020 7864 7245Request a fixed quote

Wandsworth, London

Construction drawings in Wandsworth

Construction drawings in Wandsworth turn a planning scheme into the detailed set a contractor can price and build, for extensions, roof alterations and basements alike. Fixed quote after a free constraints check, VAT included.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on construction drawings

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Steel beams supporting exposed timber floor joists on temporary props during a house renovation

    Construction drawings in Wandsworth and the council's guidance

    Wandsworth keeps its householder guidance in one place: the Housing SPD (covers rear extensions, basements, roof extensions and loft conversions). Behind it sits the Wandsworth Local Plan 2023-2038. Because a single document covers rear extensions, basements and roofs, a builder reading your drawings can see how the council expects each of them to be put together, and our sheets are written so those expectations are visible rather than assumed.

    Basements get separate treatment. The council publishes Basement extensions guidance (non-statutory), and as it is non-statutory it works as a guide rather than a test. For a lower-ground project, the construction set is where the guide turns into sequence: underpinning stages, waterproofing layers and the temporary works the engineer will call for.

    The practical point is cost control. A basement priced from a planning drawing alone can swing wildly between contractors. Priced from a detailed set, the same job gives comparable figures, and the arguments happen before the dig rather than after it.

    Brick house being extended, with a wide new opening supported over the ground floor

    Local figures for Wandsworth

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas46 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries312 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Households living in a house31.4 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Householder applications granted91.9 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Larger home extension prior approvals refused12 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Borough CIL residential rate£1,031.39/m² (Nine Elms Residential Area A); £475.34/m² (Nine Elms Residential Area B); £0 (Roehampton Charging Area); £448.43/m² (all other areas)rate for 2026 (schedule rates £575 / £265 / £0 / £250)wandsworth.gov.uk
    Approved Document K 2013, para 1.3, Table 1.1Private stair: rise 150-220 mm, going 220-300 mm, max pitch 42°, 2R+G 550-700 mm—gov.uk
    Approved Document B Vol 1, 2019 ed. incl. 2026 amendments, para 2.10Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor—gov.uk
    Approved Document L Vol 1 2021 incl. 2023 amendments, Table 4.2New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Wandsworth
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Homes in Wandsworth and what they need drawn

    Only 31.4 per cent of households here live in a house or bungalow, so a good share of Wandsworth projects are flats, maisonettes or conversions. Those jobs need drawings that deal with shared walls, floors between homes and access through common parts, none of which appear in a standard rear-extension pack.

    Where a floor is shared, fire separation and sound performance dominate the technical details. We show the ceiling build-up, the fixing of any new beams and the penetrations for services, because the neighbour below is affected by every one of them.

    In a house, the stair is usually the hardest element. The national figures are plain: Private stair: rise 150-220 mm, going 220-300 mm, max pitch 42°, 2R+G 550-700 mm, and 2.0 m clear headroom over stairs. We test the stair against the structure before the loft or extension layout is final.

    Conservation areas, listing and tree constraints

    The borough has 46 conservation areas, so many Wandsworth addresses carry extra scrutiny on materials, windows and roof edges. A construction set for such a house names the brick, the mortar mix, the window profile and the roof covering, giving the contractor a specification to match rather than a choice to make.

    There are also 312 listed building entries. Alterations to a listed property need listed building consent, and our drawings for those homes set out repair methods and the treatment of original fabric in terms a conservation officer can read.

    The planning record is a useful backdrop. Wandsworth decided 977 householder cases in its latest year and granted 91.9 per cent, with 92.4 per cent in time. Those figures are context, not a forecast for your house, and our planning drawings in Wandsworth cover the application side.

    Levies, prior approval and the cost picture

    Building cost is not the only charge on a new floor area. The borough's levy schedule is the Wandsworth CIL Charging Schedule, with residential rates of £1,031.39/m² (Nine Elms Residential Area A); £475.34/m² (Nine Elms Residential Area B); £0 (Roehampton Charging Area); £448.43/m² (all other areas). We note the new floor area on the drawings so the liability can be worked out early, before it surprises you at completion.

    Householders extending by the larger-home route are covered by prior approval, where the council granted 13 and refused 12 in its latest national return. Nearly half were refused, so an accurate submission matters, and a lawful development certificate in Wandsworth is sometimes the safer way to settle a permitted-development question.

    Energy specification is the final cost lever. New elements in existing homes must meet the limits set out as: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. We choose build-ups that meet those figures with the least thickness lost from your rooms.

    Getting a set ready for building control

    A set that serves the builder should also serve the inspector. Our drawings carry the escape window sizes, the smoke alarm grade and category, and the ventilation rates, so one document answers both. The escape window rule is Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor, and we show it dimensioned on every relevant elevation.

    The structural engineer's calculations then slot into the same sheets; see structural calculations in Wandsworth for how that works, and building regulations drawings in Wandsworth for the submission itself. For an overview of everything we prepare in the borough, start at architectural drawings in Wandsworth.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    House extension under construction with scaffolding, new glazed doors and building materials
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Do basement projects in Wandsworth need construction drawings?

    Yes. The council's Basement extensions guidance (non-statutory) is a guide, and a contractor still needs a detailed set to price underpinning, waterproofing and temporary works.

    Which Wandsworth document covers rear extensions and lofts?

    The Housing SPD (covers rear extensions, basements, roof extensions and loft conversions). We read it alongside every Wandsworth job.

    How many conservation areas does Wandsworth have?

    The council publishes 46. We check whether your address sits in one before the construction details are fixed.

    What does a Wandsworth construction set cost?

    Fixed quote after a free constraints check, VAT included, set by the size and type of the work.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.