020 7864 7245Request a fixed quote

Hillingdon, London

Construction drawings in Hillingdon

Construction drawings in Hillingdon are the dimensioned, specified set your builder prices from, drawn for a borough with 731 tree preservation orders, 150 Article 4 directions and a green belt covering 42 per cent of the land. We are chartered architectural technologists. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on construction drawings

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Pencil resting on a dimensioned technical drawing beside a scale rule

    Trees, roots and foundations in Hillingdon

    The council publishes 731 tree preservation orders, and that figure is the most useful one for anyone planning an extension here. A protected oak or a mature street tree changes the foundation, not just the layout. Where soil shrinks and swells around roots, a standard strip footing can be wrong, and the depth needed near a tree can be well beyond a typical trench.

    A construction set records what the design assumes. Foundation depth, any piled or trench-fill option, the root protection area and the location of any heave protection are drawn on the structural sheets, with the tree survey reference. When building control asks why the footing is deeper than usual, the answer is already on the page.

    We read the council's tree map before design begins and mark every protected tree within reach of the site. If one stands within the zone of influence, the structural engineer is told at the start, not after an excavation has exposed the roots.

    Drains deserve the same attention. A tree-root-damaged or shared drain can sit exactly where a new foundation wants to go, so the set shows the line, depth and condition we found on survey and states how the structure crosses or avoids it. Building over or near a public sewer may need the water company's consent, and we raise that with you before the design is frozen.

    Steel beams supporting exposed timber floor joists on temporary props during a house renovation

    Local figures for Hillingdon

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Tree preservation orders731 tree preservation orders published by the council—planning.data.gov.uk
    Conservation areas33 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions150 Article 4 directions published by the council—planning.data.gov.uk
    Listed building entries436 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Heritage at Risk entries45 Heritage at Risk Register entries within the LPA boundary (Historic England)—planning.data.gov.uk
    Green Belt share of the council area42 % of council area covered by green-belt polygons—planning.data.gov.uk
    Householder decisions1,147 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted90.2 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time94.3 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Lawful development certificate applications (PS1)529 certificates2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Approved Document L Vol 1 2021 incl. 2023 amendments, Table 4.2New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4—gov.uk
    AD 7 (regulation 7)Approved Document 7: Materials and workmanship, 2013 edition incorporating 2018 amendments—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Hillingdon
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Article 4, conservation and heritage in Hillingdon

    Hillingdon publishes 33 conservation areas and 150 Article 4 directions. Historic England lists 436 entries, and 45 appear on the Heritage at Risk register.

    An Article 4 direction takes away permitted development rights for specific works in a defined area, so what would be permitted elsewhere needs an application here. The plan is therefore set in a clear order. We confirm the planning route, secure the decision, and then issue construction drawings that follow the approved scheme.

    Converting a house into several lets brings its own planning question, which we check against the council's directions, and it needs a technical set that deals with fire separation and sound.

    We read each direction against your own boundary. Some cover a street frontage, some a whole estate, and some only particular alterations such as front porches or roof changes, so the answer for a given house is rarely obvious from the borough figure alone.

    Green belt, large plots and the local plan

    Green belt covers 42 per cent of the borough, and houses within it face stricter rules on the size of additions, judged against the original building. Hillingdon's plan is the Hillingdon Local Plan Part 1: Strategic Policies, with Local Plan Part 2: Development Management Policies and Site Allocations and Designations (January 2020), and the council's Part 2 document sets out the development management policies applied to householder schemes.

    Because additions in the green belt are measured against volume, the technical set has to be exact. We state the floor area and volume of the proposed work on the sheets, along with the existing figure, so that no site decision pushes the scheme beyond what the council approved.

    Large plots also bring outbuildings. A garden room, studio or gym near the boundary has its own fire-distance rules, its own electrical supply and often its own drainage, and our drawings cover them in the same set as the house extension.

    Flat-roofed side extensions, common on interwar semis, need particular care at the junction with the original roof. We show the lead flashing, the upstand and the insulation falls in section, because a leak at that junction is hard to trace once the ceiling is finished.

    Volume of work and timing in Hillingdon

    Hillingdon decided 1,147 householder applications in its latest year, and granted 90.2 per cent. Householder decisions made on time or within an agreed extension were 94.3 per cent.

    The council also issued 529 lawful development certificates in the data period, and decided 29 larger-extension prior approvals in favour against 13 refused. Prior approval is clearly a working route here, as it can be much faster than a householder application when neighbours do not object.

    68.9 per cent of households live in a house or bungalow and 56.6 per cent own their home, so the typical client is a family planning to stay and invest. We draw sets that last, with thermal specifications that reach the limits in the table and details that will not need reworking.

    Hillingdon's mix of suburban estates and village edges means the same service reads differently from one address to the next. A detached house with a long drive needs a vehicle-access note for the builder, and a semi with a shared side passage needs a party-wall and access discussion before scaffolding goes up.

    What the set includes and where to go next

    The set includes structural plans, foundation details, junction sections, window and door schedules, drainage, ventilation and a specification against Approved Document L. Our structural calculations feed the beams and footings, and a second technologist reads each sheet before it is issued. We revise the drawings free of charge if the council or an inspector asks.

    The borough overview is at architectural drawings in Hillingdon, and the approval stage is at building regulations drawings in Hillingdon. We also draw in Three Rivers, Ealing and Hounslow, and explain the service at construction drawings in London.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Brick house being extended, with a wide new opening supported over the ground floor
    Every layer specified
    Move across to open the layers; move down to pick one.

    Questions

    Do tree preservation orders affect construction drawings in Hillingdon?

    Yes. The council publishes 731 orders, and a protected tree near an extension changes the foundation design and the drawings that describe it.

    Can I convert a Hillingdon house into several lets?

    Possibly. We check the planning position against the council's directions first, and the technical set must cover fire separation and sound insulation.

    How much of Hillingdon is green belt?

    42 per cent of the borough, according to the planning data we use, so additions are judged against the original building.

    What do Hillingdon construction drawings cost?

    Fixed quote after a free constraints check, based on the size of the work and the amount of structure.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.