020 7131 9703Request a fixed quote
Bright modern extension interior with a large glazed wall, dining table and seating facing the garden

Blog: building regulations

How much do SAP calculations cost in London?

A SAP and Part L energy calculation for a London extension or new home costs £225 from us, with no VAT to add, coordinated with an assessor and fitted to your drawings. Whether you need one at all depends on how you choose to meet the energy rules, and for many extensions the answer is no.

From £225 total

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, no VAT to add

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Key takeaways

    What the calculation costs

    Our fee is £225. We coordinate the calculation with an assessor and fit it to your drawings, so the result describes the building you will actually build. See our SAP calculations page for what we need from you.

    The fee is small next to the cost of getting it wrong. An extension that fails the energy rules on the day the inspector visits means redesign during the build. A calculation done at the drawing stage shows the problem while a line on a plan can still fix it.

    What the fee includesA check of which energy route your design can use; SAP and Part L calculation coordinated with an assessor; The result fitted to your drawings; A plain summary for your builder; Issued for your building control bodyWhat the fee includesA check of which energy route yourdesign can useSAP and Part L calculation coordinatedwith an assessorThe result fitted to your drawingsA plain summary for your builderIssued for your building control bodyFixed fee from £225, no VAT to add
    What our SAP and Part L service includes.

    Three routes for an extension, and only one is a calculation

    The energy guidance for the Building Regulations gives an extension three ways to comply. The first is to meet fixed limits on each element and on glazing. The second is to average the U-values across the elements by area. The third is the calculation: SAP may be used to show the dwelling and proposed extension do no worse than the dwelling plus a notional extensionApproved Document L, Volume 1, 2021 edition, paragraph 10.10.

    Most London extensions use the first route because it needs no assessor. The limits are plain: roof 0.15, wall 0.18, floor 0.18 and window 1.4 W/(m²·K)Approved Document L, Volume 1, 2021 edition, table 4.2. If the design can meet them, a calculation is not needed. That is a reason to choose the insulation thickness at the start, and our building regulations drawings show the build-up.

    A bright white kitchen with a rooflight above and glazed doors to the garden
    Rooflights and glazed doors count towards the glazing allowance for an extension. Photo: eosrooflights, CC BY 2.0

    Glass is what pushes a design to calculation

    The usual reason a calculation is needed is glass. no more than 25% of the extension floor area, plus any openings lost to the extensionApproved Document L, Volume 1, 2021 edition, section 10. A kitchen extension with a wall of bifold doors and a large rooflight can pass that limit easily.

    The calculation lets you keep the glass by balancing it against something else, such as better insulation or a more efficient heating system. That can be cheaper than reducing the glazing, and it keeps the design you wanted. We tell you at the drawing stage which side of the line you are on.

    New homes and conversions

    A new home is always assessed by calculation. Targets are set from a notional dwelling, and the calculation shows whether the design beats them. The guidance also limits glazing in a newly created dwelling: not more than 25% of the total floor areaApproved Document L, Volume 1, 2021 edition, section 11. A conversion that creates a new home is treated the same way.

    That makes SAP part of the design from the start for a new build or flat conversion. See our new build drawings page, and the cost post for new build drawings.

    How the job runs, step by stepSend us your drawings or order them first Then: We check which energy route your design can use Then: Details collected for walls, roof, floor and glazing Then: Calculation run with an assessor Then: Result fitted to the drawings Then: Issued for your building control bodySend us your drawings or order themfirstWe check which energy route yourdesign can useDetails collected for walls, roof,floor and glazingCalculation run with an assessorResult fitted to the drawingsIssued for your building control body
    From drawings to a calculation your building control accepts.

    How it fits with the rest of the job

    The calculation reads from the drawings, so it goes after them and before building control. Remember that building regulations approval is different from planning permission, and you might need bothGOV.UK, Building regulations approval, so a planning permission or certificate does not cover this step. We can put the calculation into the same package as the building regulations drawings.

    If the design changes later, the calculation may need rerunning. Tell us early when you change the glazing, since that is the number that moves the result most.

    The figures, with sources

    Limiting U-values for new elements in existing homes
    roof 0.15, wall 0.18, floor 0.18 and window 1.4 W/(m²·K)Approved Document L, Volume 1, 2021 edition, table 4.2Checked 25 October 2026
    Glazing allowance in an extension
    no more than 25% of the extension floor area, plus any openings lost to the extensionApproved Document L, Volume 1, 2021 edition, section 10Checked 25 October 2026
    SAP route for an extension
    SAP may be used to show the dwelling and proposed extension do no worse than the dwelling plus a notional extensionApproved Document L, Volume 1, 2021 edition, paragraph 10.10Checked 25 October 2026
    Openings in a newly created dwelling
    not more than 25% of the total floor areaApproved Document L, Volume 1, 2021 edition, section 11Checked 25 October 2026
    Building regulations and planning
    building regulations approval is different from planning permission, and you might need bothGOV.UK, Building regulations approvalChecked 25 October 2026

    Questions

    Does every extension need a SAP calculation?

    No. An extension that meets the fixed limits on each element and on glazing does not need one. We tell you at the drawing stage whether yours does.

    Do I need an energy certificate as well?

    That depends on the project and is a separate document from the SAP calculation. Ask us and we will say what applies to yours.

    Can you change the design to avoid the calculation?

    Often, by reducing glass or adding insulation. Whether that is better than keeping the design and running the calculation is your choice, and we set out both.

    How long does it take?

    It depends on the assessor and on how complete your drawings are. We confirm the time when we quote.

    Header photo: A bright modern extension interior with a large glazed wall, dining table and seating facing the garden by Max Vakhtbovych, Pexels License.

    The fixed fee for sap calculations

    Fixed fee
    from £225
    Total you pay
    from £225
    Council fee
    paid to the council separately

    No VAT to add. The fee is fixed in writing after a free constraints check of your address.

    What you get

    • A check of which energy route your design can use
    • SAP and Part L calculation coordinated with an assessor
    • The result fitted to your drawings
    • A plain summary for your builder
    • Issued for your building control body
    • More about our sap calculations
    Brick house under construction with a large new opening in the rear wall spanned by a steel beam

    Building regulations

    How much do building regulations drawings cost in London?

    Building regulations drawings are one fixed fee, and the building control charge is a second bill paid to the council or a private inspector. Here is how both work, with a real London figure.

    From £7294 minute read

    Glazed double doors in a new blockwork rear extension, with a scaffold tower and a wheelbarrow on the unfinished floor

    Building regulations

    How much do construction drawings cost in London?

    Construction drawings are the set a builder prices and builds from, one step past the planning set. Here is what they cost, what they add, and how they protect a London project from quote creep.

    From £9693 minute read

    Single-storey rear extension in grey blockwork under construction with a steel beam spanning the new opening in the old rear wall

    Building regulations

    How much do structural calculations cost in London?

    Any time a wall is opened up or a floor is added, someone has to prove the steel is big enough. Here is what calculations cost, what they cover and when building control asks for them.

    From £3853 minute read

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.