Hammersmith & Fulham, London

Flat conversion drawings in Hammersmith & Fulham

Hammersmith & Fulham grants almost every small housing scheme it decides, but it is slow, and its streets are dense with conservation areas. Our flat conversion drawings in Hammersmith & Fulham start at £1,195 including VAT and are prepared by MCIAT chartered architectural technologists.

From £1,195 (VAT included)

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on flat conversion drawings

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline

    A high grant rate, and a slow desk, in Hammersmith & Fulham

    The council has no published numeric rule for dividing a house that we can quote, so its record is our guide. In the latest twelve months it decided 565 minor applications, the class for fewer than ten homes, and granted 95.9 per cent. That is a very high grant rate.

    The catch is time. Only 78.6 per cent of those decisions came inside eight weeks or an agreed extension, a slow desk, and householder decisions were similar at 79.8 per cent. Plan for a longer wait than the statutory period and book the builder after the decision, not before.

    The practical response is a submission with nothing left to query. We include the area schedule, stacking diagrams, bin and cycle stores and the entrance design from day one.

    Upper floors of a large yellow-brick Victorian house in London with chimney pots

    Local figures for Hammersmith & Fulham

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Minor application decisions565 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications granted95.9 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications decided in time78.6 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time79.8 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Mayoral CIL charging band1 MCIL2 charging band (1-3)—london.gov.uk
    Mayoral CIL rate (indexed)96.97 £/m² (indexed, permissions granted in 2026)—london.gov.uk
    Households living in a house24.6 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Conservation areas47 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries268 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Average price, terraced1,139,759 GBP2026-07publicdata.landregistry.gov.uk
    Average price, flat568,235 GBP2026-07publicdata.landregistry.gov.uk
    Average price change over 12 months-9 %12 months to 2026-07publicdata.landregistry.gov.uk
    Change of use of a building to one or more separate dwellinghouses, not more than 10: per dwellinghouse, from 1 Apr 2026610 GBP per dwelling—ribblevalley.gov.uk
    London Plan 2021 Policy D6, part 8: min floor-to-ceiling height for 75% of GIA2.5 m—london.gov.uk
    Households81,244Census 2021 (21 March 2021)nomisweb.co.uk
    Approved Document E 2003 incl. 2015, Table 0.1aSeparating walls 43 dB DnT,w+Ctr (min); floors and stairs 43 dB airborne (min), 64 dB L'nT,w impact (max) for dwellings formed by material change of use—gov.uk
    Average price, semi-detached1,503,460 GBP2026-07publicdata.landregistry.gov.uk
    Householder applications granted97.8 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Hammersmith & Fulham
    Building regulations, layer by layerPart A: structure: Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments. Part B: fire safety: All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604. Part L: insulation: New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4. Part K: stairs: 2.0 m clear headroom over stairs. Full plans application: Building control body must decide a full plans application within 5 weeks, or longer if agreed in writingPart A: structurePart B: fire safetyPart L: insulationPart K: stairsFull plans applicationABCDE

    Building regulations, layer by layer

    The Approved Documents that shape most house projects, from structure to the application itself.

    A · Part A: structure
    Approved Document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments
    B · Part B: fire safety
    All dwellings: fire detection and alarm system minimum Grade D2 Category LD3 (BS 5839-6), mains-operated smoke alarms to BS EN 14604
    C · Part L: insulation
    New elements in existing dwellings, limiting U-values W/(m²·K): roof 0.15, wall 0.18, floor 0.18, windows 1.4 (or WER Band B), doors 1.4
    D · Part K: stairs
    2.0 m clear headroom over stairs
    E · Full plans application
    Building control body must decide a full plans application within 5 weeks, or longer if agreed in writing

    Dense streets, small houses and heritage

    Just 24.6 per cent of the borough's 81,244 households live in a house, and the council publishes 47 conservation areas. Many terraced streets fall inside one, and there are 268 listed entries too.

    That makes front elevations a priority. A new second front door, meter box or bin enclosure is drawn precisely, with materials, so the conservation officer sees a considered scheme. Our page on architectural drawings in Hammersmith & Fulham lists the constraints across the borough.

    Prices and levy in Hammersmith & Fulham

    A terraced house averages about £1,139,759 here and a flat about £568,235, with average prices changing by -9 per cent over twelve months. A falling market makes the sums on a conversion worth running carefully.

    The Mayor's levy puts the borough in band 1, the highest, with an indexed rate of £96.97 per square metre. The council fee is £610 per flat, and the small-extension exemption does not apply when a dwelling is created.

    Sizes, sound and drawings

    London's rule asks for a floor-to-ceiling height of 2.5 m in most of each flat, which tests basements in Fulham terraces. We measure before we draw.

    Sound is detailed in the building regulations drawings, to meet Separating walls 43 dB DnT,w+Ctr (min); floors and stairs 43 dB airborne (min), 64 dB L'nT,w impact (max) for dwellings formed by material change of use. A second chartered technologist checks all sheets, and we redraw at no charge until approval if the council asks for changes.

    Making a Hammersmith & Fulham conversion pay

    With a terraced house at about £1,139,759 and a semi-detached at about £1,503,460, every conversion here begins with a valuation. The target is two flats that sell or let for more, after costs, than the house would. A flat averages £568,235, so each unit must be efficient, with no wasted corridor.

    That is why layouts are tested before anything is drawn for the council. We compare a vertical split, with a flat on each floor, against a horizontal one where the lower flat takes the garden, and report the net internal area of each flat, as the officer will. If a scheme misses the space standard by a small margin, we look for the half square metre in a stair or a cupboard rather than abandoning the scheme.

    Many owners also want to improve the house first. If that is you, planning drawings in Hammersmith & Fulham explains the application route, which a conversion shares, and householder schemes here were granted at 97.8 per cent in the latest twelve months.

    Programme planning for a slow desk

    Because decisions run late, we suggest planning in layers. Submit the application with the full drawing set, use the waiting period for the structural engineer and the building regulations drawings, and agree a builder start date that depends on the decision, not on the calendar.

    It also helps to keep neighbours informed. A short note about the works, with the drawings, tends to reduce objections, which in a dense borough can otherwise lengthen the case. Our drawings show screening, windows and bin stores so the officer sees how each likely concern was handled, and a second chartered technologist checks the set before it leaves us.

    Finally, keep a note of costs against the plan. The council fee, the levy, the survey, the structural engineer and the sound upgrades each arrive at different moments, and owners who list them at the start rarely get caught out by the total. We include a short next-steps note with every set that names each one.

    What you receive

    Building regulations section drawing showing the construction build-up
    Sample drawing. Building regulations section showing construction build-up for a building control check.
    Red-brick mansion blocks and shopfronts on a street corner
    Unit by unit
    Move up and down — the nearest units slide out.

    Questions

    Are flat conversions usually granted in Hammersmith & Fulham?

    95.9 per cent of minor applications were granted in the latest twelve months, though we cannot promise any outcome.

    Why is the decision slow?

    Only 78.6 per cent of minor decisions were made on time, so allow extra weeks.

    How many conservation areas are there?

    The council publishes 47.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.