020 7131 9703Request a fixed quote
Row of colour-washed Victorian terrace houses on Falkland Road in Kentish Town under a blue sky

Blog: extensions and lofts

How much do side return extension drawings cost in London?

Drawings for a side return extension to a London terrace cost £529 drawings + £200 survey (£729 total), and the council's fee for a planning application is £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026 where one is needed. The strip beside a back room is narrow, so the real cost is rarely the room; it is the shared boundary wall, which brings a party wall notice, and the rules that apply near it.

From £729 total, survey included

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, no VAT to add

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Key takeaways

    What you pay for, and what the council charges

    A side return is one of the most common London extensions, and the drawings are priced at £529 drawings + £200 survey (£729 total). That covers the measured survey, the existing layout and the proposed room, with the elevations and section that show how the new roof meets the old and the neighbour's boundary.

    If the extension is not permitted development, the council charges £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026 to decide an application for it. If it is, you may prefer written proof; our lawful development certificate costs half the planning fee at the council, with our drawings from £629.

    What the job costs: our fee from £729Drawings: £529. Measured survey: £200. National planning fee, extension or alteration to a single house: £548 (paid to others)Drawings£529Measured survey£200National planning fee, extension oralteration to a single house£548Total to us, from £729; other costs are paid direct
    Our fixed fee beside the council's planning fee. The council's fee is paid to the council, not through us.

    The limits that decide whether you need planning permission

    For a side extension the permitted development test is different from a rear one. The rule is: single storey, no more than 4 metres high, and no wider than half the original houseGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class A. On a narrow terrace the half-width test is rarely the problem. The height of the eaves is, because a side return built against the boundary is limited: eaves of no more than 3 metres where the enlarged part is within 2 metres of the boundary of the curtilageGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class A.

    In a conservation area the door is shut: no side extensions on article 2(3) land, which includes conservation areasGeneral Permitted Development Order 2015, Schedule 2, Part 1, paragraph A.2, and article 2(3). A large share of London's terraces sit in conservation areas, so check yours first. We do that at the constraints check and tell you before you spend anything on drawings.

    Flat-fronted Victorian house of 1898 in brick and stone with arched sash windows and a bay
    Period terraces are the usual setting for a side return, and often sit in a conservation area. Photo: sludgegulper, CC BY-SA 2.0

    Why the design is mostly about the boundary

    A side return infill usually runs along the neighbour's garden wall. The new roof is often a glazed lantern or a sloping rooflight, and where it meets the neighbour's wall the junction decides whether the neighbour will object. A low wall height, a clean parapet and a rooflight that does not overhang the boundary all help.

    We show these details on the section drawing so the officer, and the neighbour, can see the answer without asking. Our side return extension drawings page lists what is in the set, and a wraparound design is covered separately.

    The neighbour's wall: the notice and what it costs

    Building on or against a shared boundary wall brings the Party Wall etc. Act into play. A new wall on the boundary needs: a notice served at least one month before the building work startsParty Wall etc. Act 1996, section 1. Where you cut into or build on an existing party wall, a party structure notice must be served at least two months before the work beginsParty Wall etc. Act 1996, section 3.

    We prepare the notices, from £45 for each adjoining owner. If the neighbour consents, it ends there; if not, surveyors are appointed and the cost grows. Speaking to the neighbour before the notice arrives is the most useful saving available.

    How the job runs, step by stepFree constraints check of your address and a fixed quote Then: Measured survey of the house and the boundary Then: Plans, elevations and a section of the junction with the neighbour's wall Then: Route chosen: certificate or planning application Then: Application prepared and sent for you Then: Free redraws if the council asks for changesFree constraints check of your addressand a fixed quoteMeasured survey of the house and theboundaryPlans, elevations and a section of thejunction with the neighbour's wallRoute chosen: certificate or planningapplicationApplication prepared and sent for youFree redraws if the council asks forchanges
    From constraints check to a submitted application or certificate.

    The rest of the budget

    A side return opens the old back wall, so a steel beam is nearly certain: our structural calculations start from £385, and the construction set, building regulations drawings, from £729. Householders also benefit from the levy exemption: an owner who lives in the house as sole or main residence is exempt from CIL on a residential extensionCommunity Infrastructure Levy Regulations 2010, regulation 42A.

    The figures, with sources

    National planning fee, extension or alteration to a single house
    £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026Checked 25 October 2026
    Permitted development limit for a side extension
    single storey, no more than 4 metres high, and no wider than half the original houseGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class AChecked 25 October 2026
    Eaves near a boundary
    eaves of no more than 3 metres where the enlarged part is within 2 metres of the boundary of the curtilageGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class AChecked 25 October 2026
    Side extensions on article 2(3) land
    no side extensions on article 2(3) land, which includes conservation areasGeneral Permitted Development Order 2015, Schedule 2, Part 1, paragraph A.2, and article 2(3)Checked 25 October 2026
    Notice to build a new wall on the line of junction
    a notice served at least one month before the building work startsParty Wall etc. Act 1996, section 1Checked 25 October 2026
    Notice for work to a party structure
    a party structure notice must be served at least two months before the work beginsParty Wall etc. Act 1996, section 3Checked 25 October 2026
    CIL exemption for residential extensions
    an owner who lives in the house as sole or main residence is exempt from CIL on a residential extensionCommunity Infrastructure Levy Regulations 2010, regulation 42AChecked 25 October 2026

    Questions

    What is a side return extension?

    It fills the narrow strip of garden beside the back room of a house that has a rear outrigger, which is common in Victorian terraces. It widens the kitchen or dining room to the full width of the plot.

    Do I need my neighbour's permission?

    Not permission, but notice. Building on or against the shared boundary needs a party wall notice, and the neighbour can consent or dissent. Planning is separate, and neighbours are also told about a planning application.

    Is a side return the same as a wraparound?

    No. A side return fills the strip beside the house, while a wraparound combines that with a rear extension. The wraparound has its own drawings and its own, larger, set of limits.

    How long do the drawings take?

    Normally about a week after the survey. The council's decision time is separate and we cannot promise it.

    Header photo: A row of colour-washed Victorian terrace houses on Falkland Road in Kentish Town under a blue sky by Images George Rex, CC BY-SA 2.0.

    The fixed fee for side return extension drawings

    Drawings
    from £529
    Measured survey
    £200
    Total you pay
    from £729
    Council fee
    paid to the council separately

    No VAT to add. The fee is fixed in writing after a free constraints check of your address.

    What you get

    • A measured survey of your house and boundary
    • Existing and proposed plans, elevations and sections
    • The right route chosen and explained
    • Application or certificate prepared and submitted for you
    • Free redraws until approval
    • More about our side return extension drawings
    Red-brick house with a slate roof and roof windows, a low glazed extension on its garden side and a striped lawn in front

    Extensions and lofts

    How much do garden room drawings cost in London?

    A garden room is often allowed without a planning application, but only inside tight rules on height, boundaries and use. Here is what the drawings cost and how to tell which side of the line you are on.

    From £4793 minute read

    Loft bedroom with a pitched ceiling, two roof windows and glazed doors opening onto a small balcony

    Extensions and lofts

    How much do loft conversion drawings cost in London?

    Loft drawings are one fixed fee, but the council's charge, the structure and the party wall add to the bill. Here is what drives each, and how to tell if a loft needs planning at all.

    From £6794 minute read

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.