Structural calculations for a Croydon house start at £295 including VAT. Croydon's building control page says calculations may be needed for loft conversions, load-bearing wall removal and new openings, so we prepare them with the drawings, not after them.

From £295 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    House extension under construction with scaffolding, new glazed doors and building materials

    What Croydon says about structural calculations

    Croydon's full plans page asks for detailed drawings, and says of structural changes such as loft conversions, removing load-bearing walls and creating openings: 'Structural calculations may also be required'. The wording is permissive, not absolute, so the practical test is whether your project changes how the building carries load.

    If it does, we treat the calculation as part of the application. It shows span, load, beam size and bearing, and it ties each figure to a position on the layout. A builder can then order the steel and an examiner can read the same sheet.

    We would rather over-supply than under-supply. A gap in the paperwork is hard to repair once the structure is covered, and an examiner who has to ask for a missing figure delays a job that the owner expected to start. Giving the full set at the outset is the simplest way to avoid that.

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Local figures for Croydon

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Full plans: submit detailed drawings; structural calculations may also be required for structural changes such as loft conversions, removing load bearing walls and creating openings.'Structural calculations may also be required'—croydon.gov.uk, Full plans, Requirements
    Croydon SFRA Level 1: north of the borough is underlain by impermeable London Clay, the south by permeable chalk; river terrace deposits along river corridors; the BGS susceptibility dataset flags river corridors as potentially susceptible to groundwater flooding at surface.London Clay north / chalk south—croydon.gov.uk, Level 1 Strategic Flood Risk Assessment, Croydon, s4.3 geology and groundwater
    Heritage Statement (required for any application affecting a heritage asset, including listed and locally listed buildings and conservation areas) must always include, among other items, a structural survey where demolition is proposed.structural survey where demolition proposed—croydon.gov.uk, Croydon Local Validation List (May 2026), PDF p.34 (printed 32), 'Heritage Statement / Archaeological Assessment'
    Demolition applications (listed under prior approval) should be accompanied by details of the proposed demolition and the reason for it, with a demolition method statement and dust risk assessment covering demolition methods, hours, control of noise, air quality and land contamination, construction impacts and post-demolition restoration.demolition method statement + dust risk assessment—croydon.gov.uk, Croydon Local Validation List (May 2026), PDF p.8 (printed 6), 'Prior Approval applications'
    Construction Management or Logistics Plan scoping note: applicants submit a scoping note setting out construction management and logistics principles (phasing and programme, other projects affected, hours, vehicle movements, dust and emissions, risk assessment). A construction logistics plan scoping note may also be requested for smaller minor developments likely to cause nuisance or disturbance to residential amenity, or hazard and obstruction to the highway. Basements are not named as a trigger.CMP/CLP scoping note; smaller minors on request—croydon.gov.uk, Croydon Local Validation List (May 2026), PDF p.21 (printed 19), 'Construction Management or Logistics Plan scoping note'
    Local Plan para 8.34: where a site is at risk of groundwater flooding, the Council will request a Basement Impact Assessment as part of the Flood Risk Assessment for any application with basement or lower ground floor development, informed by ground investigations; new basements connected to the sewer must have a positive pumped device.BIA informed by ground investigation; pumped device—croydon.gov.uk, Croydon Local Plan 2018 (revised 2024, updated), para 8.34, para 8.34, printed p.174 (PDF p.189)
    Householder decisions786 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Households living in a house60.2 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Conservation areas19 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries180 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    AD A title pageApproved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments—gov.uk
    Building Regulations 2010 reg 11FDesign work must be done by a competent person—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Croydon
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Clay in the north, chalk in the south

    Croydon's flood risk assessment describes the ground in plain terms: London Clay north / chalk south, with river terrace deposits along the river corridors. That split affects foundations and any lowered floor.

    Croydon decided 786 householder applications in its latest year, and 60.2 per cent of its households live in a house or bungalow, so rear extensions and lofts are the common case. Their foundations depend on the soil, so we ask what is known about the garden before a depth is assumed.

    A basement is a separate matter. Where there is groundwater flood risk, Croydon's Local Plan asks for a basement impact assessment inside the flood risk assessment, informed by ground investigation: BIA informed by ground investigation; pumped device. We design the structure above the ground, and we say so when a basement needs a specialist.

    Heritage, demolition and construction paperwork

    Croydon has 19 conservation areas and 180 listed entries, and it publishes the Conservation Areas General Guidance SPD. Where an application touches a heritage asset, the validation list asks for a heritage statement that includes a structural survey where demolition proposed.

    Demolition has its own list. A prior approval for demolition should come with demolition method statement + dust risk assessment, covering hours, noise, air quality and restoration.

    For larger schemes a construction management or logistics scoping note is also requested, and the validation list records: CMP/CLP scoping note; smaller minors on request. Basements are not named as a trigger, so ask the council whether it will want one for your job.

    How our Croydon survey works

    We visit before we calculate. We measure the opening, record the thickness and type of the wall, note what sits above and below, and photograph anything unusual such as a chimney stack or an earlier alteration. In an older semi-detached house the wall you hope to open may carry a first-floor partition and part of the roof.

    Those facts go straight into the calculation. We write down every load we have assumed, so anyone checking it later can see where each figure came from.

    Gardens matter here too. The Greater London land-use survey put domestic gardens at 32.8 per cent of the land in the borough. When a wide opening is formed at the back of the house for an extension into the garden, we check how it affects the stability of the wall that remains.

    Where a loft is involved, the existing joists are rarely adequate for a habitable floor, so new joists or steel are sized and shown on the layout.

    Croydon fee and turnaround

    Structural calculations start at £295 including VAT, fixed after the constraints check. You receive the calculations, a beam and padstone schedule and a layout drawing, normally about a week after the survey. A second technologist checks the set, and if the examiner asks for changes we revise at no charge.

    The figures carry straight into our building regulations drawings in Croydon, and into the planning drawings in Croydon when an application is needed.

    Nearby and related

    Start from architectural drawings in Croydon for the whole borough, or read how the structural calculations service works. Next door, the paperwork differs in Bromley.

    What you receive

    Structural calculation sheet for a steel beam
    Sample drawing. Structural calculation for a steel beam, coordinated with the engineer.
    Steel beams supporting exposed timber floor joists on temporary props during a house renovation
    Load take-down
    Brush across the bars.

    Questions

    Does Croydon require structural calculations?

    Not for every job. Its guidance says 'Structural calculations may also be required' for changes such as lofts, load-bearing wall removal and new openings.

    How much do structural calculations cost in Croydon?

    From £295 including VAT, fixed up front. Croydon's own building control fee is separate.

    Does the ground in Croydon change the structure?

    It can. The flood risk assessment records London Clay north / chalk south, which affects foundations and basements.

    Do I need a structural survey for planning in Croydon?

    Only in some cases. The validation list asks for a structural survey where demolition proposed within a heritage statement.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.