020 7864 7245Request a fixed quote

Hounslow, London

Lawful Development Certificate in Hounslow

A Lawful Development Certificate in Hounslow is the council's signed finding that your extension, loft conversion or garden building is lawful without a planning application. MCIAT chartered architectural technologists prepare it from £645 including VAT. Hounslow has 519 listed building entries and 33 conservation areas, so we confirm your house still has its householder rights before anything is drawn.

From £645 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on lawful development certificates

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline

    Where Hounslow's heritage removes householder rights

    A certificate answers the planning question only. A listed house in Hounslow also needs listed building consent for most alterations, and with 519 entries in the borough that is not a rare case. We read the statutory list against your address, including any older structure in the garden that may be listed with the house.

    Conservation areas change the rules without removing them. In the borough's 33 areas the Order says: On article 2(3) land (conservation areas etc.): no side extensions, no cladding, no rear extension of more than one storey under Class A. A world heritage site also touches the borough boundary, and it brings its own sensitivities to height and views even where permitted development still applies.

    Direction coverage is light: Hounslow publishes 3 Article 4 directions. That is good news for a certificate, but we still search them, because a single direction on your road is enough to change the answer.

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Local figures for Hounslow

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Lawful development certificate applications (PS1)445 certificates2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Conservation areas33 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries519 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Article 4 directions3 Article 4 directions published by the council—planning.data.gov.uk
    worldHeritageSites1 World Heritage Sites intersecting the LPA boundary—planning.data.gov.uk
    Households living in a house54 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households45.7 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Larger home extension prior approvals granted20 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Larger home extension prior approvals refused59 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Householder applications granted (PS2)74.7 % of householder decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    GPDO 2015 Sch 2 Pt 1 Class A, para A.1(f)(i)3 m (attached) / 4 m (detached) beyond the original rear wall, single storey—legislation.gov.uk
    Lawful Development Certificate: proposed use or operationHalf the normal planning fee (householder: £274)—ribblevalley.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Hounslow
    Which application your project needsLawful Development Certificate decision: 8 weeks. Prior approval decision: 42 days. Householder decision: 8 weeksYour projectWithin permitted development?Lawful Development CertificatePrior approvalHouseholder applicationYesLarger rear extensionNoABC

    Which application your project needs

    The usual route for a house; flats and listed buildings follow other rules.

    A · Lawful Development Certificate decision
    8 weeks
    B · Prior approval decision
    42 days
    C · Householder decision
    8 weeks

    Houses, flats and rented homes

    Only 54 per cent of Hounslow households live in a house or bungalow, and 45.7 per cent own their home. Many of the rest live in flats, and householder rights do not run to flats: Householder permitted development (Sch 2 Part 1) does not apply to flats or buildings containing flats. If you own a maisonette or a flat above a shop, a certificate for an extension is the wrong tool. We tell you at the first check and suggest a planning application.

    Houses are where a certificate earns its fee. The single-storey rear allowance reads: 3 m (attached) / 4 m (detached) beyond the original rear wall, single storey, with a loft allowance of 40 m³ (terrace house) / 50 m³ (any other house) additional roof volume. The original house, not the one standing today, is the baseline, so earlier owners' works eat into the allowance first.

    What Hounslow's record suggests about route choice

    The borough recorded 445 certificate applications. On the neighbour-consultation route for deeper rear extensions it granted 20 and refused 59, a heavy tilt towards refusal. If your extension is meant to go beyond the standard depth, a certificate cannot help and prior approval in Hounslow looks hard on that evidence, so a full planning application in Hounslow may be the better start.

    Hounslow granted 74.7 per cent of decided householder applications, and it met the deadline in 98 per cent of them. The adopted plan is the Hounslow Local Plan 2015-2030 (Volumes 1 and 2), and officers lean on the Character, Sustainability and Design Codes SPD for design questions. A certificate is not weighed against either, but we use both to make borderline measurements sit comfortably.

    Lawful Development Certificate in Hounslow: from survey to submission

    We visit, measure the footprint, eaves and ridge, and record every outbuilding. The set contains a location plan, block plan, floor plans, elevations and a roof section. A second chartered technologist checks each figure against the Order, you approve, and we submit.

    The council's fee is separate from ours: Half the normal planning fee (householder: £274). The statutory period is 8 weeks. Any amendment the officer requests is made without a further fee, and if the answer is no we weigh a redraw against an appeal in Hounslow with you. We promise a careful file, never a result.

    Owners in Hounslow often want the loft and the rear done together. Each is measured against its own limit and then against the other, because both draw on the same original house, and the sheet shows the loft volume and the rear depth side by side. If one pushes you over, we say which and by how much, so you can trim it on paper at no cost instead of discovering it at refusal.

    What to have ready

    Gather the title plan if you hold one, any earlier permissions or certificates for the address, and dated photographs of work done by a previous owner. Where a previous extension has no paperwork, tell us early: we measure it and decide whether it sits in your allowance or needs its own evidence. After the certificate, the same survey feeds our building regulations drawings without a second visit.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Brick cottage with a tiled roof, chimneys and a front dormer window
    Locked in
    Bring the pointer close to the padlock.

    Questions

    Can a Hounslow flat owner get a Lawful Development Certificate for an extension?

    Not under householder rights, which do not apply to flats. Only 54 per cent of the borough's households live in houses, so we check the property type first.

    Does a listed house in Hounslow need anything else?

    A certificate does not cover listed building consent, which most alterations to a listed house also need. The borough has 519 listed entries, so we check first.

    How long does the decision take?

    The statutory period is 8 weeks, and the council charges Half the normal planning fee (householder: £274).

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.