Merton, London
Planning consultant in Merton
Merton grants most householder applications, yet decides a smaller share of them in time, so a planning consultant in Merton works on the timetable as well as on the merits. We give a fixed quote after a free constraints check and prepare the route, the statement and the council liaison, with drawings by MCIAT chartered architectural technologists.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on planning consultant
Seven steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Design options
We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.
Design frozen
You choose an option in writing. Nothing changes after this without your say.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Submission
We prepare the forms, certificates, fee and documents and submit through the Planning Portal.
Officer liaison
We answer the planning officer and make any amendments within five working days, at no charge until approval.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
High grants, slow clock: what a Merton consultant plans for
The council decided 759 householder applications in its latest twelve months, granting 92.9 per cent. Only 85.2 per cent were decided within the statutory period or an agreed extension.
A high grant rate with a slow clock tells us that a well-prepared scheme usually gets through, but later than the eight week period many owners expect. We plan the project around the waiting time, and we set out in writing when an extension of time is likely to be agreed.
Minor applications ran at 82.5 per cent granted from 206 decisions, with 82 per cent decided in time.
None of this means a slow decision is a poor one. It means the programme you give your builder should include a realistic wait, and that a written case is worth more where the officer needs to be convinced quickly because they have a long queue.

Local figures for Merton
| Measure | Value | Period | Source |
|---|---|---|---|
| Conservation areas | 28 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 243 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Heritage at Risk entries | 23 Heritage at Risk Register entries within the LPA boundary (Historic England) | — | planning.data.gov.uk |
| Householder decisions | 759 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications granted | 92.9 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 85.2 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Minor applications granted | 82.5 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Larger home extension prior approvals granted | 22 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Larger home extension prior approvals refused | 80 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Lawful development certificate applications (PS1) | 58 certificates | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Domestic gardens share of land (GLUD 2005) | 27.2 % of land that is domestic garden (GLUD 2005) | 2005 | data.london.gov.uk |
| Householder single dwellinghouse, from 1 Apr 2026 | 548 GBP | — | ribblevalley.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Which application your project needs
The usual route for a house; flats and listed buildings follow other rules.
- A · Lawful Development Certificate decision
- 8 weeks
- B · Prior approval decision
- 42 days
- C · Householder decision
- 8 weeks
The guidance Merton officers work from
The plan is the Merton Local Plan 2024, adopted in 2,024. Three supporting documents matter for homes: the Basement and subterranean SPD, the Borough Character Study SPD and the Small sites toolkit SPD.
The character study is the one that decides most extension cases, because it describes the grain of each area and what the council wants kept. The basement document applies if you plan to dig, and the small sites toolkit applies if your garden could take another house.
We map your scheme to the right document at the free check, so the statement answers the guidance the officer will actually open.
If the council asks for changes, we reply within five working days and show you the revised sheets first. Redrawing is free until approval, and we say plainly at the outset that no decision date can be promised, so your builder books around the real position.
Heritage and trees across Merton
The borough records 28 conservation areas and 243 listed building entries, with 23 on the Heritage at Risk Register and 3 scheduled monuments. None of the borough is green belt in the data, which shows 0 per cent.
Heritage is spread unevenly across a borough like this, and your address decides whether it affects you. The free check tells you before you spend anything.
Larger extensions: Merton's refusal pattern
For larger home extensions the council granted 22 prior approvals and refused 80 in the latest statistical year. Refusals outnumbered grants by close to four to one.
That makes the notification route a poor default here. Where a deep rear extension is the goal, a householder application with a reasoned case is usually the better use of time, and we set the two out side by side.
Merton issued only 58 lawful development certificates in the same period. Where you need proof of lawful use, a Lawful Development Certificate in Merton is still available.
Merton homes and values
Merton has 81,729 households, with 60.4 per cent in a house or bungalow and 55.6 per cent owner-occupied. Domestic gardens covered about 27.2 per cent of the land at the last national survey.
A semi-detached home averages £954,064, and a detached home £2,338,085. At those values, a delay of a few months on an extension is costly, and that is where a consultant's attention to the timetable repays itself.
Fees and levy in Merton
The householder fee is £548 for one dwelling. The borough's levy is split by area under the Merton CIL Charging Schedule, and the Mayor's levy is £72.73 per square metre in the current indexed year.
Householder extensions are normally exempt from both. We give you a figure early if a new home is involved.
Before lodging, a second chartered technologist, not the person who drew the sheets, checks the set against the validation list and the character study. We then track the case, answer consultee comments and keep you informed of any change the officer asks for.
More about Merton
The sheets are covered under planning drawings in Merton, and refusals under planning appeals in Merton. The borough overview is architectural drawings in Merton.
Nearby rules are set out for Wandsworth, Sutton and Kingston upon Thames, and the general explanation is on our planning consultant page.
What you receive


Related pages
Other services in Merton
Questions
Does Merton grant most householder applications?
It granted 92.9 per cent of 759 in its latest year, though only 85.2 per cent were decided in time.
Should I use prior approval in Merton?
Refusals outnumbered grants, 80 to 22, in the latest year. We compare it with a householder application.
Which Merton documents matter for a basement?
The Basement and subterranean SPD. We check whether your plot and plan fit it at the free stage.
What is the householder fee?
£548 for one dwelling, paid to the council.
Sources and dates
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- data.london.gov.uk, retrieved
- ribblevalley.gov.uk, retrieved
- merton.gov.uk, retrieved
- merton.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- nomisweb.co.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- merton.gov.uk, retrieved
- london.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.