Basement impact assessment in Merton

Merton requires a basement impact assessment for every scheme that includes a basement, and it does not stop at the report: the council expects ground investigation, a drainage strategy and a construction method outline to arrive with it. The borough has its own basement SPD. We assemble the pack on a fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on basement impact assessments

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Georgian brick terrace with sash windows, arched fanlight doorways, stone steps and iron railings in London

    What Merton validates with a basement application

    Merton's local plan sets the minimum, and it is a long one. In the council's words, BIA + ground investigation + drainage strategy + outline CMS. If any part is missing, the application waits at the validation desk instead of starting its clock.

    The policy basis is the Merton Local Plan 2024, adopted in 2,024, and the borough publishes a Basement and subterranean SPD for the detail. We read both before any design work, because the SPD tells us how the council expects the three themes of stability, groundwater and surface water to be argued.

    The drainage strategy is the part that surprises owners. It is not an afterthought to the engineering: it explains where rainwater goes once the garden has a buried box under it, and it has to match the sections and the sump arrangements on the drawings.

    Brick cottage with a tiled roof, chimneys and a front dormer window

    Local figures for Merton

    Figures with their unit, period and source
    MeasureValuePeriodSource
    All schemes including basements need a Basement Impact Assessment under Local Plan 2024 Policy D12.11, including site-specific ground investigation, a Drainage Strategy, an outline Construction Method Statement and a Construction Traffic Management Plan.BIA + ground investigation + drainage strategy + outline CMS—merton.gov.uk, Merton Council's Validation Checklist 2024 (December 2024), p.37
    Conservation areas28 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries243 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Domestic gardens share of land (GLUD 2005)27.2 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk
    Households living in a house60.4 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Householder applications granted92.9 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time85.2 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications decided in time82 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Party Wall etc. Act 1996 s6(1): excavation within 3 m horizontally of an adjoining owner's building or structure and deeper than the bottom of its foundations3 m—legislation.gov.uk
    Approved Document C (2004 ed. incl. 2010/2013) para 3.2: where the water table can rise to within 0.25 m of the lowest floor, drain by gravity or other effective means; para 3.4 groundwater stability; basement walls under groundwater pressure covered in the walls section0.25 m—gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Merton
    Which application your project needsLawful Development Certificate decision: 8 weeks. Prior approval decision: 42 days. Householder decision: 8 weeksYour projectWithin permitted development?Lawful Development CertificatePrior approvalHouseholder applicationYesLarger rear extensionNoABC

    Which application your project needs

    The usual route for a house; flats and listed buildings follow other rules.

    A · Lawful Development Certificate decision
    8 weeks
    B · Prior approval decision
    42 days
    C · Householder decision
    8 weeks

    Merton ground and garden conditions

    Merton is a borough of houses. 60.4 per cent of households live in one, 55.6 per cent own their home, and domestic gardens cover 27.2 per cent of the land in the national land-use database. That combination makes rear-garden basements and combined extension and basement schemes a regular brief.

    Large gardens mean trees, and trees mean roots and moisture changes in clay. The ground investigation looks at them directly, because shrinking and swelling soil is a stability question for your own walls and for the neighbours'. We mark every significant tree on the plan so the report and the drawings tell the same story.

    Neighbouring houses matter as much as your own. Terraced and semi-detached pairs share foundations at the party line, and the stability assessment has to show that the excavation will not undermine them. We record the depth and type of the neighbours' foundations where the investigation can reach them.

    Heritage and listed buildings around a Merton basement

    The borough has 28 conservation areas and 243 listed building entries, with 3 at Grade I, 3 scheduled monuments and 4 registered parks and gardens. In a conservation area the council expects a lightwell or a garden-level structure to respect the street.

    23 Heritage at Risk Register entries sit within the borough too. For a scheme beside or beneath a protected building, the heritage case and the assessment go in together.

    How Merton decides applications

    The council decided 1,073 planning applications in its latest published year. It granted 92.9 per cent of householder applications and 82.5 per cent of minor ones. The timing figures are more modest: 85.2 per cent of householder cases and 82 per cent of minor cases were decided within the statutory period or an agreed extension.

    With those timing figures, a complete first submission is worth the effort. Our planning drawings in Merton cover the set the assessment refers to, and the structural calculations in Merton page explains how the engineer's design meets ours.

    Party wall and drainage rules for a Merton dig

    Under the Party Wall etc. Act 1996, a notice is needed for excavation within 3 metres of an adjoining building that goes deeper than its foundations, and within 6 metres on the diagonal test. Serve it at least 1 month before work. Our party wall notices service prepares the plans.

    Building Regulations then govern the floor. Where the water table can rise to within 0.25 metres of the lowest floor, it must be drained or protected.

    Cost and scope for a Merton assessment

    We are chartered architectural technologists (MCIAT). We coordinate the engineer, the ground investigation firm and the drainage designer, and assemble the pack so nothing on the list is missing. The price depends on depth, soil and tree cover, so after the free constraints check you receive a fixed quote.

    Our order of work is the same on every Merton job. We read the policy, run the desk study, brief the ground investigation, then draw and engineer against the findings. The council sees one pack in which every number agrees, and you see a fixed price at the start rather than a series of extras.

    If the scheme also adds a rear extension or a loft, say so now. The shared survey, the shared structural strategy and the single planning application save both time and fees.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline
    The street around you
    Move across the plinth — the blocks rise around the pointer.

    Questions

    What does Merton need with a basement application?

    The local plan asks for BIA + ground investigation + drainage strategy + outline CMS.

    Is there a Merton basement SPD?

    Yes, the Basement and subterranean SPD, which sits under the Merton Local Plan 2024.

    Why does Merton want a drainage strategy?

    A buried box in a garden changes where rainwater goes, so the council wants the outline strategy before it decides, not after.

    What does a Merton assessment cost?

    It depends on depth, soil and trees. You receive a fixed quote after a free constraints check.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.