020 7864 7245Request a fixed quote

Bromley, London

Prior approval drawings in Bromley

Prior approval drawings in Bromley start with the map, because the borough publishes 47 conservation areas and green belt covers 51 per cent of it. Where the route is open, the council still granted only 3 larger home extension notifications against 15 refusals in the latest returns. We are MCIAT chartered architectural technologists, and we check the address before we quote. The council fee is £249.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on prior approval drawings

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Georgian brick terrace with sash windows, arched fanlight doorways, stone steps and iron railings in London

    Prior approval drawings in Bromley and the Urban Design Guide

    Bromley's published design advice for homes is the Urban Design Guide SPD. It is a general guide to the character of the borough rather than a rulebook for extensions, so officers read it alongside the local plan, adopted in 2,019.

    For a prior approval the guide matters less than the neighbour test, but it shapes how an officer reads the surroundings. A deep extension reads differently on a wide plot than on a narrow terrace.

    We study the immediate setting, including nearby extensions that have already been built, because the existing pattern of the street is part of the context.

    Brick cottage with a tiled roof, chimneys and a front dormer window

    Local figures for Bromley

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Larger home extension prior approvals granted3 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Larger home extension prior approvals refused15 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Upward home extension prior approvals refused5 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Conservation areas47 named conservation areas published by the council—planning.data.gov.uk
    Green Belt share of the council area51 % of council area covered by green-belt polygons—planning.data.gov.uk
    Heritage at Risk entries25 Heritage at Risk Register entries within the LPA boundary (Historic England)—planning.data.gov.uk
    Householder applications granted78.6 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder appeals allowed37.6 % of householder appeals alloweddecision dates 1 Jul 2021 to 30 Jun 2026assets.publishing.service.gov.uk
    Households living in a house68.6 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Average price, semi-detached652,925 GBP2026-07publicdata.landregistry.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Bromley
    Which application your project needsLawful Development Certificate decision: 8 weeks. Prior approval decision: 42 days. Householder decision: 8 weeksYour projectWithin permitted development?Lawful Development CertificatePrior approvalHouseholder applicationYesLarger rear extensionNoABC

    Which application your project needs

    The usual route for a house; flats and listed buildings follow other rules.

    A · Lawful Development Certificate decision
    8 weeks
    B · Prior approval decision
    42 days
    C · Householder decision
    8 weeks

    Bromley's decisions on larger and upward extensions

    In the period shown, Bromley granted 3 larger home extension prior approvals and refused 15. The refusals dominate, though the volume is small enough that individual cases carry weight.

    Upward extensions were harder still. The returns record 0 granted and 5 refused, so an additional storey under Class AA has not found favour here. We do not recommend that route without a very clear case.

    Ordinary householder applications behave differently. The council decided 1,609 of them in the latest twelve months and granted 78.6 per cent, with 89.1 per cent decided in time. The Planning Inspectorate allowed 37.6 per cent of the 502 householder appeals it decided over five years, which shows an appeal is a realistic last step when a refusal looks wrong.

    Designations that can close the route in Bromley

    The larger extension route excludes every one of Bromley's conservation areas, so we check each address against the council's boundary layer.

    Heritage matters elsewhere too. Historic England's register lists 25 entries at risk within the borough and 6 registered parks and gardens, which we note in case a fallback application is needed.

    Green belt, at 51 per cent of the council area, does not by itself remove the route, but it affects what a householder application can achieve if you need to fall back on one.

    Our constraints check reads the conservation area boundary for the plot itself, not just the road name, because a boundary can run along the back of a garden. If the line falls across your land, we tell you which part of the house it covers and what that means for the notification before you commit to drawings.

    Houses, gardens and values in Bromley

    About 68.6 per cent of households live in a house or bungalow, and domestic gardens cover 23.4 per cent of the land, so the larger extension route is relevant to many owners. A semi-detached house averages £652,925 and a terraced one £483,699.

    The depth limits are 6 m (attached) / 8 m (detached), single storey, height max 4 m; not on article 2(3) land or an SSSI. We measure from the original rear wall, record neighbours' windows and prepare the written description and site plan the Order requires. Then the LPA notifies adjoining owners/occupiers, giving at least 21 days for representations, and the development may begin if no decision is notified within 42 days.

    Because the record is stern, we recommend written confirmation of the decision, and someone who did not draw it reads every set before it goes to the council.

    Wide plots, long gardens and neighbour impact

    Where a plot is wide enough that an extension sits well clear of the neighbour's window, the neighbour test is simpler to answer, and that is where the route is most worth using.

    Even then, we record the position of any detached garage, outbuilding or tree that affects what can be built, and we show the setback from each boundary. Showing how much garden is kept helps the officer judge the scheme.

    When to choose another route in Bromley

    If the extension fits ordinary permitted development, a Lawful Development Certificate in Bromley is cleaner. If the address is in a conservation area, or the scheme needs more than the Order allows, our planning drawings in Bromley take it through a householder application.

    The architectural drawings in Bromley page lists everything else we do locally, and you can also read prior approval drawings in Croydon and prior approval drawings in Bexley for comparison.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline
    The street around you
    Move across the plinth — the blocks rise around the pointer.

    Questions

    Does green belt stop prior approval in Bromley?

    Not automatically, though it limits what a later householder application can do. Green belt covers 51 per cent of the borough, and we check the address.

    Can I add a storey in Bromley?

    The returns show 5 upward extension refusals and 0 grants in the period, so we advise caution and a full constraints check first.

    How many conservation areas are there?

    The council publishes 47, and the larger extension route excludes them all.

    What is the council fee?

    £249, paid to the council. Our fee is fixed after the free check.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.