How much do wraparound extension drawings cost in London?

Drawings for a wraparound extension to a London house cost £869 drawings + £200 survey (£1,069 total), which is more than a side return or a rear extension alone because one design has to satisfy the rules for both. The council's planning fee is £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026 where an application is needed, and the main question is whether the combined extension can stay within the limits at all.

From £1,069 total, survey included

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, no VAT to add

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Key takeaways

    Why a wraparound costs more than its two halves

    A wraparound is two extensions designed as one: the strip beside the house and the space behind it, joined at the corner. Its drawings are £869 drawings + £200 survey (£1,069 total). The set is larger than for either half alone, because the corner is where the structure, the roof and the neighbour relationships all meet.

    The extra drawing time goes on the junctions. Two roofs meet at a valley, the new corner is often glazed, and the beam over the old rear wall continues round into the side. Each of those is drawn to a level a builder can price.

    What the job costs: our fee from £1,069Drawings: £869. Measured survey: £200. National planning fee, extension or alteration to a single house: £548 (paid to others)Drawings£869Measured survey£200National planning fee, extension oralteration to a single house£548Total to us, from £1,069; other costs are paid direct
    Our fixed fee beside the council's planning fee. The council's fee is paid to the council, not through us.

    Permitted development rarely stretches this far

    Each part has its own limit, and then the whole is tested again. For the side: single storey, no more than 4 metres high, no wider than half the original houseGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class A. For the rear: 4 metres beyond the rear wall if detached, 3 metres for any other house, single storeyGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class A. And together: any total enlargement must stay within the limits for the side and rear parts togetherGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class A, paragraph A.1(ja). A wraparound that is generous on both sides of the corner can pass each test alone and still fail the combined one.

    In a conservation area there is nothing to measure: no side extensions on article 2(3) land, which includes conservation areasGeneral Permitted Development Order 2015, Schedule 2, Part 1, paragraph A.2, and article 2(3). Most London wraparounds therefore go through a planning application, for which the council charges £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026. Our planning drawings route is the one we use, and our wraparound extension drawings page lists the set.

    Aerial view of rows of brick terraced houses with rear outriggers and roof windows along a suburban London street
    The gap beside each outrigger is the space a wraparound fills, and each neighbour sees the result. Photo: Altaf Shah, Pexels License

    Glass, light and the energy rules

    Wraparounds are usually glazed, since the point is light into a deep plan. The energy guidance for the Building Regulations limits how much: no more than 25% of the extension floor area, plus any openings lost to the extensionApproved Document L, Volume 1, 2021 edition, section 10. That is a design constraint worth knowing early, because a wall of glass beyond the allowance needs an energy calculation instead of a simple check. Our SAP calculations start from £225.

    We position the glazing on the drawings and test it against the limit, so you know before the planning stage whether the design needs more evidence.

    Two boundaries, two notices

    A wraparound usually touches the shared boundary on one side and runs against the neighbour's garden on the other. A new wall on the boundary needs: a notice served at least one month before the building work startsParty Wall etc. Act 1996, section 1. Work to an existing party wall needs a party structure notice must be served at least two months before the work beginsParty Wall etc. Act 1996, section 3. Each adjoining owner gets their own notice, from £45 each.

    The structural pack is also larger than for a simple extension: our structural calculations start from £385, and the construction details, building regulations drawings, from £729.

    How the job runs, step by stepFree constraints check of your address and a fixed quote Then: Measured survey of the house, side and garden Then: Plans, elevations and sections of the combined extension Then: Glazing and junctions tested on the drawings Then: Planning application prepared and sent for you Then: Free redraws if the council asks for changesFree constraints check of your addressand a fixed quoteMeasured survey of the house, side andgardenPlans, elevations and sections of thecombined extensionGlazing and junctions tested on thedrawingsPlanning application prepared and sentfor youFree redraws if the council asks forchanges
    From constraints check to a submitted planning application.

    Keeping the budget sensible

    The biggest saving is a clear brief. Decide the room uses and the glazing early, because a changed corner means redrawing the section and recalculating the beam. The next is taking planning advice before drawing: if a small trim to the rear depth would let the design pass the combined test, the planning fee and the wait may fall away.

    If the council asks for changes to the drawings, we redraw them free until the application is approved.

    The figures, with sources

    National planning fee, extension or alteration to a single house
    £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026Checked 25 October 2026
    Combined limits
    any total enlargement must stay within the limits for the side and rear parts togetherGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class A, paragraph A.1(ja)Checked 25 October 2026
    Side part limit
    single storey, no more than 4 metres high, no wider than half the original houseGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class AChecked 25 October 2026
    Rear part limit
    4 metres beyond the rear wall if detached, 3 metres for any other house, single storeyGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class AChecked 25 October 2026
    Side extensions on article 2(3) land
    no side extensions on article 2(3) land, which includes conservation areasGeneral Permitted Development Order 2015, Schedule 2, Part 1, paragraph A.2, and article 2(3)Checked 25 October 2026
    Notice to build a new wall on the line of junction
    a notice served at least one month before the building work startsParty Wall etc. Act 1996, section 1Checked 25 October 2026
    Notice for work to a party structure
    a party structure notice must be served at least two months before the work beginsParty Wall etc. Act 1996, section 3Checked 25 October 2026
    Glazing allowance in an extension
    no more than 25% of the extension floor area, plus any openings lost to the extensionApproved Document L, Volume 1, 2021 edition, section 10Checked 25 October 2026

    Questions

    Why does a wraparound cost more than a rear extension?

    It is a larger and more complex design: a side part and a rear part joined at the corner, with more structure and more neighbour relationships. The set is bigger, and so is the fee.

    Can I do a wraparound under permitted development?

    Only if every part and the total stay within the limits, and never in a conservation area. We test your plot against them before quoting, and say plainly when planning is needed.

    Do I need a party wall notice?

    If the extension touches or builds against a shared boundary, yes. Each affected neighbour gets a notice, and we can prepare them.

    How long do the drawings take?

    Normally about a week after the survey, though a wraparound set is larger than a simple extension. The council's decision time is separate.

    Header photo: A bright modern extension interior with a large glazed wall, dining table and seating facing the garden by Max Vakhtbovych, Pexels License.

    The fixed fee for wraparound extension drawings

    Drawings
    from £869
    Measured survey
    £200
    Total you pay
    from £1,069
    Council fee
    paid to the council separately

    No VAT to add. The fee is fixed in writing after a free constraints check of your address.

    What you get

    • A measured survey of your house and boundaries
    • Existing and proposed plans, elevations and sections
    • Junction details where the side and rear parts meet
    • Planning application prepared and submitted for you
    • Free redraws until approval
    • More about our wraparound extension drawings
    Red-brick house with a slate roof and roof windows, a low glazed extension on its garden side and a striped lawn in front

    Extensions and lofts

    How much do garden room drawings cost in London?

    A garden room is often allowed without a planning application, but only inside tight rules on height, boundaries and use. Here is what the drawings cost and how to tell which side of the line you are on.

    From £4793 minute read

    Loft bedroom with a pitched ceiling, two roof windows and glazed doors opening onto a small balcony

    Extensions and lofts

    How much do loft conversion drawings cost in London?

    Loft drawings are one fixed fee, but the council's charge, the structure and the party wall add to the bill. Here is what drives each, and how to tell if a loft needs planning at all.

    From £6794 minute read

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.