020 7864 7245Request a fixed quote

Newham, London

Biodiversity net gain plans in Newham

Newham asks for a biodiversity statement with every proposal for new residential housing, and mandatory net gain applies to full and outline applications and to minor material amendments under section seventy-three. A householder extension is exempt, but a new home is not, and it must finish 10 per cent better than it began. We prepare the statement and the plan on a fixed quote after a free constraints check.

Fixed quote after a free constraints check

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, VAT included

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Architectural model of a four-storey London stucco townhouse in its terrace, with a portico, area railings, sash windows, a cornice and chimney stacks
    The house as it stands: four storeys over a lower ground floor.Existing Proposed worksAn illustrative model, built for this page.

    How we work on biodiversity net gain plans

    Seven steps from first call to approval.

    The same model cut through the middle: every floor, the stair, the chimney breasts, the new mansard, rear extension and basement in section
    Section through the model: every floor on one datum.
    1. Enquiry and constraints check

      We check the property against conservation areas, listed status, Article 4 directions, tree preservation orders, flood zone and planning history. We choose the right route and send a fixed quote.

    2. Measured survey

      We survey the house on one datum: rooms, levels, boundaries, drains, trees and the neighbours' windows that the 45° and 25° tests depend on.

    3. Design options

      We model the house in Revit and show you options in 3D and plan, with the planning strategy and the precedents in your street.

    4. Design frozen

      You choose an option in writing. Nothing changes after this without your say.

    5. Independent check

      A second chartered technologist checks every sheet against the council's validation checklist and the policy. A senior review signs it off before anything is submitted.

    6. Submission

      We prepare the forms, certificates, fee and documents and submit through the Planning Portal.

    7. Officer liaison

      We answer the planning officer and make any amendments within five working days, at no charge until approval.

    Free redraws until approval. Every drawing set is checked independently, and the checker is never the person who drew it.

    Request a fixed quote
    Pencil resting on a dimensioned technical drawing beside a scale rule

    Newham's statement thresholds

    The council summarises its requirement as Statement thresholds: new housing, 500 sqm GIA, majors. Mandatory net gain applies to all full and outline applications, and to section seventy-three minor material amendments. A biodiversity statement is needed for all new residential housing, non-residential schemes over the floor-area threshold and all major applications.

    The amendment point catches people out. A scheme already permitted, then varied to add a storey or change a layout, can bring the gain condition back in if the variation is a minor material amendment, so we check the original decision notice before advising.

    For one new house the statement is proportionate, but it must be there at submission, because the council lists it among its application requirements.

    The threshold wording matters. The council lists new residential housing as a trigger on its own, regardless of size, so even a single flat added to an existing building is within scope if it is new housing. We read the scope against the exact proposal before deciding how long the statement needs to be.

    Rows of brick terraced houses and gardens on a residential street

    Local figures for Newham

    Figures with their unit, period and source
    MeasureValuePeriodSource
    Mandatory BNG applies to all full and outline applications and s73 minor material amendments; Biodiversity Statement required for all new residential housing proposals, non-residential above 500 sqm GIA and all majors.Statement thresholds: new housing, 500 sqm GIA, majors—newham.gov.uk, Newham Planning Application Requirements (December 2024), p.5
    Households115,507Census 2021 (21 March 2021)nomisweb.co.uk
    Households living in a house47.1 % of households living in a house or bungalow (detached, semi-detached or terraced)Census 2021nomisweb.co.uk
    Domestic gardens share of land (GLUD 2005)16.9 % of land that is domestic garden (GLUD 2005)2005data.london.gov.uk
    Green Belt share of the council area2 % of council area covered by green-belt polygons—planning.data.gov.uk
    Conservation areas9 named conservation areas published by the council—planning.data.gov.uk
    Listed building entries125 list entries (Historic England, within the LPA boundary)—planning.data.gov.uk
    Minor applications granted78.9 %1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor application decisions407 decisions1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Minor applications decided in time92.6 % decided within 8 weeks or an agreed extended period1 July 2025 - 30 June 2026assets.publishing.service.gov.uk
    Environment Act 2021 Sch 14 para 2, inserting Sch 7A TCPA 1990: 'relevant percentage' 10%10 %—legislation.gov.uk
    'Developments of 0.2 hectares or below': from 6 August 2026 BNG does not apply where the site area within the red line boundary is 0.2 ha or below0.2 ha—gov.uk
    Sch 7A para 9(3) as inserted: enhancement maintained for at least 30 years after completion30 years—legislation.gov.uk

    A blank value means the figure has not been published, not that there are none. Check your own address with the council.

    Councils bordering Newham
    Which application your project needsLawful Development Certificate decision: 8 weeks. Prior approval decision: 42 days. Householder decision: 8 weeksYour projectWithin permitted development?Lawful Development CertificatePrior approvalHouseholder applicationYesLarger rear extensionNoABC

    Which application your project needs

    The usual route for a house; flats and listed buildings follow other rules.

    A · Lawful Development Certificate decision
    8 weeks
    B · Prior approval decision
    42 days
    C · Householder decision
    8 weeks

    A borough of flats, few houses and a Green Belt sliver

    Newham has 115,507 households, and only 47.1 per cent live in a house. Gardens cover 16.9 per cent of land, and Green Belt covers only 2 per cent of the borough.

    The habitat on a typical site is therefore modest: a yard, a strip of lawn, perhaps a self-seeded tree on a vacant plot. A low baseline makes the gain easier to reach on site, and a few new trees or a biodiverse roof can do it.

    The borough has 9 conservation areas and 125 listed building entries, so we check heritage before proposing planting that touches a protected frontage.

    On a vacant yard or former workshop site, the baseline is often a mix of bare ground and ruderal vegetation, which scores lower than most owners expect. That is good news for the gain, as long as the baseline is recorded before any clearance, so we photograph and date the site at the first visit.

    Exemptions that apply to Newham homeowners

    Householder extensions, loft conversions and permitted development are exempt, as is a new home on a site of 0.2 hectares or less where no priority habitat is affected. Newham will still want the biodiversity statement for new housing, so the exemption removes the metric but not the paperwork.

    Smaller impacts, under 25 square metres of habitat, are de minimis. On an inner-borough plot that is often the case, which is why the first step is a measured site plan.

    When a plan is required, the gain is maintained for at least 30 years, and we write that into the maintenance notes.

    Do not clear or pave a plot to make the numbers easier. The statutory approach looks at the habitat present before work began, and recent clearance can be treated as lowering the baseline, which removes the benefit and risks the application.

    How decisions run and how we prepare the file

    Minor applications are granted 78.9 per cent of the time across 407 decisions, and 92.6 per cent are decided in time. A missing statement would stop validation, so we prepare it with the drawings.

    Our new build drawings include the landscape and roof layout, and our flat conversion drawings cover the common case in the borough where a house becomes flats. If the scheme is varied after permission, we review the amendment route first.

    If permission is already granted and the design changes, tell us the decision date and condition numbers first. We will check whether the change is a minor material amendment and whether the gain condition applies to it, before you pay for new drawings.

    Price and next step

    There is no list price, because the work depends on the habitat parcels. You receive a fixed quote after a free constraints check.

    Send the address, the permission reference if there is one and what you plan to change. We will say whether Newham needs a statement, a plan or neither.

    What you receive

    Planning drawing sheet for a rear extension with plans, elevations and sections
    Sample drawing. Planning drawings for a rear extension: plans, elevations and sections on one sheet set.
    Georgian brick terrace with sash windows, arched fanlight doorways, stone steps and iron railings in London
    The street around you
    Move across the plinth — the blocks rise around the pointer.

    Questions

    Does Newham need a biodiversity statement for one new house?

    Yes. Its application requirements list a statement for all new residential housing.

    Does a section seventy-three amendment bring the condition back?

    It can, for minor material amendments, since mandatory net gain applies to those as well.

    Is a house extension exempt?

    Yes, householder applications are exempt from the gain condition.

    What gain is required?

    At least 10 per cent, kept for at least 30 years.

    Sources and dates

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.