Croydon, London
Prior approval drawings in Croydon
Prior approval drawings in Croydon are used by owners of a borough that is 60.2 per cent houses, with a council that decided 17 larger home extension notifications in favour and 34 against in the latest returns. We are MCIAT chartered architectural technologists, and we draw each notification for the neighbours as well as the officer. The council fee is £249; our quote is fixed after a free check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on prior approval drawings
Seven steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Design options
We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.
Design frozen
You choose an option in writing. Nothing changes after this without your say.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Submission
We prepare the forms, certificates, fee and documents and submit through the Planning Portal.
Officer liaison
We answer the planning officer and make any amendments within five working days, at no charge until approval.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Prior approval drawings in Croydon and the conservation guidance
The council's published design guidance that bears most on home extensions is the Conservation Areas General Guidance SPD. It looks narrow, but in a borough with 19 conservation areas it decides which streets can use the larger extension route at all, and what a householder fallback would have to respect.
The local plan was adopted in 2,018.
We read the guidance for the specific area before we agree a route, because conservation area rules in Croydon vary street by street: a house in one road may qualify while its twin in the next does not.

Local figures for Croydon
| Measure | Value | Period | Source |
|---|---|---|---|
| Larger home extension prior approvals granted | 17 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Larger home extension prior approvals refused | 34 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Upward home extension prior approvals refused | 3 decisions | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Conservation areas | 19 named conservation areas published by the council | — | planning.data.gov.uk |
| Householder applications granted | 86.6 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Households living in a house | 60.2 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| Domestic gardens share of land (GLUD 2005) | 32.8 % of land that is domestic garden (GLUD 2005) | 2005 | data.london.gov.uk |
| Lawful development certificate applications (PS1) | 494 certificates | 2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026) | assets.publishing.service.gov.uk |
| Average price, semi-detached | 535,706 GBP | 2026-07 | publicdata.landregistry.gov.uk |
| Local plan adopted | 2,018 | — | croydon.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Which application your project needs
The usual route for a house; flats and listed buildings follow other rules.
- A · Lawful Development Certificate decision
- 8 weeks
- B · Prior approval decision
- 42 days
- C · Householder decision
- 8 weeks
Croydon's record on larger and upward extensions
The national returns show 17 larger home extensions granted and 34 refused. Refusals outnumber grants, yet a meaningful number get through, so the route is a real option when the drawings are strong.
Upward extensions are rarer: 2 granted and 3 refused. Class AA has a long list of tests, including the external appearance of the house.
Compare ordinary householder applications. Croydon decided 786 in the latest twelve months and granted 86.6 per cent, with 94.4 per cent decided on time. Those are past borough figures, not a forecast for your address.
Gardens, houses and the green fringe
Domestic gardens cover 32.8 per cent of the land in the London land-use survey, a share that explains why rear extensions are so common. About 60.2 per cent of households live in a house or bungalow.
Green belt covers 25 per cent of the borough, and the borough has 3 registered parks and gardens and 15 heritage entries at risk. We check all of these against the address in the free constraints check.
A semi-detached house averages £535,706 and a terraced one £396,579.
Drawing a Croydon notification
The depth limits are 6 m (attached) / 8 m (detached), single storey, height max 4 m; not on article 2(3) land or an SSSI, counted from the original rear wall. We survey that wall, record neighbours' windows and boundaries and prepare the written description and site plan the Order requires.
On receipt, the LPA notifies adjoining owners/occupiers, giving at least 21 days for representations. If it has not notified a decision within 42 days, the development may begin, but we advise getting written confirmation.
Houses of multiple occupation are controlled by an Article 4 direction here, so if the extension is meant to add shared-living bedrooms we check that separately. Someone who did not draw the set reads it, and amendments the council asks for are redrawn within our fixed fee.
Before anything is filed, we send you the full set to read. You see the plans, the elevations and the written description in the same form the council will receive them, and any change you ask for at that point is made before submission rather than after a neighbour has seen the drawings. It is the moment to raise any doubt about the depth or the roof form.
Planning the work after a Croydon decision
Once a decision arrives, building control becomes the next hurdle. Our building regulations drawings take the same extension forward, so the structure, drainage and insulation follow the approved depth and height exactly.
We also remind owners that prior approval covers the extension as described. If the design changes on site, the permission may no longer cover it. The council fee is £249.
Croydon owners sometimes assume the notification and the building regulations application can be filed together. They are separate processes with separate officers, and building control cares about structure and energy, not neighbours. We prepare them in sequence so each document refers to the same dimensions, and any change made for one is carried into the other before submission.
Other routes for a Croydon home
Croydon recorded 494 lawful development certificate applications in the period, so many owners prove ordinary permitted development instead. A Lawful Development Certificate in Croydon is the right choice when the extension stays within normal limits.
Where more is needed, planning drawings in Croydon prepare a householder application. Our architectural drawings in Croydon page lists the rest, and neighbours may compare prior approval drawings in Sutton and prior approval drawings in Bromley.
What you receive


Related pages
Other services in Croydon
Questions
Does Croydon grant larger home extension notifications?
In the returns period it granted 17 and refused 34. That is borough-wide history, not a promise for one house.
Is every Croydon street open to the route?
No. The borough has 19 conservation areas, which are excluded, and we check your address against them first.
How long can the council take?
Development may begin if no decision has been notified within 42 days of the council receiving the information.
What is the council fee?
£249, paid to the council.
Sources and dates
- assets.publishing.service.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- data.london.gov.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- croydon.gov.uk, retrieved
- croydon.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- legislation.gov.uk, retrieved
- ribblevalley.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.