Prior approval drawings in Enfield

Prior approval drawings for an Enfield house are the plans, elevations and site plan that go with a larger home extension notification to the council. Enfield decided 35 of these notifications in favour and turned down 27 in the latest year of published returns, so the drawings need to answer the neighbour question before the officer asks it. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on prior approval drawings

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Brick cottage with a tiled roof, chimneys and a front dormer window

    How Enfield has handled larger home extension notifications

    Government returns for the council show 35 larger home extension prior approvals granted and 27 refused in the latest year of government planning returns. That split tells you something practical: in Enfield an extension at the deep end of the permitted range is a real contest, not a formality. Officers read the neighbour's rear windows, the boundary treatment and the ground levels, and they do refuse.

    The same returns record 0 additional-storey notifications granted under Class AA. The route exists nationally, but almost nobody in this borough has used it, so we treat a roof-raising proposal here as a full planning application unless the constraints check shows otherwise. The national limits we test against are: 6 m (attached) / 8 m (detached), single storey, height max 4 m; not on article 2(3) land or an SSSI.

    Under the Order the council has 42 days from receiving a valid notification, and it must give the adjoining owners at least the period the Order sets for comment. Those dates run from a complete submission, which is why the drawing set matters as much as the design.

    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline

    Local figures for Enfield

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Larger home extension prior approvals granted35 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Larger home extension prior approvals refused27 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Upward home extension prior approvals granted0 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Conservation areas24 named conservation areas published by the council—planning.data.gov.uk
    Article 4 direction areas33 Article 4 direction area polygons published by the council—planning.data.gov.uk
    Green Belt share of the council area37 % of council area covered by green-belt polygons—planning.data.gov.uk
    Households living in a house61.2 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Owner-occupied households52.4 % of households owner-occupied (owned outright or with mortgage/loan)Census 2021nomisweb.co.uk
    Average price, semi-detached714,519 GBP2026-07publicdata.landregistry.gov.uk
    Lawful development certificate applications (PS1)636 certificates2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Class A, para A.1(g)6 m (attached) / 8 m (detached), single storey, height max 4 m; not on article 2(3) land or an SSSI—legislation.gov.uk
    Class A, para A.4(10)(c): development may begin if the LPA has not notified a decision within 42 days of receiving the information42 days—legislation.gov.uk
    Prior approval: Larger Home Extensions Part 1 Class A; Additional storeys Part 1 Class AA249 GBP—ribblevalley.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Enfield
    Which application your project needsLawful Development Certificate decision: 8 weeks. Prior approval decision: 42 days. Householder decision: 8 weeksYour projectWithin permitted development?Lawful Development CertificatePrior approvalHouseholder applicationYesLarger rear extensionNoABC

    Which application your project needs

    The usual route for a house; flats and listed buildings follow other rules.

    A · Lawful Development Certificate decision
    8 weeks
    B · Prior approval decision
    42 days
    C · Householder decision
    8 weeks

    Housing stock and why Enfield suits this route

    61.2% of Enfield households live in a house or bungalow, and 52.4% own their home. Those are the two groups for whom a larger home extension is possible at all: the rights belong to houses, not flats or maisonettes. A semi-detached house in the borough averaged £714,519 on the latest Land Registry figures, and a terraced one £496,816, so extra floor area at the back is often worth more than the build and fees combined.

    Where an Enfield semi or terrace has a long rear garden, the larger attached-house allowance is physically achievable. Our survey starts from the original rear wall, because the allowance is measured from the house as first built, and earlier conservatory or lean-to additions are a common reason a client's depth sums are wrong.

    Conservation areas, Article 4 and Green Belt in Enfield

    The council publishes 24 conservation areas and 33 Article 4 direction areas, and 37% of the borough is Green Belt. Designated land such as a conservation area closes the larger home extension route altogether, and an Article 4 direction can remove the underlying permitted development right, so the first job on any Enfield address is to check each layer against the property boundary, not the postcode.

    The Green Belt figure matters in a different way. Prior approval does not apply a Green Belt test, but a refused notification sends you to a householder application, where openness is weighed. If your house sits at the northern edge of the borough, we show you that fallback before you pay for drawings, using our planning drawings service as the reference scope.

    What the notification drawings show

    The Order lists the information a council needs: Written description (depth beyond rear wall, max height, eaves height), site plan, addresses of adjoining premises, developer contact address. We draw that, then add a scaled ground-floor plan, front and rear elevations, a section through the extension and the neighbour's nearest windows, so an officer can see the relationship without a site visit.

    The site plan is the document officers open first. We prepare it to the same standard as our location and block plans, with the original rear wall, the proposed depth and the neighbouring extensions dimensioned. Our drawings are produced by chartered architectural technologists (MCIAT), checked by a second technologist before they go to the council.

    The council fee is £249 and is paid to the council. Our fee is quoted as a fixed sum once the free constraints check is done, and redrawing after a council amendment request is included.

    Neighbours, objections and the Enfield officer's reading

    Enfield's rear gardens are long enough that depth alone rarely decides a case. What decides it is what the extension does to the nearest habitable window next door. We measure the distance from that window to the proposed flank wall, record whether the neighbour already has an extension of their own, and note any difference in ground level across the boundary, because a slope of a few hundred millimetres makes a compliant eaves height look taller from next door.

    A neighbour who objects does not stop the process, but the officer must then weigh the objection against the Order's test. A clear section drawing through the shared boundary answers most objections on paper. When it does not, we can show you a shallower alternative side by side, with the trade-off in plain language, so the decision about depth is yours and made before the notification goes in.

    Timing is the other thing clients ask about. The clock starts when the council holds a valid notification, so incomplete paperwork costs weeks, not days. Our second-technologist check reads the submission against the Order's list before it is sent, and we track the neighbour period and answer any officer query within five working days.

    Prior approval or certificate: which fits your Enfield house

    If your extension fits inside ordinary permitted development limits, a Lawful Development Certificate is the better evidence: Enfield decided 636 of them in the same year. Prior approval is for the extension that goes beyond those limits and still stays within the larger home allowance.

    Nearby, the same question is answered a little differently by Barnet and Haringey, where the same Order is applied by a different council. Our Enfield area page lists every service we offer in the borough.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    The street around you
    Move across the plinth — the blocks rise around the pointer.

    Questions

    Does Enfield refuse many larger home extension notifications?

    In the latest published year it granted 35 and refused 27. A refusal usually turns on the neighbour's windows or boundary, so those are what we draw first.

    Can I use prior approval if my Enfield home is in a conservation area?

    No. The route excludes article 2(3) land, and the borough has 24 conservation areas. We check the address before quoting.

    How long does Enfield have to decide?

    42 days from a valid notification. We cannot promise a decision date, and we advise waiting for written confirmation.

    What does the council charge?

    £249 for a larger home extension notification, paid to the council. Our own fee is fixed after the free check.

    Sources and dates