Construction drawings in Kensington and Chelsea

Construction drawings in Kensington and Chelsea are the technical set for homes where the average price is £1,232,640, 1,350 entries are listed and 4,560 tree preservation orders are in force. Margins for error are small, so the drawings must leave nothing to site judgement. We are chartered architectural technologists. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on construction drawings

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Pencil resting on a dimensioned technical drawing beside a scale rule

    Article 4, listing and trees in Kensington and Chelsea

    The council publishes 39 conservation areas and 84 Article 4 directions, and Historic England lists 1,350 entries. A further 43 entries are on the Heritage at Risk register, and there are 4,560 tree preservation orders across 41 protection zones.

    Taken together these figures mean that almost every Royal Borough address has some restriction on it. For the technical set, the practical result is care about sequence and about materials. We confirm the planning and consent route first, and then draw the construction set so that every external material, joinery profile and roof detail matches what was approved.

    With trees so densely protected, a garden-side extension can sit within a root protection area. The foundation depth, any bridging beam and the construction method over roots are drawn on the structural sheets, with a note of the tree reference, so the contractor knows where hand-digging is required.

    Roofs and rooflights in this borough are read from the street and from neighbouring upper windows, so a technical set pays attention to what can be seen. We position every vent, flue, soil pipe and extract terminal on the elevation drawings and keep them to the side or rear wherever the Building Regulations allow, because a terminal on the front elevation can undo careful planning work.

    Steel beams supporting exposed timber floor joists on temporary props during a house renovation

    Local figures for Kensington and Chelsea

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Listed building entries1,350 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Conservation areas39 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions84 Article 4 directions published by the council—planning.data.gov.uk
    Tree preservation orders4,560 tree preservation orders published by the council—planning.data.gov.uk
    Tree preservation zones41 tree preservation zone polygons published by the council—planning.data.gov.uk
    Heritage at Risk entries43 Heritage at Risk Register entries within the LPA boundary (Historic England)—planning.data.gov.uk
    Households living in a house17 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Householder decisions664 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted93.7 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Lawful development certificate applications (PS1)25 certificates2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Approved Document L Vol 1 2021 incl. 2023 amendments, Table 4.2New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4—gov.uk
    Approved Document K 2013, para 1.3, Table 1.1Private stair: rise 150-220 mm, going 220-300 mm, max pitch 42°, 2R+G 550-700 mm—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Kensington and Chelsea
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    The Basements SPD and below-ground alterations

    The council's local plan is the Local Plan 2024 (New Local Plan Review), adopted in 2,024, and its working document for subterranean work is the Basements SPD. The borough is well known for its approach to basements, and that reputation is built on rules about size, depth, construction impact and drainage.

    Large basement excavation is a specialist field and not part of what this site offers. Smaller below-ground work in an existing house, such as lowering a floor in a lower-ground room, forming a lightwell door or adding a rear opening in a retaining wall, still needs a clear technical set. We show the structural support, the waterproofing approach and the drainage levels, so that building control and the party-wall surveyor can assess them without guessing.

    Where a project begins to look like a basement in the council's sense, we say so early and explain what further consultants are needed.

    Contractors in this part of London are used to working around protected trees, narrow streets and sensitive neighbours, but the drawings should still help. We include a short construction-sequence note on any job that involves temporary props, deliveries through a mews or work near a boundary wall, so the builder sets out the job in a safe order.

    Flats, values and the question of who owns what

    Just 17 per cent of households live in a house or bungalow, and owner-occupation is 31.7 per cent. Many alterations therefore involve a lease, a managing agent and a neighbour above or below.

    With values that high, tolerances are tight and so is the specification. We name finishes, glazing, ironmongery and insulation products, where the design depends on them, and give the performance each must reach. The stair, escape window, smoke alarm and ventilation figures in the table apply whatever the building is worth.

    The borough charges its own levy under the Borough CIL Charging Schedule, plus Mayoral CIL at £80 per square metre. Our floor areas follow the levy's convention.

    We would rather say early that a project is more than the standard set can cover. Complex subterranean work, a structural frame replacement or a listed building with unusual fabric may need extra consultants, and we explain who and why at the quote stage so that the budget is realistic from the start.

    Decisions and timing in the Royal Borough

    The council decided 664 householder applications in its latest year and granted 93.7 per cent, with 91.9 per cent decided within eight weeks or an agreed extension. Those are borough-wide figures, and a listed building or a protected garden is a different test.

    The council also issued only 25 lawful development certificates in the data period. With so many Article 4 directions and so many flats, which have no householder permitted development rights, planning permission is usually the route.

    Because the planning stage is the slow one, we start technical coordination alongside it and issue construction drawings close to the decision. A builder with a complete set can price, order long-lead joinery and mobilise promptly.

    A narrow permitted route makes the quality of the first submission matter even more. A technical set that follows the approved drawings closely avoids the amendment applications that otherwise add months.

    Where to go next in Kensington and Chelsea

    The borough overview is at architectural drawings in Kensington and Chelsea, and the approval stage is at building regulations drawings in Kensington and Chelsea. For beams and foundations see our structural calculations.

    Neighbouring boroughs include Westminster, Hammersmith and Fulham and Brent. The service is described generally at construction drawings in London.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Brick house being extended, with a wide new opening supported over the ground floor
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    How many tree preservation orders are there in Kensington and Chelsea?

    The council publishes 4,560 orders and 41 protection zones, so we check trees before designing foundations.

    Does the Basements SPD affect an ordinary extension?

    Only if the work goes below ground. The Basements SPD governs subterranean development, and we tell you early if your project crosses that line.

    Do Article 4 directions affect construction drawings?

    They affect the planning route. With 84 directions in the borough, we confirm the route first and then draw the technical set to match the approval.

    What do Kensington and Chelsea construction drawings cost?

    Fixed quote after a free constraints check, according to the size and complexity of the work.

    Sources and dates