020 7864 7245Request a fixed quote

Harrow, London

New build drawings in Harrow

Harrow tests a new house with two geometric rules from its Residential Design Guide: a 45 degrees sight line from neighbours' windows, and a limit on flank windows near the boundary. We prepare new build drawings for Harrow plots from £1,450 including VAT, with a second chartered technologist checking every sheet.

From £1,450 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on new build drawings

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Red-brick mansion blocks and shopfronts on a street corner

    Harrow's 45-degree code and the flank wall rule

    The Residential Design Guide SPD says that new development should not interrupt 45 degrees lines, drawn on plan and in elevation, from the protected windows of neighbouring homes. The council calls it the 45-degree code, and for a new house on a narrow plot it often decides how far back the building can sit and how high the rear wall can run.

    The guide has a second rule that catches infill designs. In developments of up to three storeys, large windows in a flank wall within 3m of a boundary are treated as unacceptable, even when obscure glazed. On a side-garden plot the new house is usually that close to the boundary, so the flank wall is designed as a quiet elevation, with light brought in from the front and rear.

    We test both rules in the Revit model before drawing anything for submission, and we show the construction lines on the sheets, so the officer can check the geometry on the page.

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Local figures for Harrow

    Figures with their unit, period and source
    MeasureValuePeriodSource
    New development should not interrupt 45-degree lines (on plan and in elevation) from neighbouring protected windows (the 45 Degree Code).45 degrees—harrow.gov.uk, Residential Design Guide SPD 2010, p.25-26, paras 4.66-4.70
    In developments up to three storeys, large windows in a flank wall within 3m of a boundary are unacceptable even if obscure glazed.3m—harrow.gov.uk, Residential Design Guide SPD 2010, p.27, para 4.77
    Minor application decisions341 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications granted60.4 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications decided in time85.6 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Green Belt share of the council area22 % of council area covered by green-belt polygons—planning.data.gov.uk
    Borough CIL residential rate£196.43/m² (Residential, Use Class C3, borough-wide)2026 indexed rate; schedule rate £110/m² (index 224 to 400)harrow.gov.uk
    Mayoral CIL charging band2 MCIL2 charging band (1-3)—london.gov.uk
    Mayoral CIL rate (indexed)72.73 £/m² (indexed, permissions granted in 2026)—london.gov.uk
    Conservation areas31 named conservation areas published by the council—planning.data.gov.uk
    Domestic gardens share of land (GLUD 2005)34.7 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk
    Erection of dwellinghouses, not more than 10: per dwellinghouse, from 1 Apr 2026610 GBP per dwelling—ribblevalley.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Harrow
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    A borough of houses, with green belt at the edge

    Harrow is mostly houses, with 65.4 per cent of households living in one and 58.8 per cent owning outright or with a mortgage. Domestic gardens cover 34.7 per cent of the land in the national land use survey, the raw material for most side-plot and rear-garden proposals.

    Green belt covers 22 per cent of the council area. On a plot inside it, national policy on inappropriate development applies, and we establish this before any design is drawn. The borough also has 31 conservation areas, 295 listed building entries and 22 Heritage at Risk entries.

    The development plan is the Harrow Local Plan 2021-2041, adopted in 2,026. Because it is new, the weight given to older guidance can shift, and we confirm at the time of submission which policies the council is applying.

    How Harrow has decided minor schemes

    Harrow decided 341 minor applications in the latest return. It granted 60.4 per cent, much lower than the 81.7 per cent it granted among 917 householder decisions, and decided 85.6 per cent within eight weeks or an agreed extension.

    The distance between the two grant figures is the reason the geometry above matters. A proposal that reaches an officer with the lines already checked has fewer reasons to be sent back. These are past figures for all minor cases, which include extensions and changes of use, so they are not a forecast for your site.

    Our planning drawings in Harrow page covers the application stage in more detail.

    Levies and fees

    Harrow's borough CIL for new houses is £196.43/m² (Residential, Use Class C3, borough-wide) Mayoral CIL is charged in band 2, at £72.73 per square metre this year. The application fee is £610 per dwelling for up to nine homes.

    Once consent is in place, building regulations drawings in Harrow turn the design into construction sheets for the builder.

    Turning the two Harrow rules into drawings

    A rule that depends on geometry is best checked by geometry. For the sight-line rule we draw the line from the centre of each protected neighbouring window, at the stated angle, on the plan and again on the elevation. Anywhere the proposed building crosses a line, we either cut it back or explain on the sheet why the window is not protected.

    For the flank-window rule we mark the boundary, measure the distance to the wall and draw the window schedule beside it. If a flank opening is needed for a staircase or a bathroom, a rooflight or a high-level window of limited size is the usual alternative, and we describe it in the design note so the officer knows it was a choice and not an oversight.

    Both checks come before design details. There is little point in refining a facade that must lose a metre of depth, so we run them early and share the result with the client as a short note.

    The same discipline protects you in appeal. If an application is refused on a point of geometry, a set that already shows the lines gives a clear basis for discussion, and our planning appeals support in Harrow is available if it comes to that.

    What happens first

    Send the address. We check green belt, heritage and the levy, send a fixed quote, survey the site and test two or three layouts against the Harrow rules. You choose one in writing. If the council requests changes, we redraw free until approval, and we cannot promise a decision.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Georgian brick terrace with sash windows, arched fanlight doorways, stone steps and iron railings in London
    Points, not guesses
    Paint across the grid with the pointer.

    Questions

    What is the 45-degree code in Harrow?

    It asks that new development does not interrupt 45 degrees lines from neighbours' protected windows, on plan and in elevation, under the Residential Design Guide SPD.

    Can a new Harrow house have side windows?

    In developments up to three storeys, large flank windows within 3m of a boundary are unacceptable even if obscure glazed. We design the flank wall to avoid them.

    How much CIL applies in Harrow?

    The borough rate is £196.43/m² (Residential, Use Class C3, borough-wide) Mayoral CIL is £72.73 per square metre this year.

    How often are minor schemes granted in Harrow?

    60.4% of 341 minor decisions in the latest return, a historic figure that cannot predict your case.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.