundation first time.

    Drainage is the next line item. A new bathroom or kitchen adds a connection, and a connection can mean building over an existing sewer, which needs the water company's agreement. We flag that on the drainage layout and tell you who has to be asked.

    Fee, structure and nearby boroughs

    The fee is fixed after the free check. Mayoral CIL sits in band 3, and the borough levy is set by the London Borough of Croydon Community Infrastructure Levy Charging Schedule April 2013; we confirm the current rate when we quote.

    Add structural calculations in Croydon when beams or foundations are changing, and building regulations drawings in Croydon for the submission. The borough summary is architectural drawings in Croydon. Next door: Bromley and Bexley.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Does Croydon have a rule for construction drawings?

    No. The Building Regulations are national. What Croydon has is conservation guidance and planning conditions, which our drawings must follow.

    Is Croydon cheaper to build in?

    An average price of £390,041 says nothing about build costs, which depend on the specification. A thorough set helps control them.

    Can I convert my Croydon house to an HMO?

    Croydon has an Article 4 direction on HMOs, so planning permission is likely to be needed. Ask us before you draw anything.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.