Merton, London
Planning appeals in Merton
Planning appeals in Merton often start after a long wait, since only 85.2 per cent of householder cases were decided in time, and the 12 week limit still runs from the notice. Merton granted 92.9 per cent of householder applications in its latest year. We read the refusal, say whether it can be answered, and prepare the drawings and statement. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on planning appeals
Seven steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Design options
We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.
Design frozen
You choose an option in writing. Nothing changes after this without your say.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Submission
We prepare the forms, certificates, fee and documents and submit through the Planning Portal.
Officer liaison
We answer the planning officer and make any amendments within five working days, at no charge until approval.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Slow decisions, high grant rate: what it means for you
Merton decided 759 householder applications in its latest year and granted 92.9 per cent, yet only 85.2 per cent were decided within eight weeks or an agreed extension. That combination creates a particular situation.
Applicants who wait months and are then refused feel the injury twice. The notice date, though, starts the clock regardless of how long the decision took. Note it the day the refusal arrives. If the application was not decided in time at all, a separate right of appeal against non-determination may exist, and we can advise on that.
Minor applications fared well too, with 82.5 per cent of 206 granted.

Local figures for Merton
| Measure | Value | Period | Source |
|---|---|---|---|
| Householder decisions | 759 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications granted | 92.9 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 85.2 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Minor application decisions | 206 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Minor applications granted | 82.5 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Larger home extension prior approvals granted | 22 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Larger home extension prior approvals refused | 80 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Domestic gardens share of land (GLUD 2005) | 27.2 % of land that is domestic garden (GLUD 2005) | 2005 | data.london.gov.uk |
| DMPO 2015 art 37(2)(a): householder appeal, from the date of the decision notice | 12 weeks | — | legislation.gov.uk |
| Section 1.1: allowed rate for s78 planning appeals, Apr-Jun 2026 | 31 % | — | gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Which application your project needs
The usual route for a house; flats and listed buildings follow other rules.
- A · Lawful Development Certificate decision
- 8 weeks
- B · Prior approval decision
- 42 days
- C · Householder decision
- 8 weeks
Prior approval: where the refusals sit
The council granted 22 large-extension prior approvals and refused 80 in its latest return. Against a householder record this generous, that is a strikingly different picture, and it tells us that officers read neighbour comments on deep extensions closely.
If you were refused, the appeal is on narrow grounds. We examine whether the objection concerned a single window, a boundary condition or the depth as a whole. A reduced scheme submitted as a householder application often gets a fair hearing because the borough's general record is favourable.
Basements and the character study
Merton's Basement and subterranean SPD governs excavation, and its Borough Character Study SPD describes how different parts of the borough are meant to look. Different parts of the borough have different characters, so an inspector will expect your drawings to show that you understood the actual street.
Where the refusal cites character, we draw the frontage with neighbours' extensions and mark which were permitted and when. For basements we coordinate with an engineer so the section, the statement and the structural method agree.
Small sites and heritage
The borough's Small sites toolkit SPD supports modest infill, so a refused small scheme can be argued against a policy that encourages such sites if the design is right. The borough also has 28 conservation areas and 243 listed entries.
We look at the garden too: domestic gardens cover 27.2 per cent of the land, and garden loss can be a reason in infill refusals.
Non-determination: when no decision arrives
Because Merton decided only 85.2 per cent of householder cases on time, some applicants wait well beyond the statutory period with no answer. In that situation the law lets you appeal against the failure to decide, and the appeal proceeds as though the council had refused.
That route is not always wise. A late decision may still be a favourable one, and starting an appeal removes the council's chance to grant. We advise on timing: how long the delay has run, what the case officer has said, and whether the file looks close to a decision.
Where the application has stalled for a clear reason, such as an unresolved consultee comment, we may recommend a short written chaser first, with an offer of amended plans, before an appeal is lodged.
Minor applications show the same pattern as householder ones, with 82.5 per cent of 206 decisions granted. Where a refused scheme added a dwelling, the Small Sites toolkit and the character study give an appeal real policy to lean on, and we quote from them in the statement.
We draw the retained garden depth and area on the plan so the inspector can see what is left after the scheme.
Evidence for a deep rear extension
A larger home extension prior approval is judged on its impact on adjoining premises, so the appeal can be built around that: the measured depth, the height at the boundary and the effect on adjoining windows.
We produce a dimensioned plan and a section along the shared boundary, with the neighbour's extensions drawn to scale. An inspector sees the real relationship instead of a description of it.
If the extension was in fact within the limits and the council miscounted, that is a clean ground. If it was beyond them, a full application at the same depth is a different case, judged on the merits.
How we prepare the case
We write the statement, correct the drawings, add 3D views where outlook is disputed and send the bundle for a second technologist's check. Our planning drawings in Merton page covers a fresh application, and our architectural drawings in Merton page lists the rest of our work.
What you receive


Related pages
Other services in Merton
Questions
My Merton decision took months. Does that change the deadline?
No. The 12 week limit runs from the notice date. If no decision came at all, ask us about non-determination.
Why are Merton prior approvals refused so often?
The council refused 80 against 22 granted, usually on neighbour impact.
Is appealing better than redesigning?
Where the refusal is narrow, a revised application often saves time. We compare both in writing.
What proportion of appeals succeed nationally?
31 per cent of section 78 appeals were allowed in the latest quarter, an average across all cases.
Sources and dates
- assets.publishing.service.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- data.london.gov.uk, retrieved
- legislation.gov.uk, retrieved
- gov.uk, retrieved
- merton.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.