How much do construction drawings cost in London?

A construction and tender drawing package for a London project costs £969 from us, with no VAT to add. It is the set a builder prices and builds from, drawn to a level of detail that planning drawings never reach, and the reason is practical: builders who quote from the same detailed drawings give quotes you can compare.

From £969 total

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, no VAT to add

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Key takeaways

    What the package costs, and what it replaces

    Our fee is £969. It is a larger piece of work than planning or building regulations drawings, because it covers every junction, level and finish a builder needs. See our construction drawings page for the list, which lists the dimensions, junction details and fittings it covers.

    What it replaces is guesswork. A builder pricing from planning drawings must interpret them and add allowances for what is not shown. Two builders interpret differently, and the quotes cannot be compared. A tender set removes that gap.

    What the fee includesDimensioned plans, sections and junction details; Stair, window and insulation details; Service routes shown; Checked by a second person; Issued in a form builders can tender againstWhat the fee includesDimensioned plans, sections and junctiondetailsStair, window and insulation detailsService routes shownChecked by a second personIssued in a form builders can tenderagainstFixed fee from £969, no VAT to add
    What a construction and tender package includes.

    The detail that planning drawings leave out

    The Building Regulations set numbers that must be met in the built work, and the drawings have to show how. A private staircase, for example: rise 150 to 220 mm, going 220 to 300 mm, and a maximum pitch of 42 degreesApproved Document K, 2013 edition, table 1.1. Whether a staircase fits a loft depends on those figures, and the set shows the exact arrangement.

    The same goes for energy. New elements in an existing home have to meet limits: roof 0.15, wall 0.18, floor 0.18 and window 1.4 W/(m²·K)Approved Document L, Volume 1, 2021 edition, table 4.2. A construction set names the build-up of each wall, roof and floor that achieves them, so the builder orders the right thickness of insulation first time.

    Brick house under construction with a large new opening in the rear wall spanned by a steel beam
    A new opening is shown with its beam, bearings and finishes, so the builder can price it exactly. Photo: Brett Jordan, Pexels License

    Who is responsible for what

    The Building Regulations put duties on the people who design and build. anyone doing design or building work must have the skills, knowledge, experience and behaviours neededBuilding Regulations 2010, regulation 11F. Drawings that are clear and complete are how a designer shows that, and how a builder knows what is expected.

    For a private home the rules also move the client's duties to others: the contractor carries out a domestic client's duties where there is only one contractorBuilding Regulations 2010, regulation 11C. That is another reason to give the builder a complete set; it makes the builder's job, which includes those duties, definable.

    How tendering saves money

    A tender is a request for fixed prices from several builders against the same drawings. It works only when the drawings are complete, because every gap becomes a provisional sum, and provisional sums are where final bills grow. Our package is built for it: the dimensioned plans, sections and junction details, and the stair, window and insulation details.

    We do not choose your builder or quote their work. You compare the returns, ask them questions against the drawings, and appoint whom you like. If you want to check a builder's drawings or specification instead, our independent drawing review is a separate service.

    How the job runs, step by stepSend the approved design, or order the planning set first Then: Details drawn for every junction, level and finish Then: Stair, window and insulation details drawn Then: Package checked by a second person Then: Issued for tender to your builders Then: Questions answered against the drawingsSend the approved design, or order theplanning set firstDetails drawn for every junction,level and finishStair, window and insulation detailsdrawnPackage checked by a second personIssued for tender to your buildersQuestions answered against thedrawings
    From survey to a drawing set ready to tender.

    What to have in place first

    The construction set builds on an approved design. If you have planning permission or a certificate, send us the decision and the drawings. If not, our planning drawings come first, and the building regulations drawings after them. Structural calculations are a separate item, from £385. Building control then has five weeks, or longer if agreed in writingBuilding Regulations 2010, regulation 14A to answer a full plans application.

    If the design changes after the package is issued, tell us early. A small change costs little before the tender and a lot after the builder has started.

    The figures, with sources

    Private stair rise, going and pitch
    rise 150 to 220 mm, going 220 to 300 mm, and a maximum pitch of 42 degreesApproved Document K, 2013 edition, table 1.1Checked 25 October 2026
    Limiting U-values for new elements in existing homes
    roof 0.15, wall 0.18, floor 0.18 and window 1.4 W/(m²·K)Approved Document L, Volume 1, 2021 edition, table 4.2Checked 25 October 2026
    Competence of designers and builders
    anyone doing design or building work must have the skills, knowledge, experience and behaviours neededBuilding Regulations 2010, regulation 11FChecked 25 October 2026
    Duties of a domestic client
    the contractor carries out a domestic client's duties where there is only one contractorBuilding Regulations 2010, regulation 11CChecked 25 October 2026
    Time for the council to decide a full plans application
    five weeks, or longer if agreed in writingBuilding Regulations 2010, regulation 14AChecked 25 October 2026

    Questions

    Do I need construction drawings as well as building regulations drawings?

    Building regulations drawings show building control that the design complies. Construction drawings show a builder how to build it, in more detail. For a simple job, one set may serve both, and we say so after the constraints check.

    Do you choose the builder?

    No. You choose, and you can use the package to compare quotes. We answer builders' questions against the drawings.

    Does the package include structural design?

    Structural calculations are a separate item. The construction set shows the structure from them.

    How long does it take?

    It depends on the size of the job, and we confirm it after the constraints check. We do not promise a date before we have seen the project.

    Header photo: Glazed double doors in a new blockwork rear extension with scaffold tower and a wheelbarrow on the unfinished floor by Brett Jordan, Pexels License.

    The fixed fee for construction drawings

    Fixed fee
    from £969
    Total you pay
    from £969
    Council fee
    paid to the council separately

    No VAT to add. The fee is fixed in writing after a free constraints check of your address.

    What you get

    • Dimensioned plans, sections and junction details
    • Stair, window and insulation details
    • Service routes shown
    • Checked by a second person
    • Issued in a form builders can tender against
    • More about our construction drawings
    Brick house under construction with a large new opening in the rear wall spanned by a steel beam

    Building regulations

    How much do building regulations drawings cost in London?

    Building regulations drawings are one fixed fee, and the building control charge is a second bill paid to the council or a private inspector. Here is how both work, with a real London figure.

    From £7294 minute read

    Bright modern extension interior with a large glazed wall, dining table and seating facing the garden

    Building regulations

    How much do SAP calculations cost in London?

    Many extensions pass the energy rules with no calculation at all. When one is needed, it costs less than most people expect. Here is how to tell if your project needs it, and what we charge.

    From £2253 minute read

    Single-storey rear extension in grey blockwork under construction with a steel beam spanning the new opening in the old rear wall

    Building regulations

    How much do structural calculations cost in London?

    Any time a wall is opened up or a floor is added, someone has to prove the steel is big enough. Here is what calculations cost, what they cover and when building control asks for them.

    From £3853 minute read

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.