Richmond upon Thames, London
Construction drawings in Richmond upon Thames
Construction drawings in Richmond upon Thames are written for a borough where heritage is the norm and not the exception. They give your builder exact dimensions, junctions and materials, and show the conservation officer that what is built is what was approved. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on construction drawings
Five steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Building regulations
Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.
Approval and hand-over
Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Construction drawings in Richmond upon Thames: heritage is the baseline
Richmond upon Thames has 85 conservation areas, and Historic England lists 819 entries: 40 at Grade I, 88 at Grade II* and 686 at Grade II. The borough also records 16 registered parks and gardens and 1 World Heritage Site.
In that setting a construction set is a conversation with the conservation officer as much as with the builder. A generic note such as matching brickwork is not enough. The sheets give the brick, the bond, the mortar, the roof slate, the window section and the paint finish, because those are the choices that conditions are written about.
The council's House Extensions and External Alterations SPD and Design Quality SPD set the design expectation. The technical set turns those expectations into specifications that a contractor can price and an officer can check.

Local figures for Richmond upon Thames
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 85 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 819 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Grade I listed entries | 40 list entries | — | planning.data.gov.uk |
| Registered parks and gardens | 16 registered parks and gardens intersecting the LPA boundary (Historic England) | — | planning.data.gov.uk |
| Larger home extension prior approvals granted | 78 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Larger home extension prior approvals refused | 30 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Average price, terraced | 915,886 GBP | 2026-07 | publicdata.landregistry.gov.uk |
| Approved Document L Vol 1 2021 incl. 2023 amendments, Table 4.2 | New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4 | — | gov.uk |
| Approved Document K 2013, para 1.3, Table 1.1 | Private stair: rise 150-220 mm, going 220-300 mm, max pitch 42°, 2R+G 550-700 mm | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Energy standards without harming a period house
New elements must meet limiting U-values: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. In a period house the hard cases are timber sash windows and solid walls. We draw thin double glazing options and internal insulation build-ups, with the junction drawn so moisture has somewhere to go.
Where the building is listed, the regulations still apply, but the guidance allows reasoned compromise. The set records the reasoning so building control and the conservation officer see the same justification.
If your scheme needs consent first, planning drawings in Richmond upon Thames deal with the application and the technical sheets follow the permission.
Large extensions in Richmond and what the figures show
The council's statistics record 78 prior approval notifications for large single-storey rear extensions granted and 30 refused. Even so, houses in conservation areas may lose permitted rights, so check before assuming this route.
A rear extension to a period terrace meets an old wall of uncertain depth. We survey the wall, record its thickness and condition, and draw the junction with a lintel, a cavity tray and a weathering detail that fits the existing brickwork.
Stairs, loft access and escape in a Richmond terrace
Period stairs were built to older proportions. Today's private stair rule is Private stair: rise 150-220 mm, going 220-300 mm, max pitch 42°, 2R+G 550-700 mm, and a loft stair has to meet 2.0 m clear headroom over stairs. We draw the old stair and the proposed one against the new roof pitch to find the layout that works.
An upper-floor bedroom needs a way out, and the rule is Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor. On a street where windows are controlled by the council, the escape opening has to be a conservation-grade window, and the drawing names the product.
Planning pace, price context and neighbours
Richmond decided 1,302 householder applications in its latest published year, granting 83.3 per cent and deciding 98.3 per cent in time. Terraced houses average £915,886, so detail that protects a period building is money well placed.
Where a garden has mature trees or runs down towards the river, root zones, drainage falls and ground conditions can change where foundations may go. Period houses also hide surprises: a chimney breast cut away in the past, a floor on unexpected joists, a wall that is thinner than it looks. We record what is visible and the drawings ask the engineer for the rest. The fee is fixed after a free constraints check, and a second chartered technologist checks every sheet. For the set sent for approval, see building regulations drawings in Richmond upon Thames; for the beams, structural calculations in Richmond upon Thames. The borough overview is architectural drawings in Richmond upon Thames, and we also draw in Kingston upon Thames and Hounslow.
What you receive


Related pages
Other services in Richmond upon Thames
Questions
Do construction drawings for a listed house in Richmond differ?
They carry more material detail and a written justification for any departure from the energy standard, because the conservation officer reads them as well as building control.
Can I use modern windows in a Richmond conservation area?
Sometimes not. Where windows are controlled, the council can expect the existing pattern and material, and the sheets name the window product to match.
Do I need a survey before construction drawings in Richmond?
Yes. Period walls and floors vary, and we measure them so junctions are drawn against what exists.
How much do Richmond construction drawings cost?
It is a fixed quote after a free constraints check, because the fee depends on the size and complexity of the building.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- planning.data.gov.uk, retrieved
- richmond.gov.uk, retrieved
- gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.