Tower Hamlets, London
Planning drawings in Tower Hamlets
Planning drawings in Tower Hamlets start at £745 including VAT. The council granted 92.7 per cent of its 191 householder applications in the latest published year, but only 12 per cent of households live in a house, and flats cannot use permitted development. For them a full application is the normal route.
From £745 (VAT included)
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

Planning drawings in Tower Hamlets: the policy officers read
The development plan is the Tower Hamlets Local Plan 2031: Managing Growth and Sharing the Benefits, adopted in 2,020. Alongside it the council uses the Central Area Good Growth SPD and the High Density Living SPD. Neither is an extensions guide, so on a householder scheme the case officer reads your sheets against the local plan policies and against what stands on the street.
That shapes how we draw. The elevations show the neighbours' windows and eaves, the proposed height is set against them, and the plans mark every habitable room that looks onto the new work. The High Density Living document matters most when a flat is reconfigured or a block gains a unit, so we read it before the design is frozen.
A Tower Hamlets set therefore leans on context drawings more than a suburban one does. Photographs of the street, a clear street elevation and a short design note let an officer see the relationship without a site visit.
Flats add a vertical question. Where a scheme changes the layout of one unit in a block, we draw the floor above and below as far as it is known, so the officer can see where bedrooms sit over living rooms and where new walls meet existing structure. It costs little at the drawing stage and prevents an early request for more information.

Local figures for Tower Hamlets
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 59 named conservation areas published by the council | — | planning.data.gov.uk |
| Article 4 directions | 64 Article 4 directions published by the council | — | planning.data.gov.uk |
| Listed building entries | 916 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Tree preservation orders | 72 tree preservation orders published by the council | — | planning.data.gov.uk |
| Householder decisions | 191 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications granted | 92.7 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 95.8 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Larger home extension prior approvals granted | 3 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Larger home extension prior approvals refused | 4 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Householder: alterations/extensions to a single dwellinghouse, from 1 Apr 2026 | 548 GBP | — | ribblevalley.gov.uk |
| Householder: two or more dwellinghouses (or flats) | 1,083 GBP | — | ribblevalley.gov.uk |
| DMPO 2015 art 34(2)(b): non-major development | 8 weeks | — | legislation.gov.uk |
| GPDO 2015 art 2(1), definition of "dwellinghouse" | Householder permitted development (Sch 2 Part 1) does not apply to flats or buildings containing flats | — | legislation.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Which application your project needs
The usual route for a house; flats and listed buildings follow other rules.
- A · Lawful Development Certificate decision
- 8 weeks
- B · Prior approval decision
- 42 days
- C · Householder decision
- 8 weeks
Flats, freeholders and the ownership certificate
Householder permitted development (Sch 2 Part 1) does not apply to flats or buildings containing flats. In practice that means a flat extension, a roof terrace or a change to the elevations is a planning application, drawn in full, with no Lawful Development Certificate shortcut.
The fee depends on what the application covers. One dwelling pays £548. An application covering two or more houses or flats pays £1,083. Both go to the council, separate from our fixed fee.
Ownership needs care here, where 23.1 per cent of households own their home. The rule behind the certificate is this: Owners and agricultural tenants counted 21 days before the date of the application. If you are a leaseholder, the freeholder is an owner who must be served notice, and a planning decision does not replace the freeholder's consent under your lease. We flag this at the quote stage, before any drawing starts.
Freehold houses are simpler. The owner signs the certificate, the neighbours are consulted for at least 21 days, and the application runs on its normal course. Whichever applies, we prepare the certificates and the Planning Portal submission with the drawings, so nothing is left for you to complete after we hand over.
Heritage layers that change the drawings
Tower Hamlets publishes 59 conservation areas and 64 Article 4 directions, and Historic England records 916 listed entries inside the boundary. Where a layer applies, the drawings change: the conservation area boundary goes on the location plan, existing materials are noted on the elevations, and a listed house needs a consent drawn alongside the application.
Trees can also constrain a design. The council publishes 72 tree preservation orders, so we check the address for one before a ground-floor extension is placed.
How Tower Hamlets has decided applications
Across all types the council decided 998 applications in its latest national return and granted 83.6 per cent. For householder cases alone it granted 92.7 per cent over its latest twelve months, and 95.8 per cent were decided inside eight weeks or an agreed extension.
Larger home extension prior approvals are few here: the council granted 3 and refused 4 in that year. These figures describe the borough, not your house, and we use them for planning the timetable only.
What the planning set contains and costs
You receive existing and proposed plans, elevations and sections, a location plan and a block plan. The national guidance sets the scale: Typically 1:1250 or 1:2500, site edged red including access to the highway, other owned land edged blue. The guidance on drawings adds this: Plans and drawings must be drawn to an identified scale and plans must show north.
The price is £745 with VAT included, fixed before you commit. A second chartered technologist checks each sheet against the council's validation list, and if the council asks for changes we redraw at no charge until approval. Where a house extension falls within permitted development, a Lawful Development Certificate in Tower Hamlets may be the lighter route, and prior approval drawings cover the larger rear extension case.
Where a proposal sits close to neighbouring windows, a daylight and sunlight report in Tower Hamlets is sometimes worth commissioning with the application.
Nearby councils and the wider picture
For the borough as a whole, see our architectural drawings in Tower Hamlets page. The national version of this service is on the planning drawings hub, and the neighbouring boroughs of Newham and Hackney read the same national rules through their own local plans.
What you receive


Related pages
Other services in Tower Hamlets
Questions
Do I need planning permission for a flat in Tower Hamlets?
For external changes, extensions or new openings, yes. Householder permitted development does not apply to flats, so the work needs a full application with drawings.
How much do planning drawings cost in Tower Hamlets?
From £745 including VAT, fixed up front. The council's application fee, £548 for one dwelling, is paid separately.
How long does Tower Hamlets take to decide an application?
The statutory period for a non-major application is 8 weeks unless you agree an extension. We cannot promise a decision date.
I am a leaseholder. Do I need my freeholder?
Yes. The freeholder counts as an owner on the application, and your lease may need separate consent for the work. Planning permission does not override the lease.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- ribblevalley.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- towerhamlets.gov.uk, retrieved
- towerhamlets.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- gov.uk, retrieved
- nomisweb.co.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.