020 7864 7245Request a fixed quote

Bexley, London

Construction drawings in Bexley

A Bexley construction set is the dimensioned, specified drawing pack a builder needs to price and build your extension or loft without guessing. It follows the council's Design Guide SPD Part 2: Building Alterations and Extensions and the planning decision behind it. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on construction drawings

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    House extension under construction with scaffolding, new glazed doors and building materials

    Construction drawings in Bexley and the borough Design Guide

    No Bexley policy tells us how to draw construction details, and none should; the Building Regulations are the same in every borough. The council's own guidance is the Design Guide SPD Part 2: Building Alterations and Extensions, which pairs with the Design Guide SPD Part 1: Design Principles and the Bexley Local Plan adopted in 2,023.

    We treat the alterations and extensions part of that guide as the brief for the outside of the building. Whatever it says about how an addition sits against its neighbours is converted into measurements on our elevations: the set-back, the ridge, the sill and head heights. The contractor then builds to a number rather than to a description.

    If your permission came with conditions, they go into the specification word for word. If you are still choosing a route, our planning drawings in Bexley come first and the construction set follows once the design is settled.

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Local figures for Bexley

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas23 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries114 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Grade I listed entries6 list entries—planning.data.gov.uk
    Scheduled monuments4 scheduled monuments intersecting the LPA boundary (Historic England)—planning.data.gov.uk
    Green Belt share of the council area17 % of council area covered by green-belt polygons—planning.data.gov.uk
    Households living in a house75.3 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Householder applications granted94.6 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time99.4 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Larger home extension prior approvals refused8 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Approved Document F Vol 1 2021, Table 1.1Intermittent extract: kitchen 30 l/s with cooker hood (60 l/s otherwise), utility 30 l/s, bathroom 15 l/s, WC 6 l/s—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Bexley
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    A borough of houses with a quiet heritage layer

    Bexley is a house borough. 75.3 per cent of households live in a house and 68.6 per cent own their home, so the typical job is a family adding space rather than a developer adding units. That affects how we draw: more rear extensions and loft conversions, fewer shared-structure problems.

    Heritage is present, if less dense. There are 23 conservation areas and 114 Historic England list entries, among them 6 at Grade I. The borough also holds 4 scheduled monuments and 4 registered parks and gardens. Near any of these, we ask the council early whether an extension affects a setting.

    Green Belt covers 17 per cent of the area. Check your plot against the map before commissioning anything.

    Extract fans, ventilation and the details nobody remembers

    Extensions often fail at the ventilation stage, not the structural one. Approved Document F sets the extract rates: Intermittent extract: kitchen 30 l/s with cooker hood (60 l/s otherwise), utility 30 l/s, bathroom 15 l/s, WC 6 l/s. We show each fan, its duct route and its outlet on the plans, so the builder is not cutting a hole through a finished wall later.

    Insulation is the other quiet item. New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Our specification names the product and thickness that meets each value, because a figure alone does not tell a joiner what to buy.

    The standard of workmanship is covered by Approved Document 7: Materials and workmanship, 2013 edition incorporating 2018 amendments, which we reference in the specification so the standard is explicit.

    Bexley's planning record in numbers

    Bexley decided 877 householder applications in its latest published year, granting 94.6 per cent, with 99.4 per cent decided in time. That is a permissive, quick record for householders.

    Prior approval for larger home extensions is much less common: 7 granted and 8 refused. The council also handled 323 lawful development certificate applications. Past results say nothing about your own, but they help us advise on timing.

    Levels, drainage and the back garden

    Gardens take up 25.1 per cent of all land in the borough, and in a house borough that is where most extensions go. The garden is also where the quiet problems live: a drain run that crosses the new footprint, a manhole under the proposed slab, a tree whose roots decide the foundation depth.

    We therefore ask for a drain survey early and show the existing runs on the ground floor plan. If a pipe must be diverted or built over, the drawing says how and to what standard, so the builder is not renegotiating on the day the excavator arrives.

    Floor levels get the same attention. A rear extension that steps down into the garden needs a threshold, a drained patio and a damp-proof course that line up. Our sections fix each of those heights against a datum taken from the survey.

    What the set costs and where to go next

    Construction drawings are quoted as a fixed fee once we have checked your constraints, which is free. The set can double as building regulations information; see building regulations drawings in Bexley, and structural calculations in Bexley for the engineer's side.

    Wider options for the borough sit under architectural drawings in Bexley. The same service is open to owners next door in Bromley and in Croydon.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Steel beams supporting exposed timber floor joists on temporary props during a house renovation
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Do I need construction drawings if I already have planning permission in Bexley?

    Yes, in practice. Planning permission shows what the building looks like. A builder still needs the build-up, levels, openings and services drawn before a fixed price is possible.

    What does Bexley's Community Infrastructure Levy mean for my drawings?

    The charge depends on new floor area, which our drawings measure. Bexley's residential rate is £40/m² (Zone 1); £60/m² (Zone 2), plus indexation.

    Can the same set go to Bexley building control?

    Yes. We write the set so it carries the Building Regulations information that a full plans application needs.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.