Haringey, London
Hip-to-gable loft conversion drawings in Haringey
Haringey's hipped houses sit among dense designations: 33 conservation areas and 25 Article 4 directions. Our hip-to-gable loft conversion drawings in Haringey begin with those layers, then settle the route and the stair. The fee is a fixed quote after a free check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on hip-to-gable loft conversion drawings
Nine steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Design options
We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.
Design frozen
You choose an option in writing. Nothing changes after this without your say.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Submission
We prepare the forms, certificates, fee and documents and submit through the Planning Portal.
Officer liaison
We answer the planning officer and make any amendments within five working days, at no charge until approval.
Building regulations
Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.
Approval and hand-over
Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Haringey's guidance and where it applies to a roof
The one Haringey document in our data that touches a related topic is the House extensions in South Tottenham SPD (revised), which sits under the Haringey Local Plan: Strategic Policies 2013-2026 (consolidated with 2017 alterations), with the Development Management DPD, Site Allocations DPD and Tottenham Area Action Plan. It deals with house extensions in one part of the borough, and we found no hip-to-gable rule with a stated value in it. So we cannot give you a Haringey headroom or set-back number for this roof, and we will not invent one.
What we can do is read whichever guidance covers your street at survey stage. Tottenham, Crouch End, Muswell Hill and Wood Green each have a different roofscape, and the officer judges a new gable against the pattern of the street. Where houses along the road keep their hips, an isolated gable is the harder case to put forward.
The borough's designations matter more than any single paragraph of guidance. Haringey lists 289 building entries and the Heritage at Risk Register records 21, so a quiet-looking terrace can sit in the setting of something protected.

Local figures for Haringey
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 33 named conservation areas published by the council | — | planning.data.gov.uk |
| Article 4 directions | 25 Article 4 directions published by the council | — | planning.data.gov.uk |
| Listed building entries | 289 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Heritage at Risk entries | 21 Heritage at Risk Register entries within the LPA boundary (Historic England) | — | planning.data.gov.uk |
| Householder decisions | 689 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications granted | 90.3 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 94.3 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Average price, semi-detached | 1,235,802 GBP | 2026-07 | publicdata.landregistry.gov.uk |
| Average price, terraced | 803,381 GBP | 2026-07 | publicdata.landregistry.gov.uk |
| Lawful development certificate applications (PS1) | 396 certificates | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| GPDO 2015 Sch 2 Pt 1 Class B, para B.1(d) | 40 m³ (terrace house) / 50 m³ (any other house) additional roof volume | — | legislation.gov.uk |
| Approved Document K 2013, para 1.13, Diagram 1.4 | Loft conversions where 2.0 m cannot be achieved: 1.9 m at the centre of the stair, 1.8 m at the side (half width) | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Householder applications by street in Haringey
| Street | Applications | Approved |
|---|---|---|
| Sheldon Avenue | 20 | 65% |
| Gladesmore Road | 17 | 88% |
| Stapleton Hall Road | 13 | 82% |
| Boundary Road | 12 | 100% |
| Cholmeley Park | 12 | 78% |
| Craven Park Road | 12 | 100% |
| Seaford Road | 12 | 82% |
| Wargrave Avenue | 12 | 82% |
| Woodside Avenue | 12 | 91% |
| Beresford Road | 11 | 100% |
| Fairview Road | 10 | 100% |
| Onslow Gardens | 10 | 100% |
| Priory Gardens | 10 | 90% |
| Allison Road | 9 | 100% |
| Dukes Avenue | 9 | 78% |
Loft enlargement in section: the permitted development limits
A dormer on the rear slope, with the limits that decide whether it needs planning permission.
- A · Extra roof volume allowed
- 40 m³ (terrace house) / 50 m³ (any other house) additional roof volume
- B · Set-back from the eaves
- Original eaves maintained; enlargement set at least 0.2 m from the eaves measured up the roof slope, so far as practicable (not required for hip-to-gable or roofs joining a rear/side extension)
- C · Height limit
- No part higher than the highest part of the existing roof
Article 4 and conservation areas decide the route
Haringey's 25 Article 4 directions can withdraw permitted development in the areas they cover. Each direction names what it removes, so we read the one that touches your address instead of assuming.
Inside any of the 33 conservation areas the national position is simple: Class B roof enlargements are not permitted development on article 2(3) land. Houses in these areas move straight to planning drawings in Haringey. Houses outside them may qualify for a Lawful Development Certificate in Haringey, and the council handled 396 certificate applications in its latest published year.
The permitted development limits we test
Where the right survives, the volume cap reads 40 m³ (terrace house) / 50 m³ (any other house) additional roof volume. The useful hip-to-gable rule is that Eaves-retention and 0.2 m set-back conditions do not apply to a hip-to-gable enlargement.
Two limits still bite. First, No enlargement beyond the plane of a roof slope that forms the principal elevation and fronts a highway, which rules out a gable on a hip that faces the street. Second, No part of the enlargement may extend beyond the outside face of any external wall of the original house (except where joining a rear or side extension roof). Because the sections prove each limit, we do not freeze a design until the roof has been measured against them.
Haringey's figures for householder applications
Haringey decided 689 householder applications in its latest year, granting 90.3 per cent, and 94.3 per cent were decided on time. The speed is a real point in the borough's favour for an owner on a schedule.
We still draw conservatively and show the street elevation, because the officer judges the roof against its neighbours. Treat the number as context for the whole borough and not a forecast for your roof.
Stairs and fire, and what a Haringey house is worth
Haringey's semi-detached homes average £1,235,802, and its terraced homes £803,381, so the extra bedroom is a serious investment. The stair is the part that makes it workable: Loft conversions where 2.0 m cannot be achieved: 1.9 m at the centre of the stair, 1.8 m at the side (half width).
A loft that becomes a third storey also needs a protected route. New storey above 4.5 m by loft conversion: protect the full escape route with fire-resisting doors (min E 20) and partitions (min REI 30). Both items go on the sheets described in building regulations drawings in Haringey.
Reading a Haringey roof before drawing it
A hip-to-gable behaves differently on each house type. On an end-of-terrace, straightening the hipped flank can add a whole room. On a detached or semi-detached house with a side gap, so the new wall faces open air and the neighbour's light matters more.
On survey day we measure pitch, ridge height and the junction with the adjoining roof, and we photograph the street from both ends so the elevation shows the real pattern of hips and gables. If an Article 4 direction touches the property we obtain its text and note which rights it withdraws.
The drawings that follow are existing and proposed plans, a roof plan, elevations and a stair section. We offer two options where the road is mixed, one with the full gable and one with a smaller change, so you can see what the extra area costs in street appearance. A single fixed quote covers the set, and a second chartered technologist checks it before issue.
Related Haringey roof work and neighbouring boroughs
A rear dormer usually goes with the gable; see dormer loft conversion drawings in Haringey. A lighter roof job may suit you better, so compare it with loft conversion drawings in Haringey.
Next door, Islington and Barnet have their own pages for the same alteration. Everything we do in the borough is gathered at architectural drawings in Haringey.
What you receive


Related pages
Other services in Haringey
Hip-to-gable loft conversion drawings nearby
Questions
Do Haringey's Article 4 directions stop a hip-to-gable loft?
Not automatically. Haringey has 25 directions and each removes different rights, so we read the one covering your property.
Which Haringey document covers roofs?
The House extensions in South Tottenham SPD (revised) deals with extensions in one area, but we found no hip-to-gable value in it. Your street's character decides the rest.
What does a Haringey semi cost?
The average semi-detached sale is £1,235,802 in the latest figures, which is why careful drawings pay for themselves.
Can a hip-to-gable go on a front slope?
Not as permitted development where the slope faces the road. It would need planning permission.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- legislation.gov.uk, retrieved
- gov.uk, retrieved
- haringey.gov.uk, retrieved
- haringey.gov.uk, retrieved
- gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.