Planning appeals in Bexley
Bexley grants nearly every householder application: 94.6 per cent of 877 decisions in the latest year. If yours was refused, the officer saw a specific problem, and that is useful, because a specific reason can be answered. We read the refusal against the council's design guide, then prepare the drawings and statement for an appeal where it makes sense. Fixed quote after a free constraints check.
Fixed quote after a free constraints check
- MCIAT chartered
- £2m PI insured
- LABC Partnered
- Fixed fees, VAT included
Request a fixed quote

How we work on planning appeals
Seven steps from first call to approval.

Enquiry and constraints check
We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.
Measured survey
We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.
Design options
We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.
Design frozen
You choose an option in writing. Nothing changes after this without your say.
Independent check
A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.
Submission
We prepare the forms, certificates, fee and documents and submit through the Planning Portal.
Officer liaison
We answer the planning officer and make any amendments within five working days, at no charge until approval.
Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.
Request a fixed quote
Planning appeals in Bexley when refusals are rare
A grant rate of 94.6 per cent means a Bexley refusal stands out. The council decided 877 householder applications in the latest year and 99.4 per cent were decided on time, so the notice normally arrives promptly and states its reasons clearly. A second government return, counted over a slightly different four quarters, gives 95.3 per cent granted, which tells the same story.
Minor applications, such as small residential schemes, did less well: 82.4 per cent of 238 were granted, with 94.1 per cent decided in time. The gap between the two figures is a reminder that householder work is the easier category to win here, and that refusals in it are worth testing.
Remember what the numbers are. They describe every applicant in the borough, and they do not estimate the chance of success for a specific scheme.

Local figures for Bexley
| Measure | Value | Period | Source |
|---|---|---|---|
| Householder decisions | 877 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications granted | 94.6 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Householder applications decided in time | 99.4 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Minor application decisions | 238 decisions | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Minor applications granted | 82.4 % | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Minor applications decided in time | 94.1 % decided within 8 weeks or an agreed extended period | 1 July 2025 - 30 June 2026 | assets.publishing.service.gov.uk |
| Conservation areas | 23 named conservation areas published by the council | — | planning.data.gov.uk |
| Listed building entries | 114 list entries (Historic England, within the LPA boundary) | — | planning.data.gov.uk |
| Households living in a house | 75.3 % of households living in a house or bungalow (detached, semi-detached or terraced) | Census 2021 | nomisweb.co.uk |
| DMPO 2015 art 37(2)(a): householder appeal, from the date of the decision notice | 12 weeks | — | legislation.gov.uk |
A blank value means the figure has not been published, not that there are none. Check your own address with the council.
Which application your project needs
The usual route for a house; flats and listed buildings follow other rules.
- A · Lawful Development Certificate decision
- 8 weeks
- B · Prior approval decision
- 42 days
- C · Householder decision
- 8 weeks
The Design Guide and the Bexley Local Plan
Bexley's householder guidance is in two parts, the Design Guide SPD Part 1: Design Principles for principles and the Design Guide SPD Part 2: Building Alterations and Extensions for extensions. The Local Plan is the Bexley Local Plan, adopted in 2,023. A refusal commonly names a policy in the plan and a section of the design guide, and the guide's treatment of extensions is where many householder arguments sit.
The borough is largely suburban, with 75.3 per cent of households in a house or bungalow, and a terraced home averaging £416,198. Disputes here can therefore concern two-storey side extensions that run to the boundary, deep rear additions and roof changes that alter the character of a street of similar semis.
Heritage is a smaller part of the picture: 23 conservation areas and 114 list entries. Where one of them is involved, a refusal may mention it, and we deal with that point separately and early.
Appeal deadlines and typical timescales
A householder appeal must be made within 12 weeks of the decision notice. Householder cases decided by written representations had a national median of 11.6 weeks in the Inspectorate's latest statistics, and the all-case written-representation median over twelve months was 18 weeks.
Those are national medians for cases that finished. They give a sense of scale and nothing more, so plan on months and avoid starting any building work meanwhile.
Our approach to a Bexley appeal
We begin with the officer's report, which explains the refusal more fully than the notice. We note each policy cited and test whether it applies, then check the measurements in the report against your drawings.
The statement answers every reason in turn. Where the dispute is about bulk, we draw the proposal in section against the neighbour's windows and show the roof from the street. For a side extension we show the gap to the boundary and the rhythm of the street with a continuous elevation.
A second chartered technologist reads the whole bundle and every sheet comes from a single model. Our planning drawings page describes the working method.
What we need from you to start
Send the decision notice, the officer's report, the plans that were refused and the dates on which each was issued. If you have the neighbours' letters from the council's website, send those as well. We also ask for photographs of the front and rear of the house and of the two neighbouring properties, taken from the street and from your garden.
From those we can tell you within a short time whether the refusal can be met by a revised application, whether an appeal looks sensible, or whether another route fits the project better. The conversation costs nothing, and the quote that follows is fixed.
Appeal, reapply or use a different route
Where a single feature caused the refusal, a revised scheme can be lodged faster than an appeal can be decided. Where the guidance was applied too rigidly, an appeal is justified. Work that needed no permission can be shown lawful with a Lawful Development Certificate, and some deeper rear extensions suit prior approval.
Our Bexley architectural drawings page gives the borough's wider context. We price each route in writing, you choose, and the outcome is for the inspector to decide, so no result can be promised.
What you receive


Related pages
Other services in Bexley
Questions
Why was my Bexley householder application refused when most are granted?
The council granted 94.6 per cent of 877 householder decisions in the latest year, so the officer will have cited a particular concern. The report shows which.
Which Bexley guidance covers extensions?
The Design Guide SPD Part 2: Building Alterations and Extensions, with the Design Guide SPD Part 1: Design Principles behind it.
How long do I have to appeal?
12 weeks from the date of the decision notice.
Are there many conservation areas in Bexley?
The council publishes 23 conservation areas. We check your address for that and for listing.
Sources and dates
- assets.publishing.service.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- planning.data.gov.uk, retrieved
- nomisweb.co.uk, retrieved
- legislation.gov.uk, retrieved
- assets.publishing.service.gov.uk, retrieved
- bexley.gov.uk, retrieved
- bexley.gov.uk, retrieved
- publicdata.landregistry.gov.uk, retrieved
- gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- legislation.gov.uk, retrieved
- Contains public sector information licensed under the Open Government Licence v3.0.
- Contains OS data © Crown copyright and database right 2026.
- Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
- Contains Historic England data © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Tell us about your property.
We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.