020 7864 7245Request a fixed quote

Hillingdon, London

Planning consultant in Hillingdon

Hillingdon is a borough where a house can sit under an Article 4 direction, a tree order and a green-belt boundary at once, which is why a planning consultant in Hillingdon starts with the constraints, not the design. We check them free, then give a fixed quote for the route, the planning statement and the officer liaison, with drawings by our MCIAT chartered architectural technologists.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on planning consultant

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Rows of brick terraced houses and gardens on a residential street

    What a Hillingdon planning consultant checks first

    The borough has published 150 Article 4 directions. Each one removes some permitted development rights, so a loft, porch or outbuilding that would be routine elsewhere may need a full application here. Until we confirm whether your address falls inside one, no route can be recommended.

    Alongside that sit 33 conservation areas, 731 tree preservation orders and 436 listed building entries. Any one of them can add a document to the validation list, such as a tree survey or a heritage note.

    The development plan is the Hillingdon Local Plan Part 1: Strategic Policies, with Local Plan Part 2: Development Management Policies and Site Allocations and Designations (January 2020). Its two parts were adopted at different times, and the strategic part is dated 2,012, so we cite the policy wording in force on the day you apply, not a summary from a leaflet.

    Georgian brick terrace with sash windows, arched fanlight doorways, stone steps and iron railings in London

    Local figures for Hillingdon

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Conservation areas33 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions150 Article 4 directions published by the council—planning.data.gov.uk
    Tree preservation orders731 tree preservation orders published by the council—planning.data.gov.uk
    Listed building entries436 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Green Belt share of the council area42 % of council area covered by green-belt polygons—planning.data.gov.uk
    Householder decisions1,147 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications granted90.2 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications granted68.7 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications decided in time89.4 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Larger home extension prior approvals granted29 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Larger home extension prior approvals refused13 decisions2025 Q2 to 2026 Q1 (1 Apr 2025 to 31 Mar 2026)assets.publishing.service.gov.uk
    Householder single dwellinghouse, from 1 Apr 2026548 GBP—ribblevalley.gov.uk
    Households living in a house68.9 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Households109,228Census 2021 (21 March 2021)nomisweb.co.uk
    Average price, semi-detached583,573 GBP2026-07publicdata.landregistry.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Hillingdon
    Which application your project needsLawful Development Certificate decision: 8 weeks. Prior approval decision: 42 days. Householder decision: 8 weeksYour projectWithin permitted development?Lawful Development CertificatePrior approvalHouseholder applicationYesLarger rear extensionNoABC

    Which application your project needs

    The usual route for a house; flats and listed buildings follow other rules.

    A · Lawful Development Certificate decision
    8 weeks
    B · Prior approval decision
    42 days
    C · Householder decision
    8 weeks

    Green belt, trees and the shape of an extension

    About 42 per cent of Hillingdon is green belt. For a house inside it, the question the officer asks is whether the extension is disproportionate to the original dwelling. Earlier additions count against you, so we measure what has already been built before sketching what you want.

    Trees are the quieter trap. A protected tree close to a rear extension can fix the footprint, the foundation depth and even the construction method. We ask for the survey early because it is cheaper to move a wall on paper than to answer an objection later.

    How Hillingdon decides: what the figures say

    Over its latest twelve months the council decided 1,147 householder applications and granted 90.2 per cent of them. 94.3 per cent met the statutory period or an agreed extension.

    Minor applications are a harder road. Of 367 decided, 68.7 per cent were granted, and only 89.4 per cent were decided in time. If your project is a small new home or a conversion of a house into flats, expect a longer conversation and plan for it.

    These are borough totals, not predictions. They tell us where a written case matters, and a householder job in Hillingdon often needs no more than good drawings.

    Prior approval and certificates in Hillingdon

    For larger rear extensions under the prior approval route, the council granted 29 notifications and refused 13 in the latest statistical year. Grants outnumber refusals, though a neighbour's objection still decides individual cases.

    If you only need proof that works are lawful, a Lawful Development Certificate in Hillingdon is cheaper than an application, and the council dealt with 529 of them in the same period. Where an Article 4 direction removes the right, we say so before you commission anything.

    Flat conversions and shared houses bring a further layer: the borough has an Article 4 direction for houses in multiple occupation, and that changes the route for a conversion.

    The homes behind the figures in Hillingdon

    The borough counts 109,228 households, and 68.9 per cent of them live in a house or bungalow, with 56.6 per cent owning their home. That is a lot of owners with a garden to build into, which is why householder work dominates the decision list.

    Prices set the stakes. A semi-detached home averages £583,573 and a detached one £941,938 in the latest index month, so an extension that adds a bedroom is a sizeable investment. Spending on a proper route check before you draw is small beside that.

    We use these numbers to decide how much consultancy a job needs. A semi-detached extension on an unrestricted street usually needs a clean set of sheets and a short covering note. A house on a restricted street, or a scheme that tests the policy, needs the fuller written case.

    Fees and what you pay us

    The council's fee for a householder application to one dwelling is £548. Where the Community Infrastructure Levy applies, Hillingdon's charging schedule is the London Borough of Hillingdon CIL Charging Schedule (adopted 10 July 2014), and the Mayor's levy is £72.73 per square metre in the current indexed year.

    Our fee is one fixed quote after the free check. If the officer asks for changes, we amend within five working days and redraw free until approval, though we cannot promise any decision.

    Where to go next

    If the project is a standard extension, our planning drawings in Hillingdon service may be all you need. After a refusal, see planning appeals in Hillingdon. The borough overview is architectural drawings in Hillingdon.

    Comparable rules are set out for Ealing, Hounslow and Harrow, and the London-wide explanation is on our planning consultant page.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Brick cottage with a tiled roof, chimneys and a front dormer window
    The street around you
    Move across the plinth — the blocks rise around the pointer.

    Questions

    How many Article 4 directions does Hillingdon have?

    The borough has published 150. We check your address against them in the free constraints step, before any fee.

    Can a tree preservation order stop my Hillingdon extension?

    It can shape or move it. With 731 orders in the borough, a survey is often the first document we request.

    Is Hillingdon strict on householder applications?

    It granted 90.2 per cent of 1,147 householder decisions in its latest year. That is a borough record, not a forecast for your house.

    What is the householder fee in Hillingdon?

    £548 for one dwelling, paid to the council. Our own fee is a separate fixed quote.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.