020 7864 7245Request a fixed quote

Hammersmith & Fulham, London

New build drawings in Hammersmith and Fulham

Hammersmith and Fulham grants nearly all the small schemes it decides, yet a smaller share of them are decided within the statutory period. We prepare new build drawings for Hammersmith and Fulham plots from £1,450 including VAT, with a second chartered technologist checking each sheet.

From £1,450 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on new build drawings

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Georgian brick terrace with sash windows, arched fanlight doorways, stone steps and iron railings in London

    A high grant rate and a slow clock

    In the latest return Hammersmith and Fulham decided 565 minor applications and granted 95.9 per cent of them. Only 78.6 per cent were decided within the statutory 8 weeks or an agreed extension.

    Read together, those two numbers tell a client how to plan. A well-drawn scheme here has a good statistical record of being granted, but the programme should allow for a longer wait than the statute suggests, and the budget should carry the holding costs of that wait. They are past figures for all minor cases, including extensions, and neither a promise nor a forecast for your site.

    Householder work shows the same pattern: 97.8 per cent granted and 79.8 per cent on time. A clear, complete set shortens the back-and-forth with the case officer, which is where most delay is lost, so we spend our time on completeness. Our planning drawings in Hammersmith and Fulham page sets out the submission side.

    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline

    Local figures for Hammersmith & Fulham

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Minor application decisions565 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications granted95.9 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications decided in time78.6 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted97.8 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Mayoral CIL charging band1 MCIL2 charging band (1-3)—london.gov.uk
    Mayoral CIL rate (indexed)96.97 £/m² (indexed, permissions granted in 2026)—london.gov.uk
    Conservation areas47 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries268 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Domestic gardens share of land (GLUD 2005)17.1 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk
    Green Belt share of the council area0 % of council area covered by green-belt polygons—planning.data.gov.uk
    Erection of dwellinghouses, not more than 10: per dwellinghouse, from 1 Apr 2026610 GBP per dwelling—ribblevalley.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Hammersmith & Fulham
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Which sites actually come up

    Just 24.6 per cent of households live in a house here, and 32.1 per cent own their home. A new build in this borough is more likely to be a mews house, a rear-garden infill, or the replacement of a worn-out building than a new plot on an open street.

    Gardens make up only 17.1 per cent of the land, so garden-land proposals are scarce and each is closely read. Where one does arise, the drawing needs to show the retained garden depth and the neighbours' windows clearly.

    The borough sits in Mayoral CIL band 1, at a current indexed rate of £96.97 per square metre. The council fee is £610 per dwelling for up to nine homes.

    Conservation areas and listed neighbours

    The council publishes 47 conservation areas, and holds 268 listed building entries. 15 entries appear on the Heritage at Risk register.

    In practice a new building almost always touches a conservation area or faces a listed one. We draw the street elevation with the neighbouring cornice, eaves and window heads shown to scale, using levels from a measured building survey, so the officer can judge the new roofline without a site visit.

    Standards that shape the plans

    Every new dwelling must meet the national space standard: Minimum GIA: 1b1p 39 m² (37 m² with shower), 1b2p 50 m², 2b3p 61 m², 2b4p 70 m² (one-storey dwellings); 3b4p 74 m², 3b5p 86 m². In London, At least 10% M4(3) wheelchair user dwellings; all others M4(2). Water use is capped at 125 litres/person/day, or 110 where the optional requirement applies.

    We mark these on the plans so the officer does not have to work them out, and carry them into building regulations drawings in Hammersmith and Fulham later.

    Planning the programme around a slower decision

    A borough that grants most of what it decides but takes longer to decide it asks something specific of the person paying for the scheme: plan the money as well as the drawings. Interest on the land, rented accommodation for the client and the builder's availability all run through the wait, and a late decision can move a start date into winter.

    We therefore give each client a programme at the start of the job, with the survey week, the design freeze, the submission date and a realistic period for the council, based on the figures above and not on the statutory minimum. We also say plainly that the period is the council's, not ours.

    The best protection we can offer is a set the officer can validate on the first day. That means a complete application form, correct ownership notices, a site location plan at the right scale, a block plan, floor plans, elevations and sections, a design and access statement where required, and the area schedule. A missing item can delay validation before the clock even starts.

    Biodiversity net gain is worth a note too: From 6 Aug 2026 BNG does not apply to sites of 0.2 ha or less; the self-build exemption ended for applications from 6 Aug 2026. We tell you at the first call whether it is likely to apply, since a late request for ecology work can add weeks.

    Once the consent is secure, our construction drawings in Hammersmith and Fulham turn the approved design into the set a builder can price and build from.

    We do not promise a date and we do not promise an outcome. We promise a complete set, an honest programme and a second technologist's check on every sheet.

    How we start

    Give us the address and a few lines on the idea. We check constraints and levies, quote a fixed fee and, after survey, test options in our 3D model. You choose one in writing.

    If the council asks for amendments, we redraw free of charge until approval. We cannot predict the decision.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Red-brick mansion blocks and shopfronts on a street corner
    Points, not guesses
    Paint across the grid with the pointer.

    Questions

    Does Hammersmith and Fulham grant most small schemes?

    It granted 95.9% of 565 minor decisions in the latest return. That is a past figure and no promise for your site.

    Why is a decision slower here?

    Only 78.6% of minor cases met the 8-week period or an agreed extension. We advise allowing extra time in your programme.

    What CIL band is Hammersmith and Fulham in?

    Mayoral band 1, at £96.97 per square metre this year.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.