Bexley, London
Construction drawings in Bexley
A Bexley construction set is the dimensioned, specified drawing pack a builder needs to price and build your extension or loft without guessing. It follows the council's Design Guide SPD Part 2: Building Alterations and Extensions and the planning decision behind it. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on construction drawings
Five steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Building regulations
Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.
Approval and hand-over
Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Construction drawings in Bexley and the borough Design Guide
No Bexley policy tells us how to draw construction details, and none should; the Building Regulations are the same in every borough. The council's own guidance is the Design Guide SPD Part 2: Building Alterations and Extensions, which pairs with the Design Guide SPD Part 1: Design Principles and the Bexley Local Plan adopted in 2,023.
We treat the alterations and extensions part of that guide as the brief for the outside of the building. Whatever it says about how an addition sits against its neighbours is converted into measurements on our elevations: the set-back, the ridge, the sill and head heights. The contractor then builds to a number rather than to a description.
If your permission came with conditions, they go into the specification word for word. If you are still choosing a route, our planning drawings in Bexley come first and the construction set follows once the design is settled.

Local figures for Bexley
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 23 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 114 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Grade I listed entries | 6 list entries | — | planning.data.gov.uk |
| Scheduled monuments | 4 scheduled monuments intersecting the LPA boundary (Historic England) | — | planning.data.gov.uk |
| Green Belt share of the council area | 17 % of council area covered by green-belt polygons | — | planning.data.gov.uk |
| Households living in a house | 75.3 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Householder applications granted | 94.6 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 99.4 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Larger home extension prior approvals refused | 8 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Approved Document F Vol 1 2021, Table 1.1 | Intermittent extract: kitchen 30 l/s with cooker hood (60 l/s otherwise), utility 30 l/s, bathroom 15 l/s, WC 6 l/s | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
A borough of houses with a quiet heritage layer
Bexley is a house borough. 75.3 per cent of households live in a house and 68.6 per cent own their home, so the typical job is a family adding space rather than a developer adding units. That affects how we draw: more rear extensions and loft conversions, fewer shared-structure problems.
Heritage is present, if less dense. There are 23 conservation areas and 114 Historic England list entries, among them 6 at Grade I. The borough also holds 4 scheduled monuments and 4 registered parks and gardens. Near any of these, we ask the council early whether an extension affects a setting.
Green Belt covers 17 per cent of the area. Check your plot against the map before commissioning anything.
Extract fans, ventilation and the details nobody remembers
Extensions often fail at the ventilation stage, not the structural one. Approved Document F sets the extract rates: Intermittent extract: kitchen 30 l/s with cooker hood (60 l/s otherwise), utility 30 l/s, bathroom 15 l/s, WC 6 l/s. We show each fan, its duct route and its outlet on the plans, so the builder is not cutting a hole through a finished wall later.
Insulation is the other quiet item. New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Our specification names the product and thickness that meets each value, because a figure alone does not tell a joiner what to buy.
The standard of workmanship is covered by Approved Document 7: Materials and workmanship, 2013 edition incorporating 2018 amendments, which we reference in the specification so the standard is explicit.
Bexley's planning record in numbers
Bexley decided 877 householder applications in its latest published year, granting 94.6 per cent, with 99.4 per cent decided in time. That is a permissive, quick record for householders.
Prior approval for larger home extensions is much less common: 7 granted and 8 refused. The council also handled 323 lawful development certificate applications. Past results say nothing about your own, but they help us advise on timing.
Levels, drainage and the back garden
Gardens take up 25.1 per cent of all land in the borough, and in a house borough that is where most extensions go. The garden is also where the quiet problems live: a drain run that crosses the new footprint, a manhole under the proposed slab, a tree whose roots decide the foundation depth.
We therefore ask for a drain survey early and show the existing runs on the ground floor plan. If a pipe must be diverted or built over, the drawing says how and to what standard, so the builder is not renegotiating on the day the excavator arrives.
Floor levels get the same attention. A rear extension that steps down into the garden needs a threshold, a drained patio and a damp-proof course that line up. Our sections fix each of those heights against a datum taken from the survey.
What the set costs and where to go next
Construction drawings are quoted as a fixed fee once we have checked your constraints, which is free. The set can double as building regulations information; see building regulations drawings in Bexley, and structural calculations in Bexley for the engineer's side.
Wider options for the borough sit under architectural drawings in Bexley. The same service is open to owners next door in Bromley and in Croydon.
What you receive


Related pages
Other services in Bexley
Questions
Do I need construction drawings if I already have planning permission in Bexley?
Yes, in practice. Planning permission shows what the building looks like. A builder still needs the build-up, levels, openings and services drawn before a fixed price is possible.
What does Bexley's Community Infrastructure Levy mean for my drawings?
The charge depends on new floor area, which our drawings measure. Bexley's residential rate is £40/m² (Zone 1); £60/m² (Zone 2), plus indexation.
Can the same set go to Bexley building control?
Yes. We write the set so it carries the Building Regulations information that a full plans application needs.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- gov.uk, retrieved
- bexley.gov.uk, retrieved
- bexley.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- planning.data.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- data.london.gov.uk, retrieved
- bexley.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.