In Ealing the first sum on a new house is not floor area but postcode, because the borough charges its community infrastructure levy at one rate in central Ealing and a lower one everywhere else. We prepare new build drawings for Ealing plots from £1,450 including VAT, checked by a second chartered technologist before they leave us.

From £1,450 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on new build drawings

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline

    Ealing's two-zone levy and what it does to a small scheme

    The borough's charging schedule is the London Borough of Ealing Community Infrastructure Levy (CIL) Charging Schedule. Its residential rates read: £300/m² (Central Ealing); £150/m² (Rest of LPA). Mayoral CIL (MCIL2) £60/m² indexed additionally. We confirm which zone your address sits in before the first appraisal. For a three-bedroom house of ordinary size, the difference between the two rates is large enough to change whether a scheme is worth building.

    Ealing also sits in the Mayoral CIL band 2, where the indexed rate for permissions granted this year is £72.73 per square metre. Both charges apply to the new floor area, so the drawing schedule we supply lists gross internal area dwelling by dwelling.

    The council's own application fee is separate again, at £610 per dwelling for up to nine homes.

    Red-brick mansion blocks and shopfronts on a street corner

    Local figures for Ealing

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Borough CIL residential rate£300/m² (Central Ealing); £150/m² (Rest of LPA). Mayoral CIL (MCIL2) £60/m² indexed additionally.schedule rate (approved 16 December 2025, effective 1 March 2026; schedule states RICS CIL Index value for 2026: 400 at adoption)ealing.gov.uk
    Mayoral CIL charging band2 MCIL2 charging band (1-3)—london.gov.uk
    Mayoral CIL rate (indexed)72.73 £/m² (indexed, permissions granted in 2026)—london.gov.uk
    Minor application decisions821 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications granted80 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications decided in time94.2 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Green Belt share of the council area6 % of council area covered by green-belt polygons—planning.data.gov.uk
    Conservation areas31 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries309 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Domestic gardens share of land (GLUD 2005)25.6 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk
    Erection of dwellinghouses, not more than 10: per dwellinghouse, from 1 Apr 2026610 GBP per dwelling—ribblevalley.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Ealing
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    How Ealing has been deciding small schemes

    In the latest return Ealing decided 821 minor applications, granting 80 per cent, and decided 94.2 per cent inside eight weeks or an agreed extension. This is past data covering extensions and changes of use as well as new homes, so we use it as context and not as a forecast.

    Gaps in a file are found quickly, so we front-load the set with what the officer needs, namely a dimensioned site plan, a schedule of areas, sections through the tallest point and an elevation of each face that meets a neighbour.

    Only 50.3 per cent of households here live in a house, and 46.2 per cent own their home, so a good share of Ealing's building stock is flats. Many applicants are therefore adding one house to a street rather than replacing one.

    Policy, heritage and open land

    The development plan is the Ealing Local Plan: Development (or Core) Strategy DPD (2012), with Development Sites DPD and Development Management DPD (December 2013). It is an older plan, so we read it alongside the London Plan and the national space and access rules when we write the policy note for your scheme. The council's SPD 4 - Residential extensions is written for householders, and its tests for outlook and spacing are a useful guide when a new house sits between existing ones.

    Ealing has 31 conservation areas and 309 listed building entries, so a protected neighbour is likely, and 18 entries are on the Heritage at Risk register. Green belt covers 6 per cent of the borough, small in area but still worth checking.

    Domestic gardens make up 25.6 per cent of the land, which is the raw material for most infill proposals. Our planning drawings in Ealing service covers the full application.

    Building regulations and the standards that change the plans

    Planning consent leads to a second set of standards. Accessibility is one: At least 10% M4(3) wheelchair user dwellings; all others M4(2). The water limit of 125 litres/person/day, or 110 where the optional requirement applies and the rule that Associated parking spaces for new dwellings need EV charge points both alter fittings and parking layouts.

    We carry these into construction sheets in our building regulations drawings for Ealing package, so the engineer and the builder work from one model.

    Daylight, outlook and the neighbour on the other side

    In a borough where flats and houses sit side by side, the most contested question on a new house is often what it does to the building next door. Officers look at the outlook from the nearest windows, the shadow cast on the neighbouring garden at different times of year, and whether a new flank wall now stands where a gap used to be.

    We answer those questions with drawings, not adjectives. A section through the gap between the buildings shows the new roof against the old, with the angle from the nearest window marked, and our model produces a simple shadow study where the neighbour's rear garden is small. If the answer is awkward we say so while options are still open, and propose a lower eaves, a stepped rear or a changed roof pitch that settles it.

    The same discipline covers privacy. Windows that look onto a neighbour's garden at close range are the usual reason an officer asks for obscure glazing, and a house designed with its habitable windows facing front and rear seldom needs that change. We would rather design the problem out than draw it in and wait for the comment.

    All of this reaches the council in one coordinated set, so the file an Ealing officer opens is complete from the first page.

    What we do first

    Send the address and a short description. We check the levy zone, constraints and site history, tell you which route applies and quote a fixed fee. After a survey, we test options in our 3D model and you choose one in writing.

    If the council requests changes during the application, we redraw without charge until approval. We never promise a decision, and an officer's view is the council's alone.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Points, not guesses
    Paint across the grid with the pointer.

    Questions

    Which Ealing CIL zone is my plot in?

    The borough charges at two rates: £300/m² (Central Ealing); £150/m² (Rest of LPA). Mayoral CIL (MCIL2) £60/m² indexed additionally. We confirm the zone for your address at the quote stage.

    How quickly does Ealing decide minor applications?

    In the latest return, 94.2% of 821 minor decisions were made within eight weeks or an agreed extension. The statutory period is 8 weeks for a non-major scheme.

    Is there green belt in Ealing?

    Green belt covers 6% of the borough. We check your plot against the boundary map at the start.

    Do I pay Mayoral CIL as well as the borough levy?

    Yes. Ealing is in Mayoral band 2, at £72.73 per square metre this year, in addition to the borough charge.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.