020 7864 7245Request a fixed quote

Ealing, London

Lawful Development Certificate in Ealing

An Ealing Lawful Development Certificate gives you the council's written proof that a rear extension, side extension or loft conversion needs no planning application. We prepare and submit them for Ealing homes from £645 including VAT. Ealing has 31 conservation areas, so the first job is to find out which side of the line your house falls on.

From £645 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Pencil resting on a dimensioned technical drawing beside a scale rule

    Lawful Development Certificate in Ealing: the borough in figures

    Ealing is a busy borough for these applications. Its returns to government show 754 certificate applications of all kinds in the latest full year, so officers see a lot of near-identical extension drawings and know quickly when a sheet is thin.

    Two local facts shape the advice we give. The borough lists 31 conservation areas, and Historic England records 309 listed building entries, 6 at Grade I and 18 at Grade II*. Inside a conservation area the Order restricts what you can build as of right, and a listed house needs listed building consent for most external work.

    Ealing's extension guidance is SPD 4 - Residential extensions, supporting the Ealing Local Plan: Development (or Core) Strategy DPD (2012), with Development Sites DPD and Development Management DPD (December 2013). It guides planning applications. A certificate application is tested against the Order, but we read the SPD as well, because it shows what the council will expect if your scheme has to become a planning application.

    Brick cottage with a tiled roof, chimneys and a front dormer window

    Local figures for Ealing

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas31 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries309 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Grade I listed entries6 list entries—planning.data.gov.uk
    Grade II* listed entries18 list entries—planning.data.gov.uk
    Lawful development certificate applications (PS1)754 certificates2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Supplementary planning documentSPD 4 - Residential extensions—ealing.gov.uk
    Class A, para A.1(j)Side extension: single storey, max 4 m high, max half the width of the original house—legislation.gov.uk
    GPDO 2015 Sch 2 Pt 1 Class A, para A.1(f)(i)3 m (attached) / 4 m (detached) beyond the original rear wall, single storey—legislation.gov.uk
    Class A, para A.1(b)Buildings (other than the original house) may not cover more than 50% of the curtilage—legislation.gov.uk
    GPDO 2015 art 2(1), definition of "dwellinghouse"Householder permitted development (Sch 2 Part 1) does not apply to flats or buildings containing flats—legislation.gov.uk
    Lawful Development Certificate: proposed use or operationHalf the normal planning fee (householder: £274)—ribblevalley.gov.uk
    DMPO 2015 art 39(10)(a)8 weeks—legislation.gov.uk
    Households living in a house50.3 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Domestic gardens share of land (GLUD 2005)25.6 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Ealing
    Which application your project needsLawful Development Certificate decision: 8 weeks. Prior approval decision: 42 days. Householder decision: 8 weeksYour projectWithin permitted development?Lawful Development CertificatePrior approvalHouseholder applicationYesLarger rear extensionNoABC

    Which application your project needs

    The usual route for a house; flats and listed buildings follow other rules.

    A · Lawful Development Certificate decision
    8 weeks
    B · Prior approval decision
    42 days
    C · Householder decision
    8 weeks

    Side extensions and the half-width rule

    In Ealing, 50.3 per cent of households live in a house or bungalow, so side extensions are a frequent question. The Order's limit reads: Side extension: single storey, max 4 m high, max half the width of the original house.

    The half-width test is measured against the original house, which trips people up when a garage has already been added. We draw the original footprint in a separate line weight so the case officer can see the sum at a glance. In a conservation area the right to a side extension is withdrawn altogether, and we confirm that before you commit to a design.

    Rear and wraparound projects

    Rear extensions are the other staple. The single-storey limit is: 3 m (attached) / 4 m (detached) beyond the original rear wall, single storey. Combined with a side addition, a wraparound can easily break the limit on one side while staying inside it on the other, so we test each elevation separately.

    Domestic gardens made up 25.6 per cent of Ealing's land in the national land-use survey, so the curtilage rule often comes into play. The Order states: Buildings (other than the original house) may not cover more than 50% of the curtilage. When an outbuilding is already in the garden, we add its footprint to the total and show the percentage on the plan.

    Flats, maisonettes and converted houses

    Some large Ealing houses have been split into flats. The Order is plain on this: Householder permitted development (Sch 2 Part 1) does not apply to flats or buildings containing flats. A flat owner therefore needs an application for the extension, and the freeholder's consent is a separate matter.

    If you are not sure whether your building counts as a house or as flats, send us the address and the date of conversion. We check the planning history on the council's search at https://pam.ealing.gov.uk, which usually settles it.

    Showing the original house to Ealing officers

    Every allowance in the Order is counted from the original house, meaning the building as first built or as it stood when modern planning control began. Older houses may have been altered more than once, so we gather the evidence in three steps: the earlier planning history on the council's online register, historic mapping for the footprint, and our own measured survey.

    Where a past extension has no paper trail, we record it as existing and count it against your allowance. Doing this at the start avoids trouble later, when an officer finds the earlier work on old mapping and decides that the allowance is already used.

    The result is a one-page summary at the front of the set that states the original footprint, what has been added since and what remains. It also gives you a plain record to hand to a buyer's solicitor when you sell.

    Fee, timing and the drawings

    The council's fee for a proposed-use certificate is: Half the normal planning fee (householder: £274). It goes to Ealing, separate from our fixed fee of £645 including VAT. The statutory decision period is 8 weeks.

    The pack contains location and block plans plus existing and proposed floor plans, elevations and sections. We prepare it from a measured survey, and a second technologist checks it before submission. Should the officer ask for changes, we make them at no extra fee.

    Other services and neighbouring boroughs

    If the certificate route is closed, see our planning drawings in Ealing, or read building regulations drawings in Ealing for the technical stage that follows. The borough overview is architectural drawings in Ealing. Neighbouring councils have their own conservation area patterns: compare Hounslow and Brent.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Rows of brick terraced houses and gardens on a residential street
    Locked in
    Bring the pointer close to the padlock.

    Questions

    Do I need a certificate for a side extension in Ealing?

    You do not need one, but it is wise to hold one. The limit is: Side extension: single storey, max 4 m high, max half the width of the original house. It does not apply in a conservation area.

    How many conservation areas does Ealing have?

    The council publishes 31. We check your address against them before we quote.

    Can a flat owner in Ealing get a certificate?

    Not under householder rights. Householder permitted development (Sch 2 Part 1) does not apply to flats or buildings containing flats.

    How long does the decision take?

    The statutory period is 8 weeks, and Ealing can agree a longer period with you.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.