020 7864 7245Request a fixed quote

Islington, London

Plumbing and drainage drawings in Islington

Islington's tight Victorian streets pack houses and basements over old brick sewers, and its Local Plan sets strict limits on surface water and mains water use. Our plumbing and drainage drawings in Islington show the falls, connections and protection a new bathroom, basement or extension needs, and give the council's surface water policy the figures it asks for. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on plumbing and drainage drawings

    Four steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    4. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Brick house being extended, with a wide new opening supported over the ground floor

    Surface water policy and plumbing and drainage drawings in Islington

    The Local Plan's surface water policy governs sustainable drainage, and its numbers are specific. Major schemes must aim for greenfield run-off where feasible, and the rule summary gives the figures as 8 l/s/ha; 1:100 + 40%: a run-off rate for the borough and a storm volume with an allowance for climate change. They must also submit the London Surface Water Drainage Pro-forma.

    Smaller schemes are held to a lower test. A minor new build of one unit or more must reduce existing run-off as far as possible, or at the very least maintain it. A house with a new rear extension covers part of a garden with a roof, so the drainage drawing shows where the new roof water goes and what the paved area drains to.

    Water use is the second half of the policy. Two further paragraphs ask every development to demonstrate efficiency through its Sustainable Design and Construction Statement, with residential development reaching 105 l/person/day, excluding a small external allowance. Our plumbing schematic lists every tap, shower and cistern against that figure.

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Local figures for Islington

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Policy S9: majors must reach greenfield run-off (8 l/s/ha in Islington) where feasible, storing the 1-in-100-year plus 40% climate-change volume, and submit the London Surface Water Drainage Pro-forma; minor new build of one unit or more must reduce existing run-off as far as possible or at least maintain it.8 l/s/ha; 1:100 + 40%—islington.gov.uk, Islington Local Plan: Strategic and Development Management Policies (adopted 28 September 2023), Policy S9 F-I, p.223; para 6.147, p.226; validation item 4.8(e), pp.25-26
    Policy S9 K and M: all developments must show water efficiency through the SDCS; residential development must achieve mains water consumption of 105 litres or less per head per day (excluding up to 5 litres external); non-residential to achieve all BREEAM Wat 01 credits.105 l/person/day—islington.gov.uk, Islington Local Plan: Strategic and Development Management Policies (adopted 28 September 2023), Policy S9 K and M, p.224; para 6.152, p.226
    Supplementary planning documentBasement Development SPD2016islington.gov.uk
    Households living in a house16.3 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households26.7 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Conservation areas41 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries1,050 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    AD H (2015) Requirement H4 paras 0.1, 1.5 and 1.6, PDF pp.50-513 m—gov.uk
    AD H (2015) Requirement H4 paras 0.1, 1.5 and 1.6, PDF pp.50-516 m—gov.uk
    AD H (2015) para 2.34 and Table 6, PDF p.18 (printed p.16)1 in 40—gov.uk
    Building Regulations 2010 reg.36(1)-(3); AD G (2015 incl 2016 and 2024 amendments) Requirement G2 and reg.36, PDF p.17125 litres per person per day—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Islington
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Basements, terraces and building over old drains

    The borough's Basement Development SPD covers the digging and drainage issues of basement work, and those need settling early. A terrace here usually has a shared drain along the rear, a sewer below the street and little room between them. Approved Document H asks for special care when building within 3 metres of a drain's centreline.

    A pipe should not pass under a building for more than 6 metres, and building over is not advised where the drain is deeper than 3 metres or larger than 225 millimetres across. Our drawing marks the drain, the offset to the new wall and the protection proposed, which is what the water company's engineer needs to see.

    Basements also raise the pumping question. A basement bathroom below the sewer level needs a pumped outlet with an alarm and a non-return valve, and the drawing shows the chamber, the rising main and the point where it joins gravity drainage.

    Falls, water use and connections

    Foul drains need a minimum gradient: a one-hundred-millimetre pipe may run at 1 in 40 where peak flow is under one litre per second, and at 1 in 80 (minimum 1 WC) above that. In a terrace with a shallow existing drain, the fall is often what decides where a new bathroom can go.

    New dwellings must meet a water-use standard under the Building Regulations of 125 litres per person per day, or 110 where the optional requirement applies. Islington's own limit is lower, so our fittings schedule is specified to the council figure. The bath outlet is limited to 48 degrees Celsius.

    A connection to a public sewer needs a notice, to which the sewerage undertaker has 21 days to respond.

    How we draw a basement bathroom in a terrace

    Picture a lower-ground bathroom in an Islington terrace. The outlet sits below the street sewer, so the waste must be lifted. We draw the pump chamber, the rising main to a high-level connection and a gravity drain beyond it, with the vent routed to a point on the rear elevation the heritage officer can accept.

    The hot and cold supplies follow, with isolation valves in reach and the cylinder or heat source marked. Every pipe is labelled with its size, and the sheet notes what the plumber must test before the finishes go on.

    A borough of flats, heritage and party walls

    Only 16.3 per cent of households live in a house, and 26.7 per cent own their home, so many jobs involve a flat in a converted building, with drains shared between floors. Islington holds 41 conservation areas and 1,050 listed building entries, which limits where a new soil stack or vent can rise on an elevation.

    Digging near neighbours can trigger the Party Wall etc. Act: excavation within 3 metres of a neighbouring building and deeper than its foundations, or within 6 metres where a forty-five degree line crosses the work. Our party wall notices service covers the paperwork.

    The set sits within your building regulations drawings in Islington and construction drawings. The plumbing and drainage drawings hub and the electrical design drawings in Islington page cover the neighbouring services.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Two-storey rear extension under construction on a semi-detached house
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    What run-off limit applies to major schemes in Islington?

    The surface water policy gives 8 l/s/ha; 1:100 + 40% for majors where feasible. Minor new build must reduce run-off or at least maintain it.

    What water-use standard does Islington set for homes?

    Residential development must reach 105 l/person/day, excluding a small external allowance.

    Can I build an extension over a drain?

    Sometimes. Approved Document H sets distances and pipe limits, and the water company usually has to agree. The drawing shows the drain and the protection.

    How much do plumbing and drainage drawings cost in Islington?

    Fixed quote after a free constraints check.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.