Ealing, London
Basement impact assessment in Ealing
Ealing publishes no basement supplementary document with depth or garden limits that we can cite, so a basement impact assessment here follows the London Plan and the validation process rather than a borough formula. We are chartered architectural technologists and we read your address first, then give a fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on basement impact assessments
Seven steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Design options
We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.
Design frozen
You choose an option in writing. Nothing changes after this without your say.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Submission
We prepare the forms, certificates, fee and documents and submit through the Planning Portal.
Officer liaison
We answer the planning officer and make any amendments within five working days, at no charge until approval.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
How Ealing treats a basement impact assessment
Be wary of any firm that quotes you a standard Ealing basement report before looking at the site. Our research found no Ealing policy that lays down a maximum depth, a garden percentage or a soil-cover figure for basements, and no council wording we could quote as a firm trigger for the assessment. That is a finding about published documents, not a promise that the council will never ask.
What the council does have is the London Plan's basement policy, which asks boroughs to deal with the harm large basements can do under existing buildings, and its own planning policies and validation list. The planning officer decides case by case whether the information supplied shows the house, the neighbours and the drainage will be unaffected. If the application is thin on ground and water evidence, the usual result is a request for more information, and the clock stops while you commission it.
That is why we start with a call to the council's duty officer where it helps, and with the site's own constraints. We look at the depth you want, the closeness of adjoining buildings and the conservation setting, then decide whether to scope a full assessment or a shorter structural and drainage statement. You see that scope in the quote before you spend anything on boreholes.

Local figures for Ealing
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 31 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 309 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Heritage at Risk entries | 18 Heritage at Risk Register entries within the LPA boundary (Historic England) | — | planning.data.gov.uk |
| Households living in a house | 50.3 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Domestic gardens share of land (GLUD 2005) | 25.6 % of land that is domestic garden (GLUD 2005) | 2005 | data.london.gov.uk |
| Householder applications granted | 87.2 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Approved Document C (2004 ed. incl. 2010/2013) para 3.2: where the water table can rise to within 0.25 m of the lowest floor, drain by gravity or other effective means; para 3.4 groundwater stability; basement walls under groundwater pressure covered in the walls section | 0.25 m | — | gov.uk |
| Party Wall etc. Act 1996 s6(1): excavation within 3 m horizontally of an adjoining owner's building or structure and deeper than the bottom of its foundations | 3 m | — | legislation.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Which application your project needs
The usual route for a house; flats and listed buildings follow other rules.
- A · Lawful Development Certificate decision
- 8 weeks
- B · Prior approval decision
- 42 days
- C · Householder decision
- 8 weeks
The borough's heritage and housing context
Ealing names 31 conservation areas and holds 309 listed building entries, with 18 entries on the Heritage at Risk Register. Those figures matter more to a basement than to most extensions. A new lightwell or a lowered front garden changes a street frontage that conservation officers read closely, and a basement beside a listed house raises questions about movement in old foundations.
Only about 50.3 per cent of Ealing households live in a house or bungalow, so basement schemes concentrate on the terraced and semi-detached streets where the houses are. Owner-occupation stands at 46.2 per cent, and the garden share of land in the borough is 25.6 per cent, enough to make rear digging possible but not unlimited.
The council decided 946 householder applications in the latest year and granted 87.2 per cent of them, in time for 95.3 per cent. Those are general householder figures, not basement figures, but they show a council that decides most home projects on time.
A sensible sequence for an Ealing basement
Start with the constraints, not the report. We check the conservation status of the street, the listed neighbours and any Article 4 direction, then walk the plot to see how close the adjoining buildings and the nearest trees stand. That visit settles the realistic depth and whether the lightwell can sit at the rear instead of the front.
Next comes the structural and ground work, then the drawings, then the written assessment. The council reads one pack, so the written findings must quote the same floor levels as the section. Where the officer asks for more evidence after submission, the clock stops until we reply, so a complete first pack is the quickest route through the process.
What the assessment checks and who writes it
An assessment shows that digging down will not harm structural stability, groundwater flow or surface water drainage. A ground investigation firm drills and reports, and a structural engineer designs the retaining walls and slab. We assemble and coordinate: the plans, sections and site plan the report relies on, the questions raised by the heritage setting and the match between figures in each document.
Building Regulations run alongside. Approved Document C asks for a drained floor where the water table can rise to within 0.25 metres of it, and Approved Document A requires that ground movement does not impair stability. Our structural calculations page shows where the engineer's role fits.
Party walls, planning and costs in Ealing
Under the Party Wall etc. Act 1996 a notice is needed for excavation within 3 metres of a neighbour's building that goes deeper than its foundations. Serve it at least 1 month before work starts. Our party wall notices service prepares the plans and sections the notice needs.
Most basements need planning permission, with the assessment in the pack. For what the borough publishes about heritage, housing and decisions, see architectural drawings in Ealing. A scheme close to the boundary may fall under Hounslow or Brent instead, and we check which borough decides.
This is unpriced because the scope depends on the site. After the free constraints check you receive a fixed quote, and we say plainly if Ealing is unlikely to ask for a full assessment.
What you receive


Related pages
Other services in Ealing
Questions
Does Ealing always require a basement impact assessment?
We found no Ealing wording that makes it automatic. The London Plan asks boroughs to control large basements, and the officer decides on the evidence in your application. We check your address before scoping any report.
Does Ealing set a maximum basement depth?
Not in any published basement document we could find. Conservation, trees, neighbours and drainage still limit what is practical, so the design is tested against those instead.
Will a basement in an Ealing conservation area be harder?
It usually draws closer attention to lightwells, front gardens and street appearance. The borough names 31 conservation areas, so we check yours early.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- data.london.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.