020 7864 7245Request a fixed quote

Harrow, London

Structural calculations in Harrow

Structural calculations for a Harrow home start at £295 including VAT. Harrow is a borough of suburban houses, where the calculation is usually for a beam over a rear opening or a loft floor, set out so building control can check it in one read.

From £295 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Brick house being extended, with a wide new opening supported over the ground floor

    How Harrow handles structural calculations

    Harrow's guidance for domestic extensions and alterations explains the two building control routes. Under a building notice, the fee covers inspection of the work and checking of any details/calculations as may be required to show compliance. The same guidance says full plans must be used where building work is close to public sewers.

    A building notice lets work start sooner, but the examination moves to the site. If a calculation is requested halfway through, the beam may already be on order. We prefer to produce the calculations first, so that the builder starts with sizes the council has no reason to question.

    The council's charges for internal and structural alterations are set by estimated cost. Its table lists GBP 324.41 (to GBP 5,000); GBP 530.04 (GBP 5-25k) inc VAT, with higher bands for larger jobs. These charges are paid to the council and are separate from our fee.

    House extension under construction with scaffolding, new glazed doors and building materials

    Local figures for Harrow

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Building notice payment covers inspection of the work and checking of any details/calculations required to show compliance; full plans must be used near public sewers.checking of any details/calculations as may be required—harrow.gov.uk, Domestic Extensions & Alterations to a Single Dwelling, Scheme 15 guidance, Types of Applications, item 2
    Table C (Scheme 15, from 6 April 2026): 'Internal alterations ... and/or structural alterations' by estimated cost: up to 5,000 = 324.41 inc VAT; 5,000-25,000 = 530.04; 25,000-50,000 building notice 927.58; 50,000-75,000 building notice 1,457.50; over 75,000 individually determined. Underpinning (traditional, up to 10 m) 662.55.GBP 324.41 (to GBP 5,000); GBP 530.04 (GBP 5-25k) inc VAT—harrow.gov.uk, Harrow Schedule of Charges Table C, Scheme 15, Table C, Internal Alterations rows
    A structural engineer's report, and for substantial demolition a structural survey by a conservation-accredited surveyor, form part of a heritage statement; 'Structural Survey' appears in the further-information list. No basement-specific requirement in the checklist.Heritage only—harrow.gov.uk, Harrow National and Local Validation Checklist of Planning Applications (1 February 2024), pdf p.20, heritage statement items 7-8; Appendix 1 p.36
    Households living in a house65.4 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households58.8 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Green Belt share of the council area22 % of council area covered by green-belt polygons—planning.data.gov.uk
    Conservation areas31 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries295 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Householder decisions917 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    AD A title pageApproved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments—gov.uk
    Building Regulations 2010 reg 11FDesign work must be done by a competent person—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Harrow
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Semis, extensions and where the loads go

    Harrow's households are mostly in houses: 65.4 per cent live in a house or bungalow, and 58.8 per cent own their home. The council decided 917 householder applications in its latest year.

    Take a rear or wrap-around extension with a wide opening onto the garden and a loft room above. That combination loads the same walls twice: once at ground level for the new beam, and again when the loft adds weight to the first floor. We check the whole load path from roof to foundation.

    A side return or a garage conversion also changes bearing. Where an old garage wall has served as a boundary, it may not be fit to carry a new floor.

    Green Belt, heritage and what planning needs

    22 per cent of Harrow is covered by Green Belt polygons, and the borough has 31 conservation areas and 295 listed entries. Householder planning follows the Residential Design Guide SPD and the new Harrow Local Plan 2021-2041, adopted in 2,026.

    Structure rarely needs its own planning paperwork here. Harrow's checklist asks for a structural engineer's report only as part of a heritage statement, and for substantial demolition a structural survey by a conservation-accredited surveyor. The council describes this requirement as: Heritage only. There is no basement-specific item in the checklist.

    Conversions of a garage or loft to living space also raise Building Regulations matters beyond structure, such as fire protection and insulation. Those sit with the construction drawings, and we coordinate them so that the structure in the calculation matches the structure in the specification.

    That leaves the calculation for building control, and the structural layout for the planning drawings so the two agree.

    What our Harrow survey records

    Before we calculate, we measure the opening and record the type and thickness of the wall, what sits above and below it, and the condition of the bearings. In a semi the beam can land on the party wall, so we record the wall's construction and flag a party wall notice where the work meets the boundary.

    You may wonder whether the calculation can wait until the builder is chosen. It can, but the quote is better for having it. A builder pricing from a beam schedule prices the steel, the padstones and the temporary support once, instead of adding a contingency for what might turn up.

    We also record the loads: floor finishes, the roof covering and any chimney stack. Those figures are written into the calculation, so anyone checking it later can see exactly what it assumed.

    Harrow fee, timing and checks

    Structural calculations start at £295 including VAT, fixed after the constraints check. You receive the calculations, a beam and padstone schedule and a layout drawing, normally about a week after the survey. A second technologist checks the set, and we revise at no charge if the examiner asks.

    The figures carry into our building regulations drawings in Harrow, and into the planning drawings in Harrow where permission is needed.

    Nearby and related

    For the borough, see architectural drawings in Harrow. The service is described on the structural calculations page, and a neighbouring approach is set out in Ealing.

    What you receive

    Structural calculation sheet for a steel beam
    Sample drawing. Structural calculation for a steel beam, coordinated with the engineer.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Load take-down
    Brush across the bars.

    Questions

    Does Harrow need structural calculations?

    Where a project changes how the building carries load, building control will want to check them. The council's building notice fee covers checking of any details/calculations as may be required.

    How much do structural calculations cost in Harrow?

    From £295 including VAT, fixed up front. Harrow's building control charges are separate.

    Can I use a building notice near a sewer in Harrow?

    No. Harrow's guidance says full plans must be used near public sewers.

    Does Harrow ask for a structural report with planning?

    Only in some cases. Its checklist records it as: Heritage only.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.