Greenwich, London

Construction drawings in Greenwich

Construction drawings for a Greenwich house are the build-ready set your contractor prices from, and in this borough they have to sit alongside a planning history shaped by 23 conservation areas and a World Heritage Site. We draw them as chartered architectural technologists. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on construction drawings

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Pencil resting on a dimensioned technical drawing beside a scale rule

    What Greenwich's heritage means for construction drawings

    Greenwich publishes 23 conservation areas, and Historic England lists 540 entries inside the borough boundary, of which 28 are Grade I. The borough also contains 1 World Heritage Site. None of these numbers is a rule on its own, but they decide how much latitude a builder has once permission is in hand.

    The point for construction drawings is simple: the planning approval fixes materials, window styles and roof profiles, and the technical set must not quietly depart from them. If the approved elevation shows a slim timber sash, our window schedule names a slim timber sash with a thermal specification that still reaches the limit in Approved Document L. A builder who swaps in a bulkier unit to hit the U-value has changed the elevation and may be asked to explain.

    For a house near a listed neighbour or inside a conservation area, we also keep the structural openings, flues and rooflights on the drawings in the positions the council approved. Anything that moves, we flag before issue, so the question goes to the planning officer while it is still cheap to ask.

    Heritage at risk is a further signal. Historic England records 22 entries on its register within the borough, and a neighbouring building in poor condition can make officers and building control more careful about vibration, shoring and party-wall movement. We note the neighbour condition on the structural sheets, so your builder knows where the sequence of works needs care.

    Steel beams supporting exposed timber floor joists on temporary props during a house renovation

    Local figures for Greenwich

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas23 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries540 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Grade I listed entries28 list entries—planning.data.gov.uk
    worldHeritageSites1 World Heritage Sites intersecting the LPA boundary—planning.data.gov.uk
    Householder decisions624 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted77.1 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time94.2 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Households living in a house48.4 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Domestic gardens share of land (GLUD 2005)23.2 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk
    Approved Document K 2013, para 1.3, Table 1.1Private stair: rise 150-220 mm, going 220-300 mm, max pitch 42°, 2R+G 550-700 mm—gov.uk
    Approved Document B Vol 1, 2019 ed. incl. 2026 amendments, para 2.10Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor—gov.uk
    Approved Document L Vol 1 2021 incl. 2023 amendments, Table 4.2New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Greenwich
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Greenwich planning figures that shape the build programme

    In its latest twelve months the council decided 624 householder applications and granted 77.1 per cent. Of those, 94.2 per cent were decided within eight weeks or an agreed extension. A grant rate like that means most schemes get through, so the realistic risk is delay and condition discharge rather than outright refusal.

    Conditions are where construction drawings earn their fee. A typical householder consent in a sensitive area asks for sample materials, brick bond or window details before work starts. We prepare those detail sheets as part of the set, so the condition can be discharged from the same drawings your builder is using.

    The council has also issued 437 lawful development certificates in the dataset period. Where your project was cleared that way instead of by a planning application, there are no approved-plan conditions, but the Building Regulations still apply in full and the set carries the same technical content.

    Houses, flats and gardens in Greenwich

    Only 48.4 per cent of Greenwich households live in a house or bungalow, so a good share of our work here is in flats and maisonettes, where a loft or rear alteration touches a lease and a neighbour above or below. Domestic garden covers 23.2 per cent of the land, a useful reminder that plots are modest and rear extensions are often limited by daylight to the next-door window.

    That shapes how we draw. On a tight plot the foundation depth, the drain runs and the party-wall line all sit within a few hundred millimetres of each other, so we show them on a single coordinated plan. Where a neighbour's structure is affected, our structural calculations feed the beam and foundation sheets directly.

    Mayoral CIL is charged in Greenwich at £25 per square metre under the current schedule, and the council has its own charging schedule on top. Floor areas on our drawings are stated to the same convention the levy uses, which makes the liability easy to check before anyone signs a contract.

    What the Greenwich set contains

    A first-floor extension or loft needs more than a plan. The set includes structural plans with beam and lintel positions, sections through every junction, a stair drawing checked against Approved Document K, escape window sizes against Approved Document B, drainage routes, a ventilation layout and a specification that names the product behind each U-value. The limits for these items are in the table above.

    Greenwich jobs often involve a mix of old and new fabric: solid brick walls with lime mortar, a later rear addition, a roof that has been patched more than once. We draw the existing construction as found on the survey, then show exactly where new insulation, a damp-proof course or a cavity tray meets it. That junction detail is the one a site team cannot improvise, and it is the one most likely to be queried at inspection.

    Your builder prices a single building rather than guessing at one, and building control inspects against a document that already answers the first round of questions. Under the Part 2A rules the domestic client's duties pass to the contractor, which our handover note explains in plain English.

    Every sheet is read by a second technologist before it leaves us. If the council or an inspector asks for an amendment we revise the drawings at no charge.

    Next steps in Greenwich

    Start with the borough overview at architectural drawings in Greenwich, then look at building regulations drawings in Greenwich for the approval route. For energy compliance, see SAP calculations in Greenwich.

    Along the Thames and beyond, the same technical set is available in Lewisham, Bexley and Newham. The general service explanation is at construction drawings in London.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Brick house being extended, with a wide new opening supported over the ground floor
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Do I need construction drawings if I am in a Greenwich conservation area?

    Yes, and the planning approval usually sets the materials and window details they must follow. The borough has 23 conservation areas, so we check yours before the set is drawn.

    Does Greenwich Council approve construction drawings?

    No. The council decides planning. Building Regulations compliance is checked by building control, either the council's or a registered approved inspector, using the technical information in the set.

    How long do Greenwich householder decisions take?

    94.2 per cent of householder applications were decided within eight weeks or an agreed extension, so construction drawings can be prepared while you wait.

    What does a Greenwich construction set cost?

    Fixed quote after a free constraints check, because the price depends on the size and complexity of the scheme.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.