Over half of Bromley is Green Belt, so the first job on a plot here is to find out which side of the line it sits. New build drawings in Bromley from £1,450 including VAT follow that check, then the Urban Design Guide, then the numbers, and MCIAT chartered architectural technologists check every sheet.
From £1,450 (VAT included)
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on new build drawings
Seven steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Design options
We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.
Design frozen
You choose an option in writing. Nothing changes after this without your say.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Submission
We prepare the forms, certificates, fee and documents and submit through the Planning Portal.
Officer liaison
We answer the planning officer and make any amendments within five working days, at no charge until approval.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Green Belt and the Bromley new house
51 per cent of Bromley is covered by Green Belt polygons, more than half of the borough. Inside the line, a new dwelling is inappropriate development, and permission depends on a narrow set of exceptions such as limited infilling in a village or the redevelopment of previously developed land. Outside it, the ordinary tests of design, neighbours and trees apply.
That is why we start with the boundary, not the sketch. We overlay the plot on the published polygons, read the history of the site and neighbours, and tell you plainly whether the scheme has a route. If a site fails here, this is the least costly place to stop.
For plots outside the Green Belt, the council's design guidance is the Urban Design Guide SPD, read with the Bromley Local Plan, adopted in 2,019. The guide deals with how a new building sits in its street, and the street scene is the drawing officers look at first.
Where a site sits just outside the line, the neighbouring Green Belt still matters. Officers ask whether a new house harms its openness or views, so the proposed elevations and a few photographs taken from the field side are part of the set. A modest, well-screened house with a clear boundary is a far easier case than a tall one that is seen from the open land.

Local figures for Bromley
| Measure | Value | Period | Source |
|---|---|---|---|
| Green Belt share of the council area | 51 % of council area covered by green-belt polygons | — | planning.data.gov.uk |
| Local plan | Bromley Local Plan | — | bromley.gov.uk |
| Local plan adopted | 2,019 | — | bromley.gov.uk |
| Article 4 directions | 108 Article 4 directions published by the council | — | planning.data.gov.uk |
| Borough CIL residential rate | £120.12/m² (Residential development excluding residential development which delivers additional care and support services) | rate for planning permissions granted in 2026 (permission year index 400, schedule base index 333) | bromley.gov.uk |
| Mayoral CIL rate (indexed) | 72.73 £/m² (indexed, permissions granted in 2026) | — | london.gov.uk |
| Minor applications granted | 70.3 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Minor applications decided in time | 82.8 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder appeals allowed | 37.6 % of householder appeals allowed | decision dates 1 Jul 2021 to 30 Jun 2026 | assets.publishing.service.gov.uk |
| Erection of dwellinghouses, not more than 10: per dwellinghouse, from 1 Apr 2026 | 610 GBP per dwelling | — | ribblevalley.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Building regulations, layer by layer
The Approved Documents that shape most house projects, from structure to the application itself.
- A · Part A: structure
- Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
- B · Part B: fire safety
- All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
- C · Part L: insulation
- New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
- D · Part K: stairs
- 2.0 m clear headroom over stairs
- E · Full plans application
- Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing
Heritage designations in Bromley
Bromley has 47 conservation areas and 412 list entries, and its planning dataset records 108 Article 4 directions. That is a heavy layer for a suburban borough, and a new house beside a designated area has to respect the character the direction protects.
25 entries are on the Heritage at Risk Register. A new house next to one of them is assessed for its effect on the setting.
How slowly or quickly Bromley decides small housing schemes
A new house or small terrace is a minor application, and Bromley decided 545 of them in its latest year. It granted 70.3 per cent and decided 82.8 per cent on time, so a fair share run past their deadline. The legal period is 8 weeks, and an extension of time is common, so we plan for delay in the programme.
The appeals record is a useful counterweight. On householder cases, the Planning Inspectorate decided 502 appeals and allowed 37.6 per cent. Those are extensions and alterations, not new homes, but they show where the council's decisions are tested externally, and we draw each refusal reason as something we can answer in writing.
Levies, fees and house values in Bromley
Community infrastructure levy applies to every new dwelling. Bromley's residential rate in our data is £120.12/m² (Residential development excluding residential development which delivers additional care and support services). The Mayor of London's levy adds £72.73 per square metre for permissions this year, in band 2. Both are charged on gross internal area.
The council's fee is £610 per dwelling for up to nine houses. The average house price in the borough is £511,670, a change of -3.1 per cent in twelve months, across 135,827 households, and gardens cover 23.4 per cent of the land. Plots are generous, and so is the temptation to build on them.
Plots here are often long, with the house near the road and a deep garden behind it. A second house at the back is called backland development, and officers weigh the access, the noise of cars passing the first house and the loss of garden. We draw the access and its width, because a driveway that is too narrow for an emergency vehicle stops a scheme as surely as a policy does.
Price and next steps for new builds in Bromley
New build drawings in Bromley start at £1,450, VAT included, fixed after the free constraints check. We redraw at no charge if the council asks for changes, though we cannot promise a decision.
The application is prepared as planning drawings in Bromley. If an earlier scheme was refused, planning appeals in Bromley explains the route. After permission, construction drawings in Bromley and structural calculations in Bromley take it to site. The borough overview is architectural drawings in Bromley, and for neighbours see new build drawings in Sevenoaks or in Croydon.
What you receive


Related pages
Other services in Bromley
Questions
Can I build a new house in Bromley's Green Belt?
Rarely. 51 per cent of the borough is Green Belt and new dwellings are inappropriate development there unless a narrow exception applies. We check first.
Which design guide applies in Bromley?
The Urban Design Guide SPD, read with the Bromley Local Plan.
How much are new build drawings in Bromley?
From £1,450 including VAT. The council's fee is £610 per dwelling and is separate.
How long does Bromley take to decide?
The legal period is 8 weeks, but the council decided only 82.8 per cent of minor applications in time, so we plan for delay.
Sources and dates
- planning.data.gov.uk, retrieved
- bromley.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- bromley.gov.uk, retrieved
- london.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- ribblevalley.gov.uk, retrieved
- bromley.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- legislation.gov.uk, retrieved
- london.gov.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- data.london.gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.