Brent, London
Structural calculations in Brent
Structural calculations for a Brent home start at £295 including VAT. Brent's building control asks for detailed construction drawings and specifications with a full plans application, and for calculations only where they are necessary. For any new beam or wide opening they are, and we prepare them to go in with the drawings.
From £295 (VAT included)
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

What Brent building control asks for in structural calculations
Brent's guidance for a full plans application is to send detailed construction drawings and specifications, with calculations where necessary. For a building notice the council may ask for construction details or calculations before it decides. In both cases the phrase to read is where necessary: a new steel beam, a chimney breast removed or a new structural opening is a case where they are.
Brent's charging scheme names those jobs. Its table for common domestic alterations lists new structural openings, chimney breast removal and underpinning, each with its own charge. A calculation set is how each one is shown to be safe.
We prepare the set with the drawings, so the beam sizes on the plan match the calculation and the surveyor reads one consistent package.

Local figures for Brent
| Measure | Value | Period | Source |
|---|---|---|---|
| Full plans: send detailed construction drawings and specifications; calculations only where necessary. Building notice: the council may ask for construction details or calculations before deciding. | calculations 'if necessary' | — | brent.gov.uk, Make a building control application, Full plans / Building notice |
| Brent 2026-27 schedule, building control Table B: domestic loft conversion fee excl. VAT; single-storey extension 995.82; multi-storey or basement extension 1,274.12 (GBP). | GBP 949.25 excl. VAT (loft conversion, 26/27 proposed) | — | democracy.brent.gov.uk, Fees and Charges for 2026-2027, Appendix L ii, Neighbourhoods & Regeneration, Building Control |
| Brent states planning does not assess structural stability of basement works: that is for Building Regulations and the Party Wall Act; adjoining owners must be served notice. No structural method statement is a validation item. | no structural statement at validation | — | brent.gov.uk, Brent Basement SPD (adopted June 2017), p.15, 2.8 Construction |
| A Basement Impact Assessment is required for all householder applications that include a basement. | all basement householder applications | — | brent.gov.uk, Brent validation list: Householder Planning Permission, p.1, 'Basement impact assessment' |
| Scale limits: a basement should not be wider than the original house, extend more than 3 m from the rear of the property, or involve more than one storey of excavation (4 m floor-to-ceiling for a detached house, 3 m in other cases). Larger basements only in exceptional circumstances. | 1 storey; 3 m from rear; 4 m detached / 3 m other | — | brent.gov.uk, Brent Basement SPD (adopted June 2017), p.9, 'Scale'; p.12 (3 m into garden) |
| Garden and lightwell limits: basement extends no further than 3 m from the rear into the garden; rooflights close to the building; front lightwells project no more than 800 mm or half the front garden length (whichever is less); where lightwells are proposed, re-landscape at least 50% of the remaining front garden as soft landscaping. | 3 m; 800 mm lightwell; 50% front soft landscaping | — | brent.gov.uk, Brent Basement SPD (adopted June 2017), p.9 (External Elements); p.12 (2.5 Trees & Gardens) |
| Conservation areas | 23 named conservation areas published by the council | — | planning.data.gov.uk |
| Article 4 directions | 39 Article 4 directions published by the council | — | planning.data.gov.uk |
| Listed building entries | 93 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| AD A para 2C23: max span of a floor supported by a wall, centre to centre of bearing | 6 m | — | gov.uk |
| Building Regulations 2010 reg 11F | Design work must be done by a competent person | — | legislation.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Building control charges in Brent
Brent publishes its building control fees each year. The schedule for loft conversions, single-storey extensions and multi-storey or basement extensions is in the data table on this page, taken from the council's fees and charges document. Some figures are marked as proposed for the coming year, so we confirm the current schedule before quoting your total.
Those fees go to the council. Our fee for the calculations is separate, from £295.
Basements in Brent: what planning does and does not check
Brent has a dedicated Basement Supplementary Planning Document. Its position on structure is that planning does not assess the stability of basement works, which is left to the Building Regulations and the Party Wall Act: no structural statement at validation. A basement design is therefore checked at building control, and the calculations carry the weight.
At planning, a basement impact assessment is still required: all basement householder applications. The SPD also sets limits on scale, covering depth below ground and how far into the garden a basement may reach: 1 storey; 3 m from rear; 4 m detached / 3 m other.
Front lightwells are limited too, with these figures: 3 m; 800 mm lightwell; 50% front soft landscaping. And where the site sits in a flood zone, the council asks for this: FRA + drainage strategy FZ2/3. We set these limits out at the start of a basement job, because they fix the excavation the engineer designs for.
The ground and the neighbours
The basement SPD describes Brent's geology as predominantly London Clay over a chalk aquifer. The clay acts as a barrier to infiltration and rising groundwater, so local flooding is usually surface water rather than groundwater.
Because planning leaves structure to the Party Wall Act, neighbours must be given notice. The national rule is: Adjacent excavation notice at least 1 month before work: within 3 m and deeper than the neighbour's foundations, or within 6 m and cutting a 45° line from their foundations. Our party wall notices service prepares them.
Brent homes and constraints
Only 43.3 per cent of Brent households live in a house, and 38.4 per cent own their home. The borough has 23 conservation areas, 39 Article 4 directions and 93 listed building entries. Any of them can limit structural change to the outside of a building.
Brent also records 1,229 tree preservation orders. Trees close to a new foundation or a basement affect its depth and form, and we ask about them at the first call.
Simple rules, calculation and price
Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments gives simple rules for common cases, and a floor supported by a wall can use them up to 6 metres between bearings. Anything beyond that, and a new beam, usually needs calculation, and the design must be done by a competent person: Design work must be done by a competent person.
The fee is £295 with VAT included, fixed after the constraints check. You receive the calculations, a beam and padstone schedule and a layout drawing, checked by a second chartered technologist. Our building regulations drawings in Brent and construction drawings in Brent use them directly.
For the borough overview, see architectural drawings in Brent. The same service is available in neighbouring Ealing, Harrow and Camden, with the national picture in the structural calculations guide.
What you receive


Related pages
Other services in Brent
Questions
Does Brent building control require structural calculations?
For full plans it asks for calculations where necessary, and for a building notice it may request them before deciding. A new beam or structural opening is a case where they are needed.
Does Brent planning check basement structure?
No. The basement SPD says stability is a matter for the Building Regulations and the Party Wall Act: no structural statement at validation.
What limits does Brent set on basements?
The SPD limits scale as follows: 1 storey; 3 m from rear; 4 m detached / 3 m other. Front lightwells and garden planting have their own limits.
How much do structural calculations cost in Brent?
From £295 including VAT, fixed up front. The council's building control fee is separate.
Sources and dates
- brent.gov.uk, retrieved
- democracy.brent.gov.uk, retrieved
- brent.gov.uk, retrieved
- brent.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- brent.gov.uk, retrieved
- legislation.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- planning.data.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.