Merton, London
Construction drawings in Merton
Construction drawings in Merton give a builder one set to price from: structure, insulation, stairs, fire and drainage drawn against your permitted scheme. Merton's semis and terraces, and its basement policy, shape what goes on the sheets. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on construction drawings
Five steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Building regulations
Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.
Approval and hand-over
Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Construction drawings in Merton: semis, terraces and the basement question
60.4 per cent of Merton's 81,729 households live in a house, and 55.6 per cent own their home. Semi-detached houses average £954,064, and a well-drawn extension or loft sits comfortably against that figure.
Merton publishes a Basement and subterranean SPD, a Borough Character Study SPD and a Small sites toolkit SPD. The first matters most to anyone digging down, because it governs how a basement is justified. The construction set does not repeat that argument. It takes the permitted box and draws what a contractor must build: the underpinning or retaining sequence, the waterproofing system, the drainage and the escape route.
Basements punish vague drawings. The wall that holds back the ground cannot be improvised, and neither can the pump that keeps it dry. We draw each element on its own sheet and cross-reference them, so a builder pricing the work sees all of it before the first spade.

Local figures for Merton
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 28 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 243 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Heritage at Risk entries | 23 Heritage at Risk Register entries within the LPA boundary (Historic England) | — | planning.data.gov.uk |
| Households living in a house | 60.4 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Average price, semi-detached | 954,064 GBP | 2026-07 | publicdata.landregistry.gov.uk |
| Larger home extension prior approvals granted | 22 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Larger home extension prior approvals refused | 80 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Householder applications decided in time | 85.2 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Approved Document K 2013, para 1.3, Table 1.1 | Private stair: rise 150-220 mm, going 220-300 mm, max pitch 42°, 2R+G 550-700 mm | — | gov.uk |
| Approved Document B Vol 1, 2019 ed. incl. 2026 amendments, para 2.10 | Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Heritage in Merton and what it does to a specification
Merton has 28 conservation areas and 243 Historic England list entries, and its heritage data records 23 entries on the Heritage at Risk Register. Some streets are therefore sensitive to the choice of window and brick, even where no listed building stands.
The set records the choices that heritage officers look at: window material and glazing bars, roof covering, brick and mortar colour. It also shows how each new element still meets the energy standard: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4.
If a design still needs planning consent, planning drawings in Merton establish the scheme first. We then draw the technical set to the letter of the decision.
Large rear extensions and what a notification may leave open
For a large single-storey rear extension, Merton's published statistics show 22 prior approval notifications granted and 80 refused. The ratio is a reminder that neighbours' comments and the council's reading of impact decide the outcome, and not every notification passes.
Notification or not, the technical set is the same job. A kitchen extension still needs foundations suited to the ground, a structural opening, and a roof build-up that reaches the limit in the national table. Where the opening is wide, we show the beam, its bearings and the temporary support, and structural calculations in Merton feed those details.
Stairs, loft access and escape in a Merton house
Merton's loft work meets the same stair rules as anywhere else. The geometry building control checks is Private stair: rise 150-220 mm, going 220-300 mm, max pitch 42°, 2R+G 550-700 mm, and headroom is 2.0 m clear headroom over stairs. In a semi with a narrow hall, the stair often decides whether the loft is a bedroom and a bathroom or only a bedroom.
A loft bedroom also needs an escape window: Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor. We draw the window position against the roof slope and the rafters to check it can be reached before the dormer or roof-light order is placed.
Timing, checks and what to read next
The council decided 759 householder applications in its latest published year and granted 92.9 per cent, although only 85.2 per cent were decided in time. A start date should therefore carry some slack, and the set should be ready before the decision arrives. Ordering steel, windows and roof lights early is where a finished set pays for itself, because lead times for each differ and the order can be placed from one schedule.
The fee is fixed after a free constraints check, and every sheet is checked by a second chartered technologist. For the set sent for approval, see building regulations drawings in Merton, and for the whole borough architectural drawings in Merton. Nearby, the same service is available in Sutton and Kingston upon Thames.
What you receive


Related pages
Other services in Merton
Questions
Does Merton's basement SPD affect my construction drawings?
It governs the planning case. The construction set then adds the retaining structure, waterproofing, pumped drainage and escape route that a builder needs.
Can I start construction drawings before Merton decides my application?
Yes, once the layout is stable. Adjustments for any conditions follow the decision.
Are construction drawings the same as structural calculations?
No. Calculations size the beams and foundations; the drawings show the whole building, including those elements, and everything around them.
How much do construction drawings in Merton cost?
It is a fixed quote after a free constraints check, and the fee depends on the size and complexity of the building.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- merton.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.