Harrow, London
Architectural drawings in Harrow
In Harrow 65.4 per cent of households live in a house, so extensions and lofts make up much of the borough's planning work. We are MCIAT chartered architectural technologists, and our architectural drawings in Harrow start at £745 including VAT, after a free look at your address for conservation area, Green Belt and listing constraints.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

Harrow in numbers
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 31 named conservation areas published by the council | — | planning.data.gov.uk |
| Green Belt share of the council area | 22 % of council area covered by green-belt polygons | — | planning.data.gov.uk |
| Listed building entries | 295 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Householder decisions | 917 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications granted | 81.7 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 93.7 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Households living in a house | 65.4 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Owner-occupied households | 58.8 % of households owner-occupied (owned outright or with mortgage/loan) | Census 2021 | nomisweb.co.uk |
| Mayoral CIL charging band | 2 MCIL2 charging band (1-3) | — | london.gov.uk |
| Mayoral CIL rate (indexed) | 72.73 £/m² (indexed, permissions granted in 2026) | — | london.gov.uk |
| Larger home extension prior approvals granted | 27 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Larger home extension prior approvals refused | 108 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Lawful development certificate applications (PS1) | 461 certificates | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Local plan | Harrow Local Plan 2021-2041 | — | harrow.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Householder applications by street in Harrow
| Street | Applications | Approved |
|---|---|---|
| Headstone Lane | 31 | 79% |
| Norman Crescent | 28 | 78% |
| Albury Drive | 26 | 75% |
| Suffolk Road | 25 | 76% |
| Howberry Road | 24 | 96% |
| Evelyn Drive | 22 | 84% |
| Moss Lane | 22 | 63% |
| Whitchurch Gardens | 22 | 88% |
| Cannonbury Avenue | 21 | 90% |
| Kings Road | 21 | 53% |
| Sylvia Avenue | 21 | 95% |
| Cannon Lane | 20 | 84% |
| Alicia Gardens | 19 | 88% |
| South View Road | 19 | 61% |
| Christchurch Avenue | 18 | 60% |
Constraints check: Harrow
What we check first on any Harrow address. Counts are for the whole council area.
- A · Conservation areas
- 31 named conservation areas published by the council
- C · Listed building entries
- 295 list entries (Historic England, within the LPA boundary)
How Harrow's planning rules shape a house project
Harrow's development plan is the Harrow Local Plan 2021-2041, adopted in 2,026. It is a recent plan, so applications decided from now on are tested against fresh policy wording rather than the older document many online guides still describe.
For household alterations the council leans on its Residential Design Guide SPD. It frames how officers read side extensions, rear depth and roof changes.
Where a house sits matters as much as what you want to build. The same two-storey side extension can be routine on one road and awkward on the next.

Conservation areas, Green Belt and listed homes in Harrow
The council publishes 31 conservation areas. Inside one, permitted development is cut back, and a loft conversion that changes the roof slope on the front or side needs a full application.
Green Belt covers 22 per cent of the borough. Extensions to a Green Belt house are judged against how much larger the building becomes, so the size of what is already there sets your ceiling.
Historic England records 295 listed entries inside the boundary: 4 at Grade I, 20 at Grade II* and 265 at Grade II. Owners of a listed home need listed building consent for most work, which is a separate application.
Larger home extensions: the prior approval route in Harrow
A deeper single-storey rear extension can go through the larger home extension prior approval instead of a full application. Over the latest published year Harrow granted 27 of these and refused 108.
Refusals outnumber grants by a wide margin, and the council weighs the effect on neighbours closely. That is why we draw the neighbour's windows and boundary on the sheets before we advise which route to take.
If the work is plainly permitted development, a lawful development certificate in Harrow gives you proof. The council received 461 certificate applications in the same year, so it is a well-used step here.
What Harrow's decision record says
Harrow decided 917 householder applications in the latest twelve months and granted 81.7 per cent. About 93.7 per cent were decided in eight weeks or an agreed extension.
Those figures describe the borough as a whole and promise nothing for your house. They do show that complete, well-drawn householder applications are usually granted, and that eight weeks is a realistic planning horizon.
Many applicants find the council's online planning search useful before they commit. We read the neighbouring decisions for you during the constraints check.
Money and tenure: what to budget in Harrow
Harrow is in band 2 of the Mayor of London's levy, at £72.73 per square metre for permissions granted this year. The borough adds its own levy, shown as £196.43/m² (Residential, Use Class C3, borough-wide). Any liability is noted in the pack we give you at the end.
Of Harrow's households, 58.8 per cent own their home, and the average terraced house sold for £536,748 in the latest Land Registry figures. At that price, many owners weigh extending against moving.
The borough has an Article 4 direction for houses in multiple occupation, so turning a family house into a small shared house needs its own application.
How a Harrow job runs with us
You send the address and a short description. Within the free constraints check we look up the conservation area, Green Belt, listing and Article 4 position, and read recent decisions on your road.
You then get a fixed quote. After a measured survey of the house we draw the existing and proposed sheets, and a second chartered technologist checks every one against the council's validation list before a senior review signs the set off.
We submit through the Planning Portal. If the council asks for changes, we redraw at no charge.
Services we draw in Harrow
Most Harrow jobs begin with planning drawings in Harrow. Two popular ones are rear extension drawings in Harrow and loft conversion drawings in Harrow.
When the design is settled, building regulations drawings in Harrow cover the technical sheets. Over the border, we also draw for Brent, Hillingdon and Ealing.
What you receive


Services in Harrow
- Planning drawings in Harrow
- Lawful Development Certificates in Harrow
- Building regulations drawings in Harrow
- Structural calculations in Harrow
- House extension drawings in Harrow
- Rear extension drawings in Harrow
- Double-storey extension drawings in Harrow
- Loft conversion drawings in Harrow
- Dormer loft conversion drawings in Harrow
- Garage conversion plans in Harrow
Questions
Do I need planning permission for a loft conversion in Harrow?
Often a rear dormer is permitted development, but not in any of the 31 conservation areas or on a flat. We check your address first and tell you the route before you pay.
How much are architectural drawings in Harrow?
Our householder drawing sets for Harrow homes begin at £745 with VAT included, priced before we start. Harrow's planning fee goes to the council.
Is my Harrow house in the Green Belt?
About 22 per cent of the borough is. We check the boundary on your address in the free constraints check.
Which Harrow document covers extensions?
Mainly the Residential Design Guide SPD, read alongside the Harrow Local Plan 2021-2041. We prepare the drawings against both.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- london.gov.uk, retrieved
- london.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- harrow.gov.uk, retrieved
- harrow.gov.uk, retrieved
- harrow.gov.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.