020 7864 7245Request a fixed quote

Tower Hamlets, London

Garden room drawings in Tower Hamlets

A garden room in Tower Hamlets often has to fit a yard rather than a lawn, and the borough's designations decide whether permission is needed. Our garden room drawings in Tower Hamlets start at £495 including VAT, drawn by MCIAT chartered architectural technologists and checked by a second person.

From £495 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on garden room drawings

    Nine steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    8. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    9. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Brick house being extended, with a wide new opening supported over the ground floor

    Designations that decide a Tower Hamlets garden room

    Start with the map, not the design. The council publishes 59 conservation areas and 64 Article 4 directions, which is a lot of special land for one borough. Historic England adds 916 list entries inside the boundary, so some gardens belong to a listed house.

    Each designation bites on outbuildings in a different way. Garden buildings within the curtilage of a listed building are not permitted development at all: Garden buildings within the curtilage of a listed building are not permitted development. In a conservation area the side-of-house rule applies: On article 2(3) land, no outbuilding between a side wall and the boundary. An Article 4 direction can remove other freedoms, so we read the wording of the direction that covers your street rather than assuming it matches the one next door.

    Trees are the other early check. The council lists 72 tree preservation orders, and a protected tree at the end of a yard can fix where a building may stand, because roots and shade both matter to the officer.

    Our constraints check covers all of this before we quote, so you know before you pay for design whether a lawful development certificate or a householder application is the route.

    Finished white-rendered rear house extension with large glazed doors

    Local figures for Tower Hamlets

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas59 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions64 Article 4 directions published by the council—planning.data.gov.uk
    Listed building entries916 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Tree preservation orders72 tree preservation orders published by the council—planning.data.gov.uk
    Domestic gardens share of land (GLUD 2005)7.4 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk
    Households living in a house12 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Householder applications granted92.7 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time95.8 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Class E, para E.1(b)Buildings may not cover more than 50% of the curtilage (excluding the original house)—legislation.gov.uk
    Class E, para E.1(g)Garden buildings within the curtilage of a listed building are not permitted development—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Tower Hamlets
    Single-storey rear extension: the permitted development limitsDepth beyond the original rear wall: 3 m (attached) / 4 m (detached) beyond the original rear wall, single storey. Maximum height: 4 m. Within the zone near the boundary: Eaves no higher than 3 m where within 2 m of the curtilage boundary. Larger extension under prior approval: 6 m (attached) / 8 m (detached), single storey, height max 4 m; not on article 2(3) land or an SSSIABCD

    Single-storey rear extension: the permitted development limits

    The house in section with a rear extension; the dashed lines mark the zone near the boundary.

    A · Depth beyond the original rear wall
    3 m (attached) / 4 m (detached) beyond the original rear wall, single storey
    B · Maximum height
    4 m
    C · Within the zone near the boundary
    Eaves no higher than 3 m where within 2 m of the curtilage boundary
    D · Larger extension under prior approval
    6 m (attached) / 8 m (detached), single storey, height max 4 m; not on article 2(3) land or an SSSI

    Small plots and the share of land that is garden

    Gardens are scarce here. Only 7.4 per cent of the borough's land was domestic garden in the national land-use survey, and just 12 per cent of households live in a house or bungalow. Most garden rooms are therefore planned for a narrow terraced yard or a shared communal space, and the drawings are fiddly in a way that a suburban plot is not.

    In a small yard the coverage cap arrives quickly. The order's wording is Buildings may not cover more than 50% of the curtilage (excluding the original house). Once a bin store, a bike shed and a patio are counted, a modest studio can use up the allowance. We measure every existing structure on the survey and total the footprint on the site plan, so the figure is checked on paper before anyone orders a kit.

    Height is the second squeeze. The national rule reads Max 2.5 m if within 2 m of a boundary; otherwise 4 m dual-pitched roof or 3 m any other roof, and the eaves limit is 2.5 m. On a yard only a few metres wide almost every wall is near a boundary, so the lower height applies and the roof has to be designed around it, often as a flat or low mono-pitch section.

    Planning route and how Tower Hamlets decides

    When a garden room meets every limit, we advise a lawful development certificate so you hold written proof for a buyer or lender. When it does not, the route is a householder application built on our planning drawings in Tower Hamlets.

    The borough decided 191 householder applications in its latest published year, granted 92.7 per cent and decided 95.8 per cent in time. Those are borough-wide figures about extensions of every kind, not a forecast for your yard, but they show that well-drawn householder schemes are routinely dealt with on schedule.

    If the fee applies, the national figure is £272 for works within the boundary of an existing dwelling, paid to the council and separate from our fee.

    Building Regulations for a Tower Hamlets outbuilding

    Planning and Building Regulations are separate tests. One exemption applies where Detached building up to 15 m² with no sleeping accommodation is exempt. The wider one is Detached single-storey building up to 30 m², no sleeping accommodation, at least 1 m from the boundary or substantially non-combustible, is exempt.

    The phrase that catches people is no sleeping accommodation. A studio with a sofa bed used for guests loses the exemption. Where it applies we add the foundation, insulation and electrical notes through our building regulations drawings service.

    Planning a garden room on a narrow yard

    Most Tower Hamlets yards are not rectangles of lawn. They are slim strips behind a terrace, or shared courts behind a block, and the building has to be drawn to the centimetre. We start with a measured survey that records boundary walls, drain covers, neighbouring windows and any tree canopy, because every one of them shifts where a building can go and how it can be built.

    Access is the practical problem that catches owners out. A kit or a delivered pod has to come through the house, down a side passage or over a wall, and a tight route can rule out a one-piece unit or force a site-built frame. We note the delivery route on the plan and suggest a construction method to suit it, so the builder does not discover the passage is too narrow on the day.

    Overlooking is the neighbour issue. A window in a garden room that faces a bedroom window across a narrow yard is the kind of detail that draws an objection, so we place glazing deliberately, often with a high-level or north-facing opening, and show the sightlines on the elevation.

    There is also the question of what happens after you build. A building that is lawful today but changes use later, for example into a rented studio, needs fresh thought. Keep the room as an office, gym or hobby space and the drawings and certificate stay valid for the life of the ownership.

    What we draw and what it costs

    The set has a site plan, floor plan, elevations, a roof and floor section and a materials note, produced from a measured survey of the yard and modelled in 3D first so you can see the roof against the fence line. Garden room drawings start at £495, VAT included, fixed before you commit.

    If the council asks for changes we redraw at no charge until approval; we never promise a decision. For a full list of what we do in the borough see architectural drawings in Tower Hamlets, or compare how garden room drawings in Barking and Dagenham differ in a lower-density borough.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Two-storey rear extension under construction on a semi-detached house
    Every side considered
    Flick across the turntable to spin it.

    Questions

    Does a garden room in a Tower Hamlets conservation area need planning permission?

    Often not if it sits at the rear, but a conservation area bars outbuildings between a side wall and the boundary, and an Article 4 direction may remove more. We check the direction for your street first.

    Can I build a garden room in a communal garden in Tower Hamlets?

    Permitted development rights belong to a house, not a flat, so a flat owner usually needs a planning application and the freeholder's consent.

    How much do garden room drawings cost in Tower Hamlets?

    From £495 including VAT, fixed up front. Any council fee is paid separately.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.