020 7131 9703Request a fixed quote
Semi-detached house on a London street wrapped in scaffolding and white sheeting while a loft conversion is built on its roof

Blog: building regulations

How much does a regularisation certificate cost in London?

A regularisation certificate costs two things: the council's regularisation charge, which most London councils set a little above their Building Notice charge, and the survey and drawings the application needs. Our part is fixed at £629 drawings + £200 survey (£829 total); the council's charge depends on the work, and Richmond upon Thames, for example, asks £1,069London Borough of Richmond upon Thames for an extension under forty square metres.

From £829 total, survey included

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, no VAT to add

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Key takeaways

    • The council's charge and our fee are separate bills: the charge goes to the council, never through us.
    • Councils usually price regularisation off the Building Notice charge: Richmond at 120% of the Building Notice charge, with no VATLondon Borough of Richmond upon Thames, Hounslow at the Building Notice charge (excluding VAT) plus 20%, with no VATLondon Borough of Hounslow.
    • Our survey, as-built drawings and application cost £629 drawings + £200 survey (£829 total), fixed before we start.
    • Any upgrade the inspector asks for, such as a fire door or more insulation, is building work priced by your builder.
    • The council can still order changes to unapproved work for 10 yearsBuilding Act 1984, section 36(4) after it is finished, so waiting rarely saves money.

    The two bills behind a regularisation certificate

    Owners often expect one price and are surprised to get two. The first is the council's: building control charges for checking work that was never notified, and the certificate is only issued once that charge is paid. The second is for the evidence: a survey of what was built and drawings that show it, because the council cannot judge work it has never seen on paper.

    Regulation 18 of the Building Regulations 2010 sets the evidence out. The application needs a description of the work and, so far as reasonably practicable, a plan of it and a plan of any additional work requiredBuilding Regulations 2010, regulation 18(2). That second plan is where the money goes: it is the list of changes needed to bring the work up to standard, and it is only as good as the survey behind it.

    What the job costs: our fee from £829Drawings: £629. Measured survey: £200. Richmond regularisation charge, extension under 40 m²: £1,069 (paid to others)Drawings£629Measured survey£200Richmond regularisation charge, extensionunder 40 m²£1,069Total to us, from £829; other costs are paid direct
    Our fixed fee beside a council's regularisation charge for a small extension. The council's charge is paid to the council and varies by borough and by job.

    How London councils set the regularisation charge

    There is no national price list. Each council publishes its own building control charges, and the regularisation line is usually a percentage of the Building Notice charge for the same job. Richmond upon Thames uses 120% of the Building Notice charge, with no VATLondon Borough of Richmond upon Thames. Hounslow's rule is the Building Notice charge (excluding VAT) plus 20%, with no VATLondon Borough of Hounslow. Havering describes its charge as exempt from VAT but subject to a 20% uplift, so the total equals the other charges for the same workLondon Borough of Havering.

    Turned into money, Richmond's 2026 tables give £1,069London Borough of Richmond upon Thames for an extension under forty square metres and £1,050London Borough of Richmond upon Thames for a loft conversion of the same size. Other boroughs land in the same region, though bigger or more complicated jobs are often priced individually, so ask your council for its figure before you budget.

    One practical point: the charge is per application, so two unrelated jobs on the same house, say a loft from one decade and a kitchen knock-through from another, may each need their own.

    What our fee covers, and what it does not

    Our fee is fixed at £629 drawings + £200 survey (£829 total) for a typical house: the measured survey of the work as it stands, existing and as-built drawings, a written specification of the likely upgrades, and the application itself. Our regularisation drawings page lists every item.

    Two things sit outside it. Structural calculations, where a beam or an opening was never designed, are priced separately from £385. And the upgrade work itself, whether a new fire door, a mains-wired smoke alarm or extra roof insulation, is done by your builder. We list it before you apply so you can get it priced in advance.

    Row of Victorian brick terraced houses with a central bay window and front hedges on a street in Waltham Forest
    London terraces like these often carry decades of alterations, and not every one was signed off by building control. Photo: sludgegulper, CC BY-SA 2.0

    What happens between the survey and the certificate

    Most of the cost risk lies in the inspection. The council may require laying the work open for inspection, making tests and taking samplesBuilding Regulations 2010, regulation 18(3). The more precisely the drawings say where the joists, the steel bearings and the fire protection are, the fewer holes the surveyor needs, and the less making good you pay for afterwards.

    The steps below are the order we work in. Nothing is submitted until you have seen the list of likely upgrades and decided to go ahead.

    How the job runs, step by stepFree constraints check of your address and a fixed quote Then: Measured survey of the work as it stands Then: As-built drawings and a list of likely upgrades, sent to you first Then: Application prepared and sent to the council with its charge Then: Building control inspection, with only the marked areas opened up Then: Upgrades done by your builder, then the certificate is issuedFree constraints check of your addressand a fixed quoteMeasured survey of the work as itstandsAs-built drawings and a list of likelyupgrades, sent to you firstApplication prepared and sent to thecouncil with its chargeBuilding control inspection, with onlythe marked areas opened upUpgrades done by your builder, thenthe certificate is issued
    From survey to certificate: the order of work on a typical London regularisation job.

    Is it worth paying for, or can you wait it out?

    Waiting rarely saves anything. The council's power to order unapproved work to be altered or removed now runs for 10 yearsBuilding Act 1984, section 36(4) from completion under section 36 of the Building Act 1984, and the problem resurfaces with every sale. GOV.UK's own advice is blunt: without approval you will not have the certificates of compliance you may need when you want to sell your homeGOV.UK.

    Some buyers will accept an indemnity policy in place of a certificate, and some lenders will not. That is a question for your solicitor. A certificate is the one route that settles the building control question itself, and it covers only work carried out on or after 11 November 1985Building Regulations 2010, regulation 18.

    If the work also needed planning permission, regularisation does not fix that part. Our guide to a retrospective planning application covers the planning side.

    The figures, with sources

    Work a regularisation certificate can cover
    work carried out on or after 11 November 1985Building Regulations 2010, regulation 18Checked 24 October 2026
    What the application must include
    a description of the work and, so far as reasonably practicable, a plan of it and a plan of any additional work requiredBuilding Regulations 2010, regulation 18(2)Checked 24 October 2026
    What the council may require
    laying the work open for inspection, making tests and taking samplesBuilding Regulations 2010, regulation 18(3)Checked 24 October 2026
    Time limit for a removal or alteration notice
    10 yearsBuilding Act 1984, section 36(4)Checked 24 October 2026
    Richmond regularisation charge, extension under 40 m²
    £1,069London Borough of Richmond upon ThamesChecked 24 October 2026
    Richmond regularisation charge, loft conversion under 40 m²
    £1,050London Borough of Richmond upon ThamesChecked 24 October 2026
    How Richmond sets the regularisation charge
    120% of the Building Notice charge, with no VATLondon Borough of Richmond upon ThamesChecked 24 October 2026
    How Hounslow sets the regularisation charge
    Building Notice charge (excluding VAT) plus 20%, with no VATLondon Borough of HounslowChecked 24 October 2026
    How Havering sets the regularisation charge
    exempt from VAT but subject to a 20% uplift, so the total equals the other charges for the same workLondon Borough of HaveringChecked 24 October 2026
    Selling without approval
    without approval you will not have the certificates of compliance you may need when you want to sell your homeGOV.UKChecked 24 October 2026

    Questions

    Does the council charge VAT on regularisation?

    The councils we checked do not: Richmond sets the charge at 120% of the Building Notice charge, with no VATLondon Borough of Richmond upon Thames, and Hounslow at the Building Notice charge (excluding VAT) plus 20%, with no VATLondon Borough of Hounslow. Our own fee has no VAT to add either.

    Can I get my money back if the council refuses the certificate?

    Council charges are usually not refundable, so check your council's terms before you apply. Our survey and drawings are designed to show the inspector exactly what is there, which is the surest way to avoid a wasted application.

    How long does regularisation take?

    The survey and drawings usually take a couple of weeks. The council's part depends on its workload and on how quickly the upgrades are done; we cannot promise a decision date, and nobody honest can.

    Is regularisation cheaper than a normal building regulations application?

    Usually not: the councils we checked charge a premium over the Building Notice charge for the same work, and there may be opening-up and upgrade costs too. Approving work before it starts is always the cheaper route.

    Header photo: A loft conversion on Dallinger Road - geograph.org.uk - 4211470 by Bill Boaden, CC BY-SA 2.0.

    The fixed fee for regularisation drawings

    Drawings
    from £629
    Measured survey
    £200
    Total you pay
    from £829
    Council fee
    paid to the council separately

    No VAT to add. The fee is fixed in writing after a free constraints check of your address.

    What you get

    • A measured survey of the work as built
    • As-built plans, sections and elevations
    • A written list of the upgrades the inspector is likely to ask for
    • Inspection points marked on the drawings
    • The regularisation application prepared and submitted for you
    • More about our regularisation drawings
    Brick house under construction with a large new opening in the rear wall spanned by a steel beam

    Building regulations

    How much do building regulations drawings cost in London?

    Building regulations drawings are one fixed fee, and the building control charge is a second bill paid to the council or a private inspector. Here is how both work, with a real London figure.

    From £7294 minute read

    Glazed double doors in a new blockwork rear extension, with a scaffold tower and a wheelbarrow on the unfinished floor

    Building regulations

    How much do construction drawings cost in London?

    Construction drawings are the set a builder prices and builds from, one step past the planning set. Here is what they cost, what they add, and how they protect a London project from quote creep.

    From £9693 minute read

    Bright modern extension interior with a large glazed wall, dining table and seating facing the garden

    Building regulations

    How much do SAP calculations cost in London?

    Many extensions pass the energy rules with no calculation at all. When one is needed, it costs less than most people expect. Here is how to tell if your project needs it, and what we charge.

    From £2253 minute read

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.