020 7864 7245Request a fixed quote

Greenwich, London

New build drawings in Greenwich

A new house in the Royal Borough of Greenwich can sit within sight of a World Heritage Site, and the borough's own levy is set per square metre of what you build. We prepare new build drawings for Greenwich plots from £1,450 including VAT, each set checked by a second chartered technologist.

From £1,450 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on new build drawings

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline

    The borough levy, in numbers

    Greenwich's levy is the best place to start, because it is simple to read. The Royal Borough of Greenwich CIL Charging Schedule 2024 (Borough CIL 2) charges residential development as follows: £157.48/m² (residential under 10 units, borough-wide); £157.48/m² (10+ units, Zone 1); £100.79/m² (10+ units, Zone 2) A single new house of modest size therefore carries a borough charge fixed by area, and the zones matter only for larger schemes.

    On top of that sits the Mayoral CIL. Greenwich is in band 3, and the current indexed rate is £30.3 per square metre. The council application fee is separate, at £610 per dwelling for up to nine homes.

    We put all three lines into the quote conversation. Our area schedule lists gross internal area dwelling by dwelling, so you can work out the charges on any option before you pick one.

    Red-brick mansion blocks and shopfronts on a street corner

    Local figures for Greenwich

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Borough CIL residential rate£157.48/m² (residential under 10 units, borough-wide); £157.48/m² (10+ units, Zone 1); £100.79/m² (10+ units, Zone 2)2026 indexed rate (1 Jan–31 Dec 2026); schedule rates £150 / £150 / £96 (2024)royalgreenwich.gov.uk
    Mayoral CIL charging band3 MCIL2 charging band (1-3)—london.gov.uk
    Mayoral CIL rate (indexed)30.3 £/m² (indexed, permissions granted in 2026)—london.gov.uk
    worldHeritageSites1 World Heritage Sites intersecting the LPA boundary—planning.data.gov.uk
    Listed building entries540 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Conservation areas23 named conservation areas published by the council—planning.data.gov.uk
    Minor application decisions396 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications granted79.3 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications decided in time92.7 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Green Belt share of the council area0 % of council area covered by green-belt polygons—planning.data.gov.uk
    Erection of dwellinghouses, not more than 10: per dwellinghouse, from 1 Apr 2026610 GBP per dwelling—ribblevalley.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Greenwich
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    A World Heritage setting and a long list of listed buildings

    Greenwich has 1 World Heritage Site intersecting its boundary, together with 540 listed building entries and 23 conservation areas. Even a plot some distance from the Maritime Greenwich core can fall in views the council protects, and a new roofline that is fine in one street can be challenged in another.

    That is why we draw sections and street elevations to a known datum, taken from our measured building survey work, and show the new ridge against its neighbours. The council's Royal Greenwich Local Plan: Core Strategy with Detailed Policies, adopted in 2,014, is the policy document an officer will cite.

    The borough also has 22 entries on the Heritage at Risk register, so a derelict or neglected neighbour can be a planning consideration in itself.

    How Greenwich has treated small schemes

    Greenwich decided 396 minor applications in the latest return. It granted 79.3 per cent and decided 92.7 per cent within eight weeks or an agreed extension, the statutory period being 8 weeks.

    Those figures cover every minor case, so they include extensions and changes of use as well as new dwellings. They show a council that decides on time and grants most small schemes, but they do not predict how it will view your plot, and we never present them as a promise.

    No part of the borough is green belt, with a share of 0 per cent, so there is no belt test. The constraint instead is the character of the street and the amenity of neighbours. Only 48.4 per cent of households live in a house, which means many sites are in streets of flats or mixed terraces where a new house must be justified against its surroundings.

    The standards every new Greenwich home must meet

    The nationally described space standard sets minimum floor areas by bedroom count: Minimum GIA: 1b1p 39 m² (37 m² with shower), 1b2p 50 m², 2b3p 61 m², 2b4p 70 m² (one-storey dwellings); 3b4p 74 m², 3b5p 86 m². London adds its own accessibility rule: At least 10% M4(3) wheelchair user dwellings; all others M4(2).

    Building regulations then take over. Our building regulations drawings in Greenwich carry the approved design into construction sheets, and the planning drawings in Greenwich page covers the application stage.

    Drawing a new house against a protected skyline

    Where a site lies near the river or the park, the council looks at the skyline as well as the street. A roof that is a little taller than its neighbours may be unremarkable in an ordinary suburb and a problem here, so we measure rather than estimate. Heights are taken from survey data, and the proposed ridge is drawn on an elevation of the whole terrace, not only on a section of the plot.

    We also keep the roof simple. Plain pitched or flat roofs with modest parapets are easier to defend than complicated forms, and they make the structural engineer's task cheaper later. If the neighbouring houses share a material, a brick colour or a window proportion, we record it on the elevation and say how the new house follows it.

    For a house that will be visible from public land, a verified view from the nearest viewpoint helps, and our 3D model can produce one. The council does not always ask for it, but where a heritage consultee comments, a clear image answers the comment faster than a paragraph.

    Because water and drainage can also shape the plot, we mark the position of the nearest sewer on the site plan if the title or survey shows one, so building over or beside it is dealt with before design is fixed.

    What you get from us

    A fixed quote after our constraints check, a Revit model of your plot, two or three options with their areas, and a full submission set. If the council asks for amendments, we redraw free of charge until approval.

    We cannot say what the council will decide. What we can say is that the set will have been drawn by one technologist and checked by another.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Points, not guesses
    Paint across the grid with the pointer.

    Questions

    What is the Greenwich CIL rate for a new house?

    £157.48/m² (residential under 10 units, borough-wide); £157.48/m² (10+ units, Zone 1); £100.79/m² (10+ units, Zone 2) The Mayoral charge is £30.3 per square metre in band 3 this year.

    Does the World Heritage Site affect a new house in Greenwich?

    It can, through protected views and the setting of listed buildings. The borough holds 1 World Heritage Site and 540 listed entries, so we check sightlines early.

    Is Greenwich green belt?

    The green belt share of the council area is 0%, so no green belt test applies to a plot here.

    How long will a Greenwich decision take?

    The statutory period is 8 weeks for a non-major scheme. Greenwich decided 92.7% of minor cases in that period or an agreed extension, a past figure that is not a promise.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.