Haringey, London

New build drawings in Haringey

In Haringey the same house costs very different amounts in levy depending on which end of the borough it is built in: the west pays several times what the east does. We prepare new build drawings for Haringey plots from £1,450 including VAT, with every sheet checked by a second chartered technologist.

From £1,450 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on new build drawings

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Georgian brick terrace with sash windows, arched fanlight doorways, stone steps and iron railings in London

    West, centre and east: the levy split

    Haringey's charging schedule, the Haringey CIL Charging Schedule 2022, divides the borough into three zones. The residential rates are £443.52/m² (Western zone); £276.16/m² (Central zone); £60.24/m² (Eastern zone) A plot in the western zone and one in the eastern zone are therefore not comparable on cost, whatever their size.

    Mayoral CIL is added to the borough charge. Haringey is in band 2, at £72.73 per square metre this year. The planning fee is £610 per dwelling for up to nine homes.

    We settle the zone first and show the levy beside each massing option in the quote conversation. That way a client can see, before drawings are produced, whether a larger house or two smaller ones is the better use of the plot.

    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline

    Local figures for Haringey

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Borough CIL residential rate£443.52/m² (Western zone); £276.16/m² (Central zone); £60.24/m² (Eastern zone)2026 indexed rate; schedule rates £368.12 / £229.21 / £50 (2022 schedule, index 332 to 400)haringey.gov.uk
    Mayoral CIL charging band2 MCIL2 charging band (1-3)—london.gov.uk
    Mayoral CIL rate (indexed)72.73 £/m² (indexed, permissions granted in 2026)—london.gov.uk
    Conservation areas33 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions25 Article 4 directions published by the council—planning.data.gov.uk
    Listed building entries289 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Heritage at Risk entries21 Heritage at Risk Register entries within the LPA boundary (Historic England)—planning.data.gov.uk
    Minor application decisions617 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications granted82.2 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications decided in time89.5 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Green Belt share of the council area2 % of council area covered by green-belt polygons—planning.data.gov.uk
    Erection of dwellinghouses, not more than 10: per dwellinghouse, from 1 Apr 2026610 GBP per dwelling—ribblevalley.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Haringey
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Policy, from the earlier strategy to the Tottenham plan

    Haringey's development plan is the Haringey Local Plan: Strategic Policies 2013-2026 (consolidated with 2017 alterations), with the Development Management DPD, Site Allocations DPD and Tottenham Area Action Plan. It is a patchwork of documents adopted at different dates, so the policy that governs your plot depends on where it is. The Tottenham area has its own action plan, and a site there is read against it first.

    The council also publishes House extensions in South Tottenham SPD (revised), a guide written for one part of the borough. Where a new house fills a gap in a street of a fixed pattern, we draw it to follow the established form.

    We list the relevant policies in the design note that goes with the drawings, after reading the plan against your address and not in the abstract.

    Heritage designations in a borough of terraces

    The borough has 33 conservation areas and 25 Article 4 directions, with 289 listed building entries and 21 entries on the Heritage at Risk register. Of all households, 38.9 per cent live in a house, and 37.2 per cent own, so rented flats and conversions fill much of the stock.

    That mix means a new house often sits beside a converted terrace. We draw the neighbour's flank windows, rooflights and rear additions as surveyed, because overlooking and loss of light are measured against what is actually there. Our measured building survey provides that evidence.

    What the minor-scheme figures show

    Haringey decided 617 minor applications in the latest return, granting 82.2 per cent and deciding 89.5 per cent within eight weeks or an agreed extension. The statutory period for a non-major scheme is 8 weeks.

    Those are past figures for every kind of minor case, extensions and changes of use included. They describe the council's workload and not your plot's prospects. Green belt is only a small fringe of the borough, at 2 per cent, so most sites are judged on character and amenity.

    Our planning drawings in Haringey page explains how the submission is prepared, and the building regulations drawings in Haringey follow after consent.

    Levy, scale and the number of homes

    Haringey's zoned levy makes the number of homes a decision, not a given. One larger house in the western zone and two smaller ones in the eastern zone can end up with very different costs per home, and the right answer also depends on the space standard and on what the street can take. The national minimums are Minimum GIA: 1b1p 39 m² (37 m² with shower), 1b2p 50 m², 2b3p 61 m², 2b4p 70 m² (one-storey dwellings); 3b4p 74 m², 3b5p 86 m², so there is a floor under every option we draw.

    If your scheme grows beyond a handful of houses, the size rules change: Major development: 10 or more dwellings, or a site of 0.5 ha or more where the number is unknown. A major application brings a longer statutory period of 13 weeks and usually more reports. We tell you when a design crosses the line and, where a small reduction keeps it below, we say what that would cost in floor area.

    Self-builders have a different position on the levy: Self-build housing built or commissioned by and occupied by P as main residence can claim exemption. We do not give tax advice, but we flag the question at the first call so you can ask the council before relying on it.

    Whatever the number of homes, the process is the same: constraints and levy check, fixed quote, survey, options in the model, your written choice, then the full set. The difference is how much weight each option carries when you compare them, and our schedule of areas and levy lines is built for that comparison.

    Working with us

    We run constraints and levy checks, send a fixed quote, survey the plot, and test options in our Revit model before you choose one in writing. If the council asks for changes, we redraw free until approval. We do not promise what the council will decide.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Red-brick mansion blocks and shopfronts on a street corner
    Points, not guesses
    Paint across the grid with the pointer.

    Questions

    How much CIL does a new Haringey house pay?

    The borough rates are £443.52/m² (Western zone); £276.16/m² (Central zone); £60.24/m² (Eastern zone) Mayoral CIL of £72.73 per square metre applies as well.

    Does Haringey have green belt?

    A small fringe: 2% of the council area. We check your plot against the boundary.

    How many Article 4 directions does Haringey have?

    The council has published 25. We check whether any cover your street.

    How quickly are minor schemes decided?

    89.5% of 617 minor decisions were made in eight weeks or an agreed extension, a past figure and not a promise on timing.

    Sources and dates