Construction drawings in Brent

Brent construction drawings give your builder every level, junction and specification the planning approval left open. Brent publishes four relevant guides, led by its Residential Extensions and Alterations Supplementary Planning Document, and its 39 Article 4 directions change what a builder may fit to the front of a house. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on construction drawings

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    House extension under construction with scaffolding, new glazed doors and building materials

    Construction drawings in Brent and the council's four guides

    Brent has no rule about construction drawings, but it has plenty about what they must deliver. The relevant guides are the Residential Extensions and Alterations Supplementary Planning Document, the Basement Supplementary Planning Document, the Brent Design Guide Supplementary Planning Document (SPD1) and the Houses in Multiple Occupation SPD. All sit beneath the Brent Local Plan 2019-2041, adopted in 2,022.

    Each guide reaches a different project. The extensions document governs most rear and side additions. The basement document matters if the work goes down as well as out. The design guide sets the tone for materials and detail, and the multiple-occupation guide applies when a house is being divided or shared. We tell you at the first call which of them touches your job.

    Our drawings then quote the relevant requirement on the sheet it governs, so building control and your builder see the same source. For the planning layer behind it, see planning drawings in Brent.

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Local figures for Brent

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas23 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions39 Article 4 directions published by the council—planning.data.gov.uk
    Article 4 direction areas162 Article 4 direction area polygons published by the council—planning.data.gov.uk
    Listed building entries93 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Heritage at Risk entries11 Heritage at Risk Register entries within the LPA boundary (Historic England)—planning.data.gov.uk
    Owner-occupied households38.4 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Householder applications granted86.6 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Larger home extension prior approvals refused79 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Mayoral CIL charging band2 MCIL2 charging band (1-3)—london.gov.uk
    Approved Document B Vol 1, 2019 ed. incl. 2026 amendments, para 2.10Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Brent
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Article 4 on the front, a rented street behind

    Brent's heritage layer is wide rather than deep: 23 conservation areas and 39 Article 4 directions spread across 162 mapped areas. Historic England lists 93 entries, and the council counts 11 heritage assets at risk. Because a direction can remove the right to change windows, doors or front boundaries without consent, we draw the front elevation to match what is there unless consent says otherwise.

    Only 38.4 per cent of households here own their home, and 43.3 per cent live in a house. Many clients are therefore landlords or leaseholders. That brings lease terms, freeholder consent and tenant protection into the programme, so we ask for those documents before pricing.

    Bedrooms, escape routes and what a loft stair must do

    In a converted loft or a new first floor, the bedroom window is also the escape route. Escape window: unobstructed openable area at least 0.33 m², at least 450 mm high and 450 mm wide, bottom of opening no more than 1100 mm above floor. We write these three dimensions on the window schedule, because they are the numbers an inspector checks.

    The stair comes next: Private stair: rise 150-220 mm, going 220-300 mm, max pitch 42°, 2R+G 550-700 mm. With 2.0 m clear headroom over stairs, a loft stair needs working out on a section before the layout is agreed.

    Alarms complete the picture. All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. We locate every alarm and interlink on the plan.

    Brent's decision figures

    The council decided 879 householder applications in its latest published year, granting 86.6 per cent, with 97.2 per cent decided in time. For larger home extensions through prior approval, the council granted 10 and refused 79.

    Refusals at that scale are why we suggest a lawful development or planning check before committing to detailed drawings. Paying for construction drawings before the route is clear is a cost that can be avoided.

    Houses to flats: what changes when a home is shared

    Because so many Brent homes are rented, a good share of our enquiries are about dividing a house, adding a flat or upgrading an existing conversion. Each of those adds fire separation, sound insulation between units and a protected escape route, and the drawings must show all three at the right scale.

    The council's multiple-occupation guide applies to shared housing, and any scheme that adds bedrooms should be checked against it before detail is drawn. We would rather tell you at the quote stage that a layout will struggle than draw a full set for it.

    Where the project is a straightforward family extension, none of this applies and the set stays shorter. We scope each Brent job to what it needs and say clearly which items we have left out.

    Fees, scope and neighbouring boroughs

    We quote a fixed fee after the free constraints check and show what the set includes. Mayoral CIL sits in band 2 here, and Brent's own levy is £357.14/m² (Residential, Use Classes C3 & C4; schedule base rate £200.00/m²); both depend on floor area, so we measure it carefully.

    Related help: building regulations drawings in Brent, structural calculations in Brent and the borough summary at architectural drawings in Brent. Nearby, the same set is available in Ealing, Camden and Barnet.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Steel beams supporting exposed timber floor joists on temporary props during a house renovation
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Which Brent guide applies to my extension?

    Most householder work falls under the extensions SPD. If you are digging down, the basement SPD applies as well, and if the house will be shared by several households the multiple-occupation SPD joins in.

    Does Article 4 affect the construction specification in Brent?

    Where a direction covers your street, we specify like-for-like windows and doors at the front unless the council has consented to a change.

    Can a landlord commission construction drawings in Brent?

    Yes. We ask for the lease or title, evidence of consent where needed and the tenancy position, then price a fixed fee.

    Sources and dates