020 7864 7245Request a fixed quote

Hillingdon, London

SAP calculations in Hillingdon

Hillingdon is a large, varied borough, with 436 listed entries, 33 conservation areas and a Green Belt share of 42 per cent, so a SAP calculation here can mean a village cottage or a new suburban house. We coordinate it with an assessor from your drawings for a fixed quote after a free constraints check, VAT included.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on sap calculations

    Five steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    4. Building regulations

      Technical drawings are coordinated with the structural engineer's calculations, the drainage and the planning conditions.

    5. Approval and hand-over

      Building control approval, then a next-steps pack covering the commencement notice, party wall timing and CIL.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Red-brick English house with rows of solar panels on its tiled roof

    SAP calculations in Hillingdon from village core to suburb

    The borough mixes suburbs, old village centres and open land. Hillingdon publishes no energy rule for householders, so the work depends on what you own: an interwar semi, a listed cottage or a plot at the Green Belt edge.

    With 42 per cent of its area in Green Belt polygons, size limits from planning often arrive before the energy question does. We fix the approved floor area first and model from that.

    House extension under construction with scaffolding, new glazed doors and building materials

    Local figures for Hillingdon

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Listed building entries436 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Conservation areas33 named conservation areas published by the council—planning.data.gov.uk
    Grade II* listed entries29 list entries—planning.data.gov.uk
    Heritage at Risk entries45 Heritage at Risk Register entries within the LPA boundary (Historic England)—planning.data.gov.uk
    Green Belt share of the council area42 % of council area covered by green-belt polygons—planning.data.gov.uk
    Householder decisions1,147 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted90.2 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Average price, detached941,938 GBP2026-07publicdata.landregistry.gov.uk
    Approved Document L Vol 1 2021 incl. 2023 amendments, Table 4.2New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Hillingdon
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Hillingdon's heritage is large and spread out

    Historic England lists 436 entries here, 29 of them Grade II*, and the Heritage at Risk Register carries 45 entries. Registered parks and gardens number 2, and 5 scheduled monuments sit in the borough.

    Some older listed buildings have solid walls, where cavity insulation is impossible and external insulation may not be acceptable. Approved Document L treats such buildings as special cases, where the aim is improvement as far as is reasonably practicable, so we agree with building control which measures are sensible and record them in the notes.

    A busy planning desk

    Hillingdon decided 1,147 householder applications in the latest twelve months and granted 90.2 per cent, with 94.3 per cent decided in time.

    A materials condition on a roof or window can alter the energy inputs after the decision. We read the decision notice before finalising the calculation, so the figures describe the building as consented.

    Housing stock and budgets

    Around 68.9 per cent of households live in a house and 56.6 per cent are owner-occupiers. A terraced house averaged £457,686 and a detached one £941,938 in the latest Land Registry data.

    At terraced prices the simple route is the usual answer. For detached houses and conversions, a fuller model lets the designer keep large openings without losing compliance.

    What an extension must achieve

    New elements are held to: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Glazing is separately limited: Windows, roof windows, rooflights and doors in an extension should not exceed 25% of the extension floor area plus the area of openings removed or covered.

    A conservatory-style room or a glazed link to a barn conversion is where the cap bites, and the guidance responds: Alternative routes: area-weighted U-value (para 10.9) or a SAP calculation against a notional extension (para 10.10).

    For loft work, our loft conversion drawings in Hillingdon count roof windows into the same glazing total.

    Hillingdon projects that need extra care

    Some Hillingdon jobs sit between planning categories. A barn conversion, an annexe or a garden building used as a home can all be treated as a dwelling for energy purposes, even when planning calls them something else. We check how the building control team classes it before running any model.

    The same applies to a change of use. Turning an outbuilding into living space brings the full set of energy standards, and the existing fabric may fall well short. Knowing that early lets you budget for insulation that was not in the original idea.

    Tell us the use you intend and the state of the existing walls and roof, and we confirm which standard applies and what it will take to meet it.

    Because Hillingdon projects vary so much, we also ask at the start how the heating will be controlled across the old and new parts, since a shared system changes what the assessor models.

    New dwellings, barn conversions and the rest of the package

    A new home or a conversion to residential use is assessed as a dwelling. For new dwellings AD L 2026 names two methods: the Home Energy Model (HEM) and SAP; validity dates are in the Notice of Approval. On completion: An energy performance certificate is required on construction of a new dwelling.

    Read architectural drawings in Hillingdon for the planning context and building regulations drawings in Hillingdon for the technical set. Structural work follows in structural calculations in Hillingdon.

    The energy work is a fixed quote after a free constraints check, VAT included. Send the address and the brief.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    Energy in
    Move the pointer up — the plug rises toward the socket.

    Questions

    Do listed buildings in Hillingdon need SAP?

    They may need an energy assessment, but the standard fix can be relaxed. Hillingdon has 436 listed entries, and the guidance asks for improvement as far as is reasonably practicable where the change would harm the building.

    Can planning conditions change the result?

    Yes. A condition on materials can change the build-up, so we check the decision notice before the figures are final.

    Is the Green Belt relevant to energy rules?

    Only through size. About 42 per cent of Hillingdon is Green Belt, and planning limits the floor area the assessor uses.

    What does it cost?

    Fixed quote after a free constraints check, VAT included.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.