How much do rear extension drawings cost in London?

Drawings for a rear extension to a London house cost £479 drawings + £200 survey (£679 total). The council's own charge depends on the route: £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026 for a planning application, or £249Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026 if the extension qualifies for prior approval as a larger home extension. Which route fits is decided by how far the extension reaches, so that is the first thing to measure.

From £679 total, survey included

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, no VAT to add

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Key takeaways

    What you pay for a rear extension, and to whom

    A rear extension has three kinds of cost that people tend to blur. The first is the design and drawing work, which is ours: £479 drawings + £200 survey (£679 total). The second is what the council charges, which changes with the route. The third is the build itself, which we do not quote because it belongs to your builder and depends on the specification.

    The drawings are the same drawings whichever route you take, because the council and the builder both need to see the existing house and the proposed extension on paper. That is why we price them once, with the survey in, rather than by route.

    What the job costs: our fee from £679Drawings: £479. Measured survey: £200. National planning fee, extension or alteration to a single house: £548 (paid to others)Drawings£479Measured survey£200National planning fee, extension oralteration to a single house£548Total to us, from £679; other costs are paid direct
    Our fixed fee beside the council's planning fee. A prior approval costs the council less, but follows the same drawings.

    How far the extension reaches decides the route

    For a single-storey rear extension the rules turn on depth. Without a planning application, the limit is 4 metres beyond the rear wall of the original house if detached, or 3 metres for any other houseTown and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A. Within that, the work can be confirmed with a lawful development certificate, which we price from £629, or built without one.

    Between that and the larger limit is prior approval. The rules allow a single-storey extension to reach 8 metres beyond the rear wall of the original house if detached, or 6 metres for any other houseGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class A, but the council must be told, the neighbours are consulted, and the council has 42 daysGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class A to respond. The council fee is £249Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026, and our matching prior approval drawings start from £579.

    Anything beyond that, or anything that does not meet the other conditions, needs a full planning application. Our rear extension drawings cover all three routes, and we tell you which one fits before you commit.

    The measurements that catch people out in London

    Depth is only one test. Where an extension sits near a boundary the height of its eaves matters: eaves of no more than 3 metres where the enlarged part is within 2 metres of the boundary of the curtilageGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class A. London gardens are often narrow, so this one limits more extensions than depth does.

    The rules also measure from the original house, not the house as it stands today. If a previous owner has already added a rear extension, it counts against your allowance, and a house in a conservation area or a flat has different rules again. A measured survey and a look at the planning history settle this in a day, which is why it is the first thing we do.

    Single-storey rear extension in grey blockwork under construction with a steel beam spanning the new opening in the old rear wall
    The new opening in the old rear wall is carried on a steel beam, which is designed and priced separately from the drawings. Photo: Brett Jordan, Pexels License

    The costs that sit next to the drawings

    Almost every rear extension opens up the back wall, which needs a beam. The calculations for it are our structural calculations item, from £385. The build must also meet the Building Regulations whichever planning route you took, and the drawings for that are a separate set: our building regulations drawings start from £729.

    If you share a wall with a neighbour, the Party Wall etc. Act asks for notice. For work on a party wall, a party structure notice must be served at least two months before the work beginsParty Wall etc. Act 1996, section 3. We prepare the notices from £45 per adjoining owner, and the neighbour's reply decides whether a surveyor is also needed.

    A small piece of good news: the Community Infrastructure Levy, which London councils charge on new floor space, has an exemption for householders. an owner who lives in the house as their sole or main residence is exempt from CIL on a residential extensionCommunity Infrastructure Levy Regulations 2010, regulation 42A. Ask your council how to claim it before work starts.

    Where a sensible saving is, and where it is not

    The surest saving is choosing the right route early, because paying for a full application when prior approval would do, or the other way round, wastes a fee and weeks. The next is a design that fits the limits: pulling an extension back to the depth that avoids prior approval saves the council's charge and the neighbour consultation, and sometimes costs less in the build too.

    A saving that does not work is leaving out the survey and drawing from old plans. Old plans are routinely out by tens of millimetres, and a wrong existing plan is the commonest cause of a planning application being sent back or a builder's quote being revised.

    How the job runs, step by stepFree constraints check of your address and a fixed quote Then: Measured survey of the house as it stands Then: Plans, elevations and sections of the extension drawn Then: Route chosen: certificate, prior approval or planning Then: Application prepared and sent for you Then: Free redraws if the council asks for changesFree constraints check of your addressand a fixed quoteMeasured survey of the house as itstandsPlans, elevations and sections of theextension drawnRoute chosen: certificate, priorapproval or planningApplication prepared and sent for youFree redraws if the council asks forchanges
    From constraints check to a valid application or notification.

    The figures, with sources

    National planning fee, extension or alteration to a single house
    £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026Checked 25 October 2026
    National fee, prior approval for a larger home extension
    £249Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026Checked 25 October 2026
    Permitted development limit for a single-storey rear extension
    4 metres beyond the rear wall of the original house if detached, or 3 metres for any other houseTown and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class AChecked 25 October 2026
    Larger home extension limit, single storey, with prior approval
    8 metres beyond the rear wall of the original house if detached, or 6 metres for any other houseGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class AChecked 25 October 2026
    Prior approval: time before the developer may proceed if the council is silent
    42 daysGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class AChecked 25 October 2026
    Eaves near a boundary
    eaves of no more than 3 metres where the enlarged part is within 2 metres of the boundary of the curtilageGeneral Permitted Development Order 2015, Schedule 2, Part 1, Class AChecked 25 October 2026
    Notice for work to a party structure
    a party structure notice must be served at least two months before the work beginsParty Wall etc. Act 1996, section 3Checked 25 October 2026
    CIL exemption for residential extensions
    an owner who lives in the house as their sole or main residence is exempt from CIL on a residential extensionCommunity Infrastructure Levy Regulations 2010, regulation 42AChecked 25 October 2026

    Questions

    Do rear extension drawings cost the same on every route?

    Our drawings are priced once, at £479 drawings + £200 survey (£679 total), whichever route you choose. What changes is the council's charge, the notices needed and how long the council has to respond.

    How long are rear extension drawings valid for?

    The drawings themselves do not expire, but a permission or a prior approval does have a time limit for starting work. The council's decision notice states it, and we point it out when it arrives.

    Do I need a survey if I already have plans?

    We start from a measured survey because old plans are often wrong in the details that decide a planning application. The survey is already inside the price, so there is no saving in skipping it.

    Can I build a two-storey rear extension under the same route?

    Two storeys are treated differently and are far more restricted. Our double-storey extension drawings page covers that case.

    Header photo: The back of a semi-detached house with a single-storey rear extension being built in grey blockwork, scaffolding and bricks on the lawn by Brett Jordan, Pexels License.

    The fixed fee for rear extension drawings

    Drawings
    from £479
    Measured survey
    £200
    Total you pay
    from £679
    Council fee
    paid to the council separately

    No VAT to add. The fee is fixed in writing after a free constraints check of your address.

    What you get

    • A measured survey of your house
    • Existing and proposed plans, elevations and sections
    • The right route chosen and explained
    • Application or notification prepared and submitted for you
    • Free redraws until approval
    • More about our rear extension drawings
    Red-brick house with a slate roof and roof windows, a low glazed extension on its garden side and a striped lawn in front

    Extensions and lofts

    How much do garden room drawings cost in London?

    A garden room is often allowed without a planning application, but only inside tight rules on height, boundaries and use. Here is what the drawings cost and how to tell which side of the line you are on.

    From £4793 minute read

    Loft bedroom with a pitched ceiling, two roof windows and glazed doors opening onto a small balcony

    Extensions and lofts

    How much do loft conversion drawings cost in London?

    Loft drawings are one fixed fee, but the council's charge, the structure and the party wall add to the bill. Here is what drives each, and how to tell if a loft needs planning at all.

    From £6794 minute read

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.