020 7864 7245Request a fixed quote

Camden, London

Basement impact assessment in Camden

Every new or enlarged basement in Camden needs a basement impact assessment, built in five stages from screening to the council's own review. The requirement sits in the council's local validation list, with design guidance in its Basements CPG (Camden Planning Guidance). We coordinate the report on a fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on basement impact assessments

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Pencil resting on a dimensioned technical drawing beside a scale rule

    The Camden basement impact assessment, stage by stage

    The requirement is set by the council's list of local application requirements, with guidance in the Basements CPG (Camden Planning Guidance) under the Camden Local Plan, adopted in 2,017. In short, the rule is: all new or enlarged basements; 5 stages.

    Stage one is screening. Anything flagged moves to stage two, scoping, where the specialist studies are defined. Stage three is the site investigation and study. Stage four is the impact assessment itself, and stage five is the council's review and decision.

    Two practical points follow. The report must be written by suitably qualified professionals and carry a non-technical summary a neighbour can read, and the council's pro forma headings should be used so the officer finds each answer where they expect it.

    Rows of brick terraced houses and gardens on a residential street

    Local figures for Camden

    Figures with their unit, period and source
    MeasureValuePeriodSource
    A Basement Impact Assessment is required for all developments with new or enlarged basements: prepared by suitably qualified professionals with a non-technical summary; stages 1 screening, 2 scoping, 3 site investigation and study, 4 impact assessment, 5 review and decision. The council's BIA pro forma headings should be used.all new or enlarged basements; 5 stages—camden.gov.uk, Camden Local Area Requirements for Planning Applications 2025, p.20, 'Basement Impact Assessment (BIA)'; p.21
    Conservation areas40 named conservation areas published by the council—planning.data.gov.uk
    Article 4 directions21 Article 4 directions published by the council—planning.data.gov.uk
    Listed building entries1,971 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Householder applications granted89.1 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder applications decided in time77.7 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Householder appeals allowed35.5 % of householder appeals alloweddecision dates 1 Jul 2021 to 30 Jun 2026assets.publishing.service.gov.uk
    Households living in a house13.3 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Supplementary planning documentBasements CPG (Camden Planning Guidance)2021camden.gov.uk
    Party Wall etc. Act 1996 s6(1): excavation within 3 m horizontally of an adjoining owner's building or structure and deeper than the bottom of its foundations3 m—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Camden
    Which application your project needsLawful Development Certificate decision: 8 weeks. Prior approval decision: 42 days. Householder decision: 8 weeksYour projectWithin permitted development?Lawful Development CertificatePrior approvalHouseholder applicationYesLarger rear extensionNoABC

    Which application your project needs

    The usual route for a house; flats and listed buildings follow other rules.

    A · Lawful Development Certificate decision
    8 weeks
    B · Prior approval decision
    42 days
    C · Householder decision
    8 weeks

    Camden's heritage, trees and neighbours

    Camden has 40 conservation areas, 21 Article 4 directions and 1,971 listed entries, with 1,746 at Grade II. The borough is dense with terraces of exactly the age and type where a basement is proposed, so the heritage case sits beside the ground report on almost every job.

    Only 13.3 per cent of households live in a house, and 29.7 per cent own their home, so a basement is usually a single-household scheme in a street of flats, shared freeholds or leaseholds. Flat owners also need the freeholder's consent, and that conversation takes time.

    Heritage at Risk lists 35 entries in the borough. Where a property is on or beside one, we flag it at the free check.

    The practical effect is that Camden basements are rarely simple. A house in a conservation area needs the front elevation, the lightwell and any new railings drawn to a standard a conservation officer will read closely, while the engineer designs retaining walls that must not disturb the neighbours' foundations on either side. We keep both threads on one set of sheets, so the design that satisfies the ground study is the same design the heritage officer sees.

    What the decision statistics show

    Camden decided 394 householder applications in its latest year and granted 89.1 per cent. Only 77.7 per cent were decided in time, which is a reminder to plan a long programme.

    The Planning Inspectorate decided 76 householder appeals against the borough and allowed 35.5 per cent. The sample is small, and it covers all householder work, not only basements.

    A five-stage assessment is slower than a drawing set. The site investigation needs a drilling slot and, often, a monitoring period, so we put the ground study at the start of the programme, not after the planning drawings are done.

    We also help owners prepare the non-technical summary. It should say, in plain words, how deep the basement goes, how the neighbours' walls will be protected during the dig, where the water goes, and what will be monitored. A summary a neighbour can follow can reduce objections, and objections slow any application.

    Party wall, levy and Building Regulations in Camden

    In streets of terraces, most basements trigger the Party Wall etc. Act. Excavation within 3 metres of an adjoining building that goes deeper than its foundations needs a notice, as does a dig within 6 metres on the diagonal test. The notice must be served at least 1 month before work.

    The mayoral Community Infrastructure Levy for Camden is 96.97 pounds per square metre for permissions granted this year, and a large new basement can be liable. The borough's own schedule is the London Borough of Camden Community Infrastructure Levy Charging Schedule.

    Building Regulations require drainage where the water table can rise within 0.25 metres of the lowest floor.

    Price and next steps

    There is no list price, because the scope depends on the site. After the free check you get a fixed quote, and the planning drawings in Camden we produce carry the sections the assessment relies on.

    The borough overview is architectural drawings in Camden. Next door, Westminster works from numeric limits instead of a staged method, and the national rules are on the basement impact assessment hub.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Georgian brick terrace with sash windows, arched fanlight doorways, stone steps and iron railings in London
    The street around you
    Move across the plinth — the blocks rise around the pointer.

    Questions

    Does every basement in Camden need an assessment?

    Yes. The council requires one for all developments with new or enlarged basements, prepared by suitably qualified professionals and with a non-technical summary.

    What are the five stages?

    Screening, scoping, site investigation and study, impact assessment, and review and decision by the council.

    How long does it take?

    Longer than a drawing set. The site investigation needs a drilling slot and sometimes monitoring, so we start it first.

    What does it cost?

    A fixed quote after a free constraints check, because depth, ground conditions and heritage change the scope.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.