Hammersmith & Fulham, London
Lawful Development Certificate in Hammersmith and Fulham
A Lawful Development Certificate in Hammersmith and Fulham is the council's written confirmation that your extension or loft is lawful without a planning application. We prepare them from £645 including VAT. The borough has 47 conservation areas, so the address check comes first.
From £645 (VAT included)
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

Lawful Development Certificate in Hammersmith and Fulham: conservation first
Hammersmith and Fulham lists 47 conservation areas, and a house inside one has fewer rights. The Order says: On article 2(3) land (conservation areas etc.): no side extensions, no cladding, no rear extension of more than one storey under Class A.
That single rule rules out many of the extensions owners ask us about, which is why we begin with the council's mapping instead of a measured survey. If your street is covered, we say so at quote stage and move straight to the planning route.
The borough also holds 268 listed building entries, 27 of them at Grade II*, and 15 Heritage at Risk Register entries. A listed house needs listed building consent for most external work.

Local figures for Hammersmith & Fulham
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 47 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 268 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Grade II* listed entries | 27 list entries | — | planning.data.gov.uk |
| Heritage at Risk entries | 15 Heritage at Risk Register entries within the LPA boundary (Historic England) | — | planning.data.gov.uk |
| Lawful development certificate applications (PS1) | 94 certificates | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Class A, para A.2 | On article 2(3) land (conservation areas etc.): no side extensions, no cladding, no rear extension of more than one storey under Class A | — | legislation.gov.uk |
| GPDO 2015 Sch 2 Pt 1 Class A, para A.1(f)(i) | 3 m (attached) / 4 m (detached) beyond the original rear wall, single storey | — | legislation.gov.uk |
| Class A, para A.1(i) | Eaves no higher than 3 m where within 2 m of the curtilage boundary | — | legislation.gov.uk |
| GPDO 2015 art 2(1), definition of "dwellinghouse" | Householder permitted development (Sch 2 Part 1) does not apply to flats or buildings containing flats | — | legislation.gov.uk |
| Lawful Development Certificate: proposed use or operation | Half the normal planning fee (householder: £274) | — | ribblevalley.gov.uk |
| DMPO 2015 art 39(10)(a) | 8 weeks | — | legislation.gov.uk |
| Households living in a house | 24.6 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Householder decisions (PS2) | 560 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Which application your project needs
The usual route for a house; flats and listed buildings follow other rules.
- A · Lawful Development Certificate decision
- 8 weeks
- B · Prior approval decision
- 42 days
- C · Householder decision
- 8 weeks
A small certificate caseload, and what it tells us
Hammersmith and Fulham recorded 94 certificate applications of all kinds in the latest full year of its returns to government.
In the same returns the council decided 560 householder planning applications, so its officers see far more planning drawings than certificate drawings. We draw one practical lesson from that: we label each sheet to show which paragraph of the Order every dimension answers.
Terraces, rear additions and the eaves rule
Where a terrace falls outside a conservation area, the usual project is a rear addition. The single-storey limit is: 3 m (attached) / 4 m (detached) beyond the original rear wall, single storey. Terraced plots are narrow, and the boundary eaves rule applies hard: Eaves no higher than 3 m where within 2 m of the curtilage boundary.
We draw the neighbour's wall and eaves on the section, because on a party boundary the neighbouring structure shapes what is practical. Party wall notices may be needed if you build on or against that wall.
Flats and mansion blocks
Only 24.6 per cent of households here live in a house or bungalow. The Order states: Householder permitted development (Sch 2 Part 1) does not apply to flats or buildings containing flats. Flat owners should therefore not expect a certificate for an extension.
For a flat, we prepare a planning application, with the freeholder's consent handled separately. See our planning drawings in Hammersmith and Fulham.
Party walls and tight plots
On a terraced plot, an extension often sits against a neighbour's wall. A Lawful Development Certificate says nothing about your neighbour's rights, which come from the Party Wall etc. Act 1996. Work to or against a shared wall can need a notice, even when no planning application is required.
Our survey records the neighbour's flank wall, the eaves line and any chimney or window near the boundary, and the drawings show them. That helps the officer, and it gives your builder and party wall surveyor accurate information from the start.
We flag the likely notices in the handover note, so you can serve them in good time before building begins.
Fee, timing and what we send
The council's fee for a proposed-use certificate is: Half the normal planning fee (householder: £274). You pay it to the council; our fixed fee is £645 including VAT. The statutory decision period is 8 weeks.
The submission has location and block plans plus existing and proposed plans, elevations and a section. A second chartered technologist checks the set. Any amendment the officer asks for is drawn without a further fee.
Because plots are tight, we also show the position of any drain or manhole near the extension on the plan when the survey records one, so the builder can plan around it from the outset.
Where to go next
After a certificate, the technical stage is covered by building regulations drawings in Hammersmith and Fulham. For the borough overview, see architectural drawings in Hammersmith and Fulham. Next door, compare Kensington and Chelsea and Wandsworth.
What you receive


Related pages
Other services in Hammersmith & Fulham
Lawful Development Certificates nearby
Questions
Can I extend a terrace in a Hammersmith and Fulham conservation area under permitted development?
Only within tighter limits. On article 2(3) land (conservation areas etc.): no side extensions, no cladding, no rear extension of more than one storey under Class A. We check your street first.
How many conservation areas are there?
The council publishes 47.
Does a flat qualify?
Householder permitted development (Sch 2 Part 1) does not apply to flats or buildings containing flats.
What does the council charge?
Half the normal planning fee (householder: £274), paid to the council.
Do I need my neighbour's agreement for a certificate?
No. A certificate application does not need it, though the Party Wall etc. Act 1996 may apply separately to work on a shared wall.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- ribblevalley.gov.uk, retrieved
- legislation.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.