020 7864 7245Request a fixed quote

Newham, London

Structural calculations in Newham

Structural calculations for a Newham home start at £295 including VAT. Newham's own guidance is clear that a full plans application must include, in the council's words, 'Structural calculations such as those for loading.'

From £295 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Steel beams supporting exposed timber floor joists on temporary props during a house renovation

    Structural calculations in Newham's full plans guidance

    Newham Building Control lists what a full plans application has to contain. Among the items, the page asks for 'Structural calculations such as those for loading.' A beam, a lintel over a widened opening or a new steel frame all fall under that heading, and an application without them waits for them.

    The same team also sells its own design service. Its page says Building Control can 'produce structural calculation reports to satisfy requirements of Part A (Building Regulations 2010)'. That is a legitimate option, and the choice is yours. Some owners prefer to have the calculations prepared with their drawings so that the beam on the plan and the beam in the calculation are the same member, and a different person checks the application.

    Whichever route you take, the examiner needs the working. We write ours to be read, with each member numbered on the layout and referred to in the calculation, which shortens the exchange of queries.

    Brick house being extended, with a wide new opening supported over the ground floor

    Local figures for Newham

    Figures with their unit, period and source
    MeasureValuePeriodSource
    A full plans application must include structural calculations.'Structural calculations such as those for loading.'—newham.gov.uk, Application types: Full plans application, With your full plans application, you need to send
    Newham Building Control offers in-house engineers to do design analysis and produce Part A structural calculation reports.'produce structural calculation reports to satisfy requirements of Part A (Building Regulations 2010)'—newham.gov.uk, Plan checking and design services, Design analysis
    Newham PAR has no Basement Impact Assessment item; Local Plan 2018 only requires basement access/egress at least 300 mm above the 1% annual probability flood level plus climate change (or the 2100 tidal breach level in the Thames breach extent).Basement access/egress 300 mm above flood level—newham.gov.uk, Newham Local Plan 2018, PDF p.171
    Households living in a house47.1 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households30.8 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Conservation areas9 named conservation areas published by the council—planning.data.gov.uk
    Heritage at Risk entries21 Heritage at Risk Register entries within the LPA boundary (Historic England)—planning.data.gov.uk
    Green Belt share of the council area2 % of council area covered by green-belt polygons—planning.data.gov.uk
    Larger home extension prior approvals granted6 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Householder decisions388 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted86.9 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time97.2 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    AD A title pageApproved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Newham
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Flats, houses and what each needs

    47.1 per cent of households live in a house, and only 30.8 per cent own their home, so much of the housing is rented and many homes are flats. Typical structural work includes opening two rooms or adding a rear room to a terraced house.

    In a terraced house a common job is a wide rear opening where the old back addition meets a new extension. The calculation has to decide whether the existing flank wall can carry the new bearing or needs a pad. In a flat, the question is what the wall supports above.

    Our survey records the make-up of each wall and floor above and below an opening, so the engineer can check loads on actual construction.

    Flood level and ground floor structure

    The council's local plan sets a flood-related rule for basement access, even though it asks for no basement impact assessment. The entry reads: Basement access/egress 300 mm above flood level.

    A rule like that shapes what structure is sensible. Ground-bearing slabs, damp-proofing and the level of any new opening to the garden are decided with flood risk in mind, and our calculation records the floor level assumed. If your home is in a flood zone, mention it on the first call.

    Newham's heritage and extension record

    Newham has 9 conservation areas and 21 entries on Historic England's Heritage at Risk Register, and a listed house needs its own consent for structural alteration.

    The council granted 6 larger home extension prior approvals in its latest return, and Green Belt covers only 2 per cent of the borough, so for most addresses the plot and the neighbours set the limits, not Green Belt policy.

    Householder decisions in Newham

    In its latest published year Newham decided 388 householder applications, granted 86.9 per cent and decided 97.2 per cent within eight weeks or an agreed extension. Our planning drawings in Newham set out the permission stage for a project that needs one.

    Choosing who prepares the calculations in Newham

    You have three options: the council's own engineers, a structural engineer you appoint yourself, or calculations prepared with your drawings by us and coordinated with an engineer. There is no wrong answer, but there are trade-offs.

    An in-house service is convenient, because one department handles design and examination. Whoever designs a member, independent checking is good practice, and it is one reason a second technologist reviews every set we issue.

    Preparing the calculation alongside the drawings has its own advantage. Every change to an opening is made once, in one model, and flows to the plan, the section and the schedule, so the beam in the calculation is the beam on the sheet. Whichever route you choose, ask for the calculations in writing before work starts.

    Fee, package and revisions

    For a Newham house we charge from £295 including VAT, a fixed sum after a look at the address and the work. The set consists of calculations, a schedule for the steel merchant and a layout sheet, checked by a second technologist.

    Changes asked for by the examiner are revised at no extra cost, and the figures run straight into the building regulations drawings in Newham.

    Close by

    Newham's neighbour Redbridge has a different fee structure for the same jobs. For the borough overview see architectural drawings in Newham, and for national guidance on beam sizes read the structural calculations guide.

    What you receive

    Structural calculation sheet for a steel beam
    Sample drawing. Structural calculation for a steel beam, coordinated with the engineer.
    House extension under construction with scaffolding, new glazed doors and building materials
    Load take-down
    Brush across the bars.

    Questions

    Does a Newham full plans application need structural calculations?

    Yes. The council's guidance asks for them, in its words: 'Structural calculations such as those for loading.'

    Can Newham Building Control prepare the calculations itself?

    Its page says it can 'produce structural calculation reports to satisfy requirements of Part A (Building Regulations 2010)'. You may also commission them separately with your drawings.

    Does flood risk change a structural design in Newham?

    It can affect floor levels and openings. The local plan's entry reads Basement access/egress 300 mm above flood level.

    How much do structural calculations cost in Newham?

    From £295 including VAT, fixed after a short check of the address and the work.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.