020 7864 7245Request a fixed quote

Brent, London

Planning appeals in Brent

Brent publishes 39 Article 4 directions and four separate guidance documents for householders, so a refusal here can rest on more than the design of your extension. We read the notice against the guidance and the directions, say whether the reasons can be answered, and prepare the drawings and statement for an appeal when it makes sense. Fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on planning appeals

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Brick cottage with a tiled roof, chimneys and a front dormer window

    Planning appeals in Brent: what sits behind a refusal

    The council decided 879 householder applications in the latest year and granted 86.6 per cent, with 97.2 per cent decided in time. Its 734 minor decisions were granted 74.8 per cent of the time. Householder cases were granted at a higher rate than minor ones here, and a refusal in either group should be examined, not simply accepted.

    What makes Brent distinctive is the density of controls. It has 39 Article 4 directions, 23 conservation areas and 93 list entries. A direction can remove permitted development rights and turn a small project into a planning application, and a refusal may follow from that. Sometimes the right question is not "why was the design refused?" but "was the application needed in the first place?"

    Only 43.3 per cent of households live in a house or bungalow, and a terraced house averages £700,019, so a refusal often hits owners of a house they plan to stay in and improve.

    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline

    Local figures for Brent

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Article 4 directions39 Article 4 directions published by the council—planning.data.gov.uk
    Conservation areas23 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries93 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Householder decisions879 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted86.6 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time97.2 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor application decisions734 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications granted74.8 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Households living in a house43.3 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    DMPO 2015 art 37(2)(a): householder appeal, from the date of the decision notice12 weeks—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Brent
    Which application your project needsLawful Development Certificate decision: 8 weeks. Prior approval decision: 42 days. Householder decision: 8 weeksYour projectWithin permitted development?Lawful Development CertificatePrior approvalHouseholder applicationYesLarger rear extensionNoABC

    Which application your project needs

    The usual route for a house; flats and listed buildings follow other rules.

    A · Lawful Development Certificate decision
    8 weeks
    B · Prior approval decision
    42 days
    C · Householder decision
    8 weeks

    Four guidance documents an inspector may read

    Brent's householder guidance is the Residential Extensions and Alterations Supplementary Planning Document. Alongside it sit the Basement Supplementary Planning Document, the Brent Design Guide Supplementary Planning Document (SPD1) and the Houses in Multiple Occupation SPD. The Local Plan is the Brent Local Plan 2019-2041, adopted in 2,022.

    Each has a different job. The extensions document governs depth, height and relationship to the original house. The basement document matters if your scheme digs down. The design guide sets the wider standard, and the multiple occupation document applies if the house is or may become shared. A refusal can quote any of them, and an appeal statement must answer the one actually cited.

    Where a refusal mentions shared occupation, we ask early about your intended use, because the evidence needed is different from an ordinary family extension.

    Deadlines and timings

    The deadline for a householder appeal is 12 weeks from the decision notice. In its latest statistics the Inspectorate gave a median of 11.6 weeks for householder written-representation appeals, and the twelve-month median across all written-representation cases was 18 weeks.

    These figures describe finished national cases, not forecasts. Plan on several months and leave building work until a decision is made. If you want to keep the project moving, a revised application can run alongside the appeal, and we will tell you whether doing both makes sense for your house and what it adds to the quote.

    How we build the appeal case in Brent

    The statement answers each reason in turn and cites the document the officer cited. Where an Article 4 direction is involved, we check its wording and the date it took effect, because the exact scope matters, and we show the inspector how the proposal relates to what the direction covers.

    For disputes about bulk or outlook we draw sections through the boundary and add a 3D view. Another chartered technologist reads the bundle before it goes, and all sheets come from one model. Our planning drawings page describes the method.

    Conditions and small design changes

    An appeal does not have to be all or nothing. Inspectors can grant permission subject to conditions, so a concern about overlooking might be met by obscure glazing on a side window, and a concern about appearance by an agreed brick or roof material. We think through which concerns in the refusal a condition could resolve and write that into the statement as a fallback position.

    Small changes to the drawings can sometimes go further. A slightly lower eaves line, a stepped side wall or a window moved a short distance may answer an objection that the officer treated as fatal. We show you the amended design and what it costs you in floor area before anything is lodged.

    Choosing the right route after a refusal

    If the problem is a detail, a revised application may be quicker. If the council misapplied the guidance, an appeal fits. If an Article 4 direction means your work needed permission and you disagree, we check the wording first. Lawful work can be confirmed by a Lawful Development Certificate, and larger rear extensions sometimes suit prior approval.

    The borough's wider rules are on our Brent architectural drawings page. Each route gets a fixed quote, you choose, and the final decision belongs to the inspector, so no result can be promised.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Pencil resting on a dimensioned technical drawing beside a scale rule
    The street around you
    Move across the plinth — the blocks rise around the pointer.

    Questions

    How many Article 4 directions does Brent have?

    The council publishes 39. We check your address against them before drawing or appealing.

    Which Brent documents govern householder extensions?

    The Residential Extensions and Alterations Supplementary Planning Document is the main one, with the Brent Design Guide Supplementary Planning Document (SPD1) and the Basement Supplementary Planning Document for basements.

    How many householder applications does Brent grant?

    86.6 per cent of 879 in the latest year.

    How long do I have to appeal?

    12 weeks from the decision notice date.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.