Haringey, London

Structural calculations in Haringey

Structural calculations for a Haringey house start at £295 including VAT. The borough sits almost entirely on London Clay, and its basement policy asks you to prove structural stability, so the ground and the frame are both part of the brief.

From £295 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Pencil resting on a dimensioned technical drawing beside a scale rule

    What Haringey asks for with structural calculations

    Haringey's full plans application lists what you must send: a completed form, a copy of the drawings, structural calculations, if appropriate and the fee. The words "if appropriate" leave the judgement to the project, and a load-bearing opening or a new floor is where it becomes appropriate.

    We take the same approach on every job. If the work touches a beam, a wall that carries load, a chimney breast or a floor, we calculate it. If it is a non-structural partition, we say so and do not charge you for work you do not need.

    Because the borough is almost all clay, we mention it in the calculation notes so the builder and building control read it together with the beam schedule. That avoids a late surprise when the trench is opened and the soil is not what the drawings assumed.

    For a straightforward extension, the calculation is short: the working and a layout. For a loft or an extension with a large opening it is longer, because floors, beams and bearings each need checking. In both cases the numbers on the sheet are the numbers on the plan.

    Steel beams supporting exposed timber floor joists on temporary props during a house renovation

    Local figures for Haringey

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Full plans application requires a completed form, a copy of the drawings, 'structural calculations, if appropriate' and the fee.structural calculations, if appropriate—haringey.gov.uk, Application for building control approval with full plans, We require
    Draft Basement Guidance Note: north London is almost entirely underlain by London Clay over a chalk aquifer; clay thickness varies from under 10 m near the Lee Valley to over 100 m on higher ground; gravels and silts overlie it in places.London Clay almost entire borough—minutes.haringey.gov.uk, Draft Basement Development Guidance Note, June 2012, Section 4 Geology
    DM18 A(a) requires proof the basement will not adversely affect structural stability of the building, neighbours and infrastructure including the highway, having regard to local geology; construction-phase traffic, noise, vibration and dust must be minimised.Structural stability test—haringey.gov.uk, Haringey Development Management DPD (2017), Policy DM18 A(a), A(h)-(i) (printed p.38, PDF p.40)
    Basement Impact Assessment, carried out by a qualified and recognised assessor, is required for all applications proposing new basement development (including extensions to existing basements), to show compliance with the current policy (DM18).All basement applications—haringey.gov.uk, Haringey Local Validation List (planning validation checklist, effective 29 August 2024), pdf p.9, row 'Basement Impact Assessment'
    DM18 only permits basements that do not harm structural stability, do not increase flood risk, and (under gardens) keep adequate soil depth and avoid loss of trees. Para 3.45: BIA stages are done by qualified independent assessors paid for by the applicant. DM18 has no numeric garden-percentage, depth or storey limit.No numeric limit in DM18—haringey.gov.uk, Haringey Development Management DPD (2017), Policy DM18 A(a)-(i), paras 3.42-3.46 (printed p.38, PDF p.40)
    Households living in a house38.9 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households37.2 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Conservation areas33 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions25 Article 4 directions published by the council—planning.data.gov.uk
    Listed building entries289 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    AD A title pageApproved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments—gov.uk
    Building Regulations 2010 reg 11FDesign work must be done by a competent person—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Haringey
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    London Clay and what it means for foundations

    Haringey's basement guidance note, which is a draft from some years ago, describes the ground in direct terms: London Clay almost entire borough. Clay shrinks in dry summers and swells when wet, and trees draw moisture from it, so new foundations in Haringey may need to go deeper than a standard trench.

    We do not design foundations from a desk. We ask the builder or your neighbours what they know about the soil, check for mature trees near the extension and flag any case where a trial pit is worth paying for before the depth is fixed.

    Haringey's basement test

    Haringey's Development Management policy on basements sets a structural stability test. The validation list requires All basement applications to carry a Basement Impact Assessment, and it asks you to prove that a basement will not harm the structural stability of your house, the neighbours or the highway. The structural limb of the policy is recorded as: Structural stability test.

    The policy has a quirk worth knowing. It sets No numeric limit in DM18, so there is no fixed depth or garden percentage to design to. The case rests on the evidence, and the assessors must be independent and qualified, with their fees paid by the applicant.

    Our calculation covers the structure of the house and the opening or beam involved. It does not replace the assessment, and we will tell you plainly where a specialist is needed.

    Houses, Article 4 and the Tottenham SPD

    Haringey's households are split between flats and houses: 38.9 per cent live in a house or bungalow, and 37.2 per cent own their home. The borough has 33 conservation areas, 25 Article 4 directions and 289 listed entries.

    In the south of the borough the council publishes the House extensions in South Tottenham SPD (revised), which shapes what can be added to a house there. Our structural layout has to agree with any extension drawn to that guidance, and we check the two against each other before they leave the office.

    That mix of houses and flats produces two kinds of request. A ground-floor flat wants to open a wall between living room and kitchen and needs the freeholder's consent. A house owner wants a rear extension with wide glazed doors, which means a beam over the opening and a foundation for the new walls. Both need the same discipline: find what is load-bearing, size the member, and show the bearing.

    In its latest year Haringey decided 689 householder applications and granted 90.3 per cent. That is general context, not a forecast for your street.

    Our Haringey fee and deliverables

    Structural calculations start at £295 including VAT, fixed after the constraints check. You receive the calculations, a beam and padstone schedule and a layout drawing, normally about a week after the survey. A technologist who did not draft the set checks it, and we revise at no charge if the examiner asks for changes.

    The same figures go into our building regulations drawings in Haringey and, where you need an application, into the planning drawings in Haringey.

    Where to read next

    For the borough, see architectural drawings in Haringey. The structural calculations page explains the service, and structural calculations in Hackney shows a neighbouring council's rules.

    What you receive

    Structural calculation sheet for a steel beam
    Sample drawing. Structural calculation for a steel beam, coordinated with the engineer.
    Brick house being extended, with a wide new opening supported over the ground floor
    Load take-down
    Brush across the bars.

    Questions

    Does Haringey require structural calculations?

    Its full plans page asks for structural calculations, if appropriate. A load-bearing change is the usual reason they are appropriate.

    Do I need a basement impact assessment in Haringey?

    For All basement applications, according to the council's validation list.

    How much do structural calculations cost in Haringey?

    From £295 including VAT, fixed up front.

    Is there a depth limit for basements in Haringey?

    The basement policy has no fixed figure: it sets No numeric limit in DM18. The case turns on the evidence.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.