020 7864 7245Request a fixed quote

Kingston upon Thames, London

Basement impact assessment in Kingston upon Thames

Kingston upon Thames asks for a basement impact assessment on every basement application, and the report must be signed by a chartered civil or structural engineer. The borough sets out the content in its validation list rather than in a garden percentage. We assemble the pack on a fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on basement impact assessments

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Georgian brick terrace with sash windows, arched fanlight doorways, stone steps and iron railings in London

    What Kingston upon Thames requires with a basement

    The Royal Borough's local validation list is unusually direct. For authorship it says: Signed by chartered civil or structural engineer. An application with an unsigned or non-chartered report will not be validated, so the clock never starts.

    For content, the same list expects a package of technical work: Desk study; intrusive investigation; engineering design; outline CMS. The desk study covers history, topography, geology, groundwater and flood risk; the intrusive investigation includes groundwater monitoring; the engineering drawings show drainage, attenuation and pumping; and the method statement sets out propping and temporary works.

    The borough's policy framework is its Core Strategy (with Kingston Town Centre Area Action Plan 2008), adopted in 2,012. We treat the validation list as the working brief, because that is what the case officer checks first.

    Brick cottage with a tiled roof, chimneys and a front dormer window

    Local figures for Kingston upon Thames

    Figures with their unit, period and source
    MeasureValuePeriodSource
    A Basement Impact Assessment is required for all applications involving basement development and must be carried out and signed by a Chartered Civil Engineer or Chartered Structural Engineer. It covers land stability, structural stability, heritage/archaeology and groundwater and surface water drainage and flooding.Signed by chartered civil or structural engineer—kingston.gov.uk, Royal Borough of Kingston upon Thames Validation Local List (February 2024), p.37-38
    BIA technical content is likely to include a desk study (history, topography, geology, groundwater, flood risk), a site-specific intrusive investigation (visual assessment of movement plus ground investigation with groundwater monitoring), engineering design drawings (including drainage layout, attenuation, sump/pump and non-return valves), and an outline Construction Method Statement with underpinning/piling, propping and temporary-works sequence drawings.Desk study; intrusive investigation; engineering design; outline CMS—kingston.gov.uk, Royal Borough of Kingston upon Thames Validation Local List (February 2024), p.38-40
    Conservation areas28 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries163 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Article 4 directions3 Article 4 directions published by the council—planning.data.gov.uk
    Green Belt share of the council area17 % of council area covered by green-belt polygons—planning.data.gov.uk
    Domestic gardens share of land (GLUD 2005)30.9 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk
    Householder applications granted83 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications decided in time80.1 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Party Wall etc. Act 1996 s6(1): excavation within 3 m horizontally of an adjoining owner's building or structure and deeper than the bottom of its foundations3 m—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Kingston upon Thames
    Which application your project needsLawful Development Certificate decision: 8 weeks. Prior approval decision: 42 days. Householder decision: 8 weeksYour projectWithin permitted development?Lawful Development CertificatePrior approvalHouseholder applicationYesLarger rear extensionNoABC

    Which application your project needs

    The usual route for a house; flats and listed buildings follow other rules.

    A · Lawful Development Certificate decision
    8 weeks
    B · Prior approval decision
    42 days
    C · Householder decision
    8 weeks

    How we build a Kingston upon Thames assessment

    The order of work matters. We start with the desk study, because it tells us whether the site sits over clay, gravel or something more awkward, and whether surface water is a known problem. Only then do we brief the ground investigation, so boreholes land where the basement will actually go.

    While the investigation runs, we prepare the plans and sections the engineer will design against. When the results arrive, the engineer fixes the retaining wall type and the groundwater measures, and we update the drawings so that the depth on the section matches the depth in the report. A mismatch there is the commonest reason for a request for more information.

    We are chartered architectural technologists (MCIAT). We coordinate; the engineer signs. Our structural calculations in Kingston upon Thames page describes how that split works in practice.

    Access is the other early question. Boreholes and small rigs have to reach the back garden, sometimes through a side passage or the house itself, and the same constraint later applies to excavators and spoil removal. We note the access route on the plan so the council sees that the outline construction method is realistic.

    Constraints specific to Kingston upon Thames

    A basement here often sits in a very different setting from inner London. The borough has 28 conservation areas, 163 listed building entries and 3 Article 4 directions, and 17 per cent of its area is covered by green-belt polygons. Houses account for 61.5 per cent of households, so gardens are larger than in the inner boroughs.

    Domestic gardens cover 30.9 per cent of the borough's land in the national land-use database. More garden means more scope for a lightwell or a cinema room, but also more trees, and tree roots are part of the ground and drainage assessment.

    How the council treats householder schemes

    The council decided 1,100 planning applications in its latest published year. It granted 83 per cent of householder applications but only 64.9 per cent of minor ones. Timing is the other number to watch: 92.5 per cent of householder cases and 80.1 per cent of minor ones were decided in time.

    A basement application is judged with any extension above it. We prepare the full planning drawings in Kingston upon Thames so that the basement, the extension and the elevations tell one story.

    Party wall and drainage rules for a Kingston upon Thames dig

    Notice under the Party Wall etc. Act 1996 is needed for excavation within 3 metres of an adjoining building that goes deeper than its foundations, and within 6 metres on the diagonal test. Serve it at least 1 month before work. Our party wall notices service prepares the plans.

    Building Regulations then address the floor. Where the water table can rise to within 0.25 metres of the lowest floor, it needs drainage or protection.

    Cost and next step

    There is no list price because ground, depth and tree cover change the scope. After the free constraints check we send a fixed quote and a note of what the council will expect.

    The council can ask for more than the minimum list if the desk study raises a concern, so we allow for a modest second round of questions in our programme. Tell us early about any trees, any neighbour already worried about the dig and any plans for an extension above, because each of those changes what the investigation needs to cover.

    We also send a short next-steps note with the quote. It lists who will do what, the order of the work and the points in the process where your decision is needed, so there are no surprises once the boreholes are drilled.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Rear view of brick terraced houses in London with slate roofs and chimney stacks along the shared roofline
    The street around you
    Move across the plinth — the blocks rise around the pointer.

    Questions

    Who can sign a Kingston upon Thames basement impact assessment?

    The council's validation list says Signed by chartered civil or structural engineer.

    What goes into the assessment?

    The borough lists Desk study; intrusive investigation; engineering design; outline CMS.

    Does the green belt affect a Kingston upon Thames basement?

    It can, on the edges of the borough, where 17 per cent of the area is covered by green-belt polygons. We check your site against the map first.

    What does an assessment cost?

    It depends on depth, ground and trees. You receive a fixed quote after a free constraints check.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.